The Thames Water Utilities Limited (Thames Tideway Tunnel) Order 2014

United Kingdom · regulation

Ask the law about thisMore laws of United KingdomFor machines: Markdown

Open at the publisher →

In force since 2022-11-24, as the publisher states.

Copy read on 2026-11-10. The page it was read from

Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.

sha256 f243c6c9a75573648c27ad416e2c696b486064a01514b25358a6ecf1f7b94063

Contents: 83 provisions
  1. Title and introductory text
  2. 1 Citation and Commencement
  3. 2 Interpretation
  4. 3 Development consent etc. granted by the Order
  5. 4 Authorisation of use
  6. 5 Maintenance of authorised project
  7. 6 Limits of Deviation
  8. 7 Defence to proceedings in respect of statutory nuisance
  9. 8 Benefit of Order
  10. 9 Transfer of benefit of Order
  11. 10 Street works
  12. 11 Power to alter layout, etc., of streets
  13. 12 Construction and maintenance of altered streets
  14. 13 Stopping up of streets
  15. 14 Public rights of way and permissive paths
  16. 15 Temporary stopping up
  17. 16 Access to works
  18. 17 Agreements with street authorities
  19. 18 Traffic regulation
  20. 19 Discharge of water
  21. 20 Protective works to buildings and structures
  22. 21 Remedial works to buildings, or apparatus or equipment
  23. 22 Authority to survey and investigate the land
  24. 23 Removal of human remains
  25. 24 Cemex
  26. 25 Felling or lopping of trees
  27. 26 Trees subject to tree preservation orders
  28. 27 Trees in conservation areas
  29. 28 Compulsory acquisition of land
  30. 29 Compulsory acquisition of rights
  31. 30 Acquisition of subsoil only
  32. 31 Acquisition of land limited to subsoil lying more than 9 metres beneath surface
  33. 32 Power to override easements and other rights
  34. 33 Statutory authority to override easements and other rights
  35. 34 Application of the Compulsory Purchase (Vesting Declarations) Act 1981
  36. 35 Temporary use of land for carrying out the authorised project
  37. 36 Temporary use of land for maintaining authorised project
  38. 37 Disregard of certain interests and improvements
  39. 38 Set-off for enhancement in value of retained land
  40. 39 No double recovery
  41. 40 Compulsory acquisition of land – incorporation of the mineral code
  42. 41 Acquisition of part of certain properties
  43. 42 Statutory undertakers
  44. 43 Apparatus and rights of statutory undertakers in stopped-up streets
  45. 44 Recovery of costs of new connections
  46. 45 Time limit for exercise of authority to acquire land compulsorily
  47. 46 Private rights of way
  48. 47 Public rights of navigation
  49. 48 Rights under or over streets and city walkways
  50. 49 Application of landlord and tenant law
  51. 50 Deemed marine licence
  52. 51 Miscellaneous provisions relating to the 1990 Act
  53. 52 Safeguarding
  54. 53 Provisions for protection of specified undertakers
  55. 54 Discharge of requirements etc.
  56. 55 Removal of consent requirements
  57. 56 Application, disapplication and modification of legislative provisions
  58. 57 Amendment of local legislation
  59. 58 Application of pipe subways legislation
  60. 59 Other legislation in the City of London
  61. 60 Unilateral undertaking – Project-wide matters
  62. 61 Certification of plans etc
  63. 62 Meaning of Secretary of State
  64. 63 Arbitration
  65. SCHEDULE 1 AUTHORISED PROJECT
  66. SCHEDULE 2 PLANS
  67. SCHEDULE 3 REQUIREMENTS
  68. SCHEDULE 4 STREETS SUBJECT TO STREET WORKS
  69. SCHEDULE 5 STREETS SUBJECT TO ALTERATION OF LAYOUT
  70. SCHEDULE 6 STREETS TO BE STOPPED UP
  71. SCHEDULE 7 PUBLIC RIGHTS OF WAY AND PERMISSIVE PATHS TO BE EXTINGUISHED
  72. SCHEDULE 8 STREETS AND RIGHTS OF WAY ETC. TO BE TEMPORARILY STOPPED UP
  73. SCHEDULE 9 ACCESS TO WORKS
  74. SCHEDULE 10 TRAFFIC REGULATION
  75. SCHEDULE 11 PROTECTIVE WORKS
  76. SCHEDULE 12 PUBLIC RIGHTS OF NAVIGATION TO BE AFFECTED BY THE AUTHORISED PROJECT
  77. SCHEDULE 13 LAND OF WHICH ONLY SUBSOIL MORE THAN 9 METRES BENEATH THE SURFACE MAY BE ACQUIRED
  78. SCHEDULE 14 LAND OF WHICH TEMPORARY POSSESSION MAY BE TAKEN
  79. SCHEDULE 15 DEEMED MARINE LICENCE
  80. SCHEDULE 16 PROVISIONS FOR PROTECTION OF SPECIFIED UNDERTAKERS
  81. SCHEDULE 17 PROCEDURE FOR DISCHARGE OF REQUIREMENTS ETC. AND APPEALS
  82. SCHEDULE 18 REMOVAL OF CONSENT REQUIREMENTS
  83. SCHEDULE 19 MISCELLANEOUS CONTROLS

Proposed changes to this act

No one has proposed a change to this act yet.

How this law is officially changed

Solon does not know this law's official route yet. The proposal is recorded all the same, and the route appears here once its source is added.

83 provisions

SCHEDULE 17 PROCEDURE FOR DISCHARGE OF REQUIREMENTS ETC. AND APPEALS

Article 54 Applications made under requirements 1 (1) Where the undertaker proposes to make an application to a discharging authority for any consent, agreement or approval required by a requirement, it shall no later than twenty eight days prior to submitting such application provide a draft of the proposed application to the discharging authority, unless otherwise agreed by the discharging authority. It shall on the same date provide a complete draft of the proposed application to any requirement consultee and shall affix a notice to a conspicuous object or objects on or near the site of the works which are the subject of such application which shall give details of the proposed application together with the address within the locality where application documents may be inspected and details of the manner in which representations on the application may be made. (2) Where an application has been made to a discharging authority for any consent, agreement or approval required by a requirement included in this Order, the discharging authority shall give notice to the undertaker of their decision on the application within a period of 8 weeks beginning with— (a) the day immediately following that on which the application is received by the authority; (b) the day immediately following that on which further information has been supplied by the undertaker under paragraph 2; or (c) such longer period as may be agreed by the undertaker and the discharging authority in writing. (3) In determining any application under this paragraph the discharging body may either grant or refuse consent, and where consent is refused the discharging authority must provide its reasons for the refusal with the notice of refusal. Further information regarding requirements 2 (1) In relation to any application further to a requirement, the discharging authority shall have the right to request such further information from the undertaker as is necessary to enable it to consider the application. (2) In the event that the discharging authority considers such further information to be necessary and the requirement does not specify that consultation with a statutory consultee is required, it shall, within 7 business days of receipt of the application, notify the undertaker in writing specifying the further information required. (3) In the event that the requirement specifies that consultation with a requirement consultee is required, the discharging authority shall issue the consultation to the requirement consultee within 3 business days of receipt of the application, and shall notify the undertaker in writing specifying any further information requested by the requirement consultee within 1 business day of receipt of such a request and in any event within 15 business days of receipt of the application. (4) In the event that the discharging authority does not give such notification within this 7 business day period as referred to in paragraph 2(2) it shall be deemed to have sufficient information to consider the application and shall not thereafter be entitled to request further information without the prior agreement of the undertaker. Fees further to requirements 3 (1) Where an application is made to the discharging authority for written consent, agreement or approval in respect of a requirement, a fee shall be paid to that authority as follows— (a) fees shall be calculated in accordance with the following table— Category 1 | The erection of buildings— (i) where no floor space is to be created by the development, £170; (ii) where the area of gross floor space to be created by the development does not exceed 40 metres, £170; (iii) where the area of the gross floor space to be created by the development exceeds 40 square metres, but does not exceed 75 square metres, £335; (iv) where the area of the gross floor space to be created by the development exceeds 75 square metres, but does not exceed 3750 square metres, £335 for each 75 square metres of that area; (v) where the area of gross floor space to be created by the development exceeds 3750 square metres, £16,565; and an additional £100 for each 75 square metres Category 2 | The carrying out of any operations not coming within Category 1, £170 for each 0.1 hectare of the site area, subject to a maximum £1,690 (b) where an application is made for discharge of a requirement (“current application”) in respect of which an application has been made previously, the fee payable in respect of the current application shall be £335. (2) For the purpose of the calculation of fees pursuant to sub-paragraph 3(1)(a)— (a) the area shall be taken as consisting of the area of land to which the application relates; (b) where the application relates to development within Category 1, the area of gross floor space created by the development shall be ascertained by external measurement of the floor space, whether or not it is bounded (wholly or partly) by external walls of a building; (c) where the application relates to development within Category 1 and the gross floor space to be created by the development exceeds 75 square metres and is not an exact multiple of 75 square metres, the area remaining after division of the total number of square metres of gross floorspace by the figure of 75 shall be treated as being 75 metres; and (d) where the application relates to development within Category 2 and the site area exceeds 0.1 hectares and is not an exact multiple of 0.1 hectares, the area remaining after division of the total number of hectares by the figure of 0.1 hectares shall be treated as being 0.1 hectares. Appeals 4 (1) Save as otherwise provided in this Order, the undertaker may appeal in the event that— (a) the discharging authority refuses an application for any consent, agreement or approval required or permitted by— (i) a requirement included in this Order; or (ii) a document referred to in any requirement included in this Order (unless such consent, agreement or approval has to be obtained by virtue of any other legal requirement); or (iii) any other provision of this Order; or does not determine such an application within the time period set out; or grants it subject to conditions; (b) the discharging authority issues a notice further to sections 60 and or 61 of the Control of Pollution Act 1974; (c) on receipt of a request for further information pursuant to paragraph 2 of this Schedule, the undertaker considers that either the whole or part of the specified information requested by the discharging authority is not necessary for consideration of the application; or (d) on receipt of any further information requested, the discharging authority notifies the undertaker that the information provided is inadequate and requests additional information which the undertaker considers is not necessary for consideration of the application. (2) The appeal process shall be as follows— (a) any appeal by the undertaker must be made within forty two days of the date of the notice of the decision or determination, or (where no determination has been made) expiry of the time period set out, giving rise to the appeal as referred to in paragraph (1); (b) the undertaker shall submit the appeal documentation to the Secretary of State and shall on the same day provide copies of the appeal documentation to the discharging authority and any requirement consultee and shall on the same date affix a notice to a conspicuous object or objects on or near the site of the works which are the subject of such appeal which shall give details of the decision of the discharging authority and of the application and notice that an appeal has been made together with the address within the locality where appeal documents may be inspected and details of the manner in which representations on the appeal may be made; (c) as soon as is practicable after receiving the appeal documentation, the Secretary of State shall appoint a person to consider the appeal (“the appointed person”) and shall notify the appeal parties of the identity of the appointed person and the address to which all correspondence for their attention should be sent; (d) the discharging authority and any requirement consultee (if applicable) shall submit their written representations together with any other representations received by them pursuant to the notice of application referred to in paragraph 1 (1) or the notice of appeal referred to in paragraph 1 (2) (b) of this Schedule to the appointed person in respect of the appeal within 10 business days of the start date and shall ensure that copies of their written representations and any other representations as sent to the appointed person are sent to each other and to the undertaker on the day on which they are submitted to the appointed person; (e) the appeal parties shall make any counter-submissions to the appointed person within 10 business days of receipt of written representations pursuant to paragraph (d) above; and (f) the appointed person shall make a decision and notify it to the appeal parties, with reasons, as soon as reasonably practicable. (3) The appointment of the person pursuant to sub-paragraph (2)(c) may be undertaken by a person appointed by the Secretary of State for this purpose instead of by the Secretary of State. (4) In the event that the appointed person considers that further information is necessary to enable the appointed person to consider the appeal they shall as soon as practicable notify the appeal parties in writing specifying the further information required, the appeal party from whom the information is sought, and the date by which the information is to be submitted. (5) Any further information required pursuant to sub-paragraph (4) shall be provided by the party from whom the information is sought to the appointed person and to other appeal parties by the date specified by the appointed person. The appointed person shall notify the appeal parties of the revised timetable for the appeal on or before that day. The revised timetable for the appeal shall require submission of written representations to the appointed person within 10 business days of the agreed date but shall otherwise be in accordance with the process and time limits set out in sub-paragraph (2)(c)-(e). (6) On an appeal under this paragraph, the appointed person may— (a) allow or dismiss the appeal, or (b) reverse or vary any part of the decision of the discharging authority (whether the appeal relates to that part of it or not), and may deal with the application as if it had been made to him in the first instance. (7) The appointed person may proceed to a decision on an appeal taking into account such written representations as have been sent within the relevant time limits and in its sole discretion such written representations as have been sent out with the relevant time limits. (8) The appointed person may proceed to a decision even though no written representations have been made within the relevant time limits, if it appears to him that there is sufficient material to enable a decision to be made on the merits of the case. (9) The decision of the appointed person on an appeal shall be final and binding on the parties, and a court may entertain proceedings for questioning the decision only if the proceedings are brought by a claim for judicial review. (10) If an approval is given by the appointed person pursuant to this Schedule, it shall be deemed to be an approval for the purpose of Schedule 3 (requirements) of this Order as if it had been given by the discharging authority. The discharging authority may confirm any determination given by the appointed person in identical form in writing but a failure to give such confirmation (or a failure to give it in identical form) shall not be taken to affect or invalidate the effect of the appointed person’s determination. (11) Save where a direction is given pursuant to sub-paragraph (12) requiring the costs of the appointed person to be paid by the discharging authority, the reasonable costs of the appointed person shall be met by the undertaker. (12) On application by the discharging authority or the undertaker, the appointed person may give directions as to the costs of the appeal parties and as to the parties by whom the costs of the appeal are to be paid. In considering whether to make any such direction and the terms on which it shall be made, the appointed person shall have regard to Communities and Local Government Circular 03/2009 or any circular or guidance which may from time to time replace it.

Propose a change

SCHEDULE 18 REMOVAL OF CONSENT REQUIREMENTS

Article 55 Consent pursuant to Ss. 109-110 Water Resources Act 1991, Land Drainage Act 1991, or associated byelaws made further to Schedule 25 of Water Resources Act 1991 Consent under section 23 of the Land Drainage Act 1991

Propose a change

SCHEDULE 19 MISCELLANEOUS CONTROLS

Articles 56 and 57 PART 1 PUBLIC GENERAL LEGISLATION Introduction 1 This Part 1 of this Schedule applies, modifies and excludes statutory provisions which relate to matters for which provision may be made in this Order. Highways Act 1980 2 (1) Section 141 of the Highways Act 1980 (restriction on planting trees etc. in or near carriageway) shall not apply to any tree or shrub planted in the course of the authorised project before completion of construction. (2) Section 167 of that Act (powers relating to retaining walls near streets) shall not apply in relation to— (a) the erection of a wall in the course of the authorised project before completion of construction, or (b) a wall on land on which works are being carried out, or are to be carried out, in pursuance of the authorised project before completion of construction. (3) Sections 169(1), 172 and 173 of that Act (control of scaffolding on highways, hoardings to be set up during building etc, and hoardings to be securely erected) shall not apply to anything done in the course of the authorised project before completion of construction. Building Act 1984 3 Nothing in Part 1 of the Building Act 1984 with respect to building regulations, and nothing in any building regulations, shall apply in relation to a building used, or intended for use, by the undertaker for the purposes of the authorised project before completion of construction. New Roads and Street Works Act 1991 4 (1) The powers conferred by section 56(1) and (1A) of the New Roads and Street Works Act 1991 (powers to give directions as to the timing of proposed and subsisting street works) shall not apply in relation to the authorised project. (2) Section 56A of that Act (power to give directions as to placing of apparatus) shall not apply in relation to the placing of apparatus in the course of the authorised project. (3) No restriction under section 58(1) of that Act (power to impose restriction on execution of street works in the twelve months following completion of substantial road works) shall have effect in relation to the authorised project. (4) Section 61(1) of that Act (under which the consent of the street authority is required for the placing of apparatus in a protected street) shall not apply to the placing of apparatus in the course of the authorised project. (5) Section 62(2) of that Act (power following designation of protected street to require removal or repositioning of apparatus already placed in the street) shall not apply in relation to apparatus placed in the course of the authorised project. (6) Section 62(4) of that Act (power when designation as protected street commences or ceases to give directions with respect to works in progress) shall not apply in relation to the authorised project. (7) Section 63(1) of that Act (under which Schedule 4 to that Act has effect for requiring the settlement of a plan and section of street works to be executed in a street designated by the street authority as having special engineering difficulties) shall not apply in relation to the authorised project. (8) The powers conferred by section 73A(1) and 78A(1) of that Act (requirements for undertaker to re-surface street) may not be exercised in relation to the authorised project. (9) Sections 74 and 74A of that Act (charge for occupation of the highway and charge determined by reference to duration of works) shall not apply in relation to the authorised project. (10) Schedule 3A to that Act (restriction on works following substantial street works) shall not apply where a notice under section 54 (advance notice of certain works) or 55 (notice of starting date of works) of that Act is in respect of the authorised project. (11) No notice under paragraph 2(1)(d) of that Schedule (power by notice to require notification of works which an undertaker proposes to carry out in a part of a highway to which a proposed restriction applies) shall have effect to require the notification of works proposed to be carried out in the course of the authorised project. (12) No directions under paragraph 3 of that Schedule (directions as to the date on which undertakers may begin to execute proposed works) may be issued to the undertaker. (13) Paragraph 3(4) of that Schedule (under which it is an offence for an undertaker to execute street works before the completion of certain other street works) shall not apply in relation to the execution of works in the course of the authorised project. (14) Paragraph 5(1) of that Schedule (effect of direction under paragraph 4 restricting further works) shall not apply in relation to the execution of works in the course of the authorised project. Water Industry Act 1991 5 Section 106(8) of the Water Industry Act 1991 (which qualifies the general right to communicate with the public sewers of a sewerage undertaker) shall not apply in relation to the authorised project. Party Wall etc. Act 1996 6 (1) No notice under section 1(2) or (5) of the Party Wall etc. Act 1996 (notice before building on line of junction with adjoining land) shall be required before the building of any wall in the course of the authorised project before completion of construction. (2) Sections 1(6) and 2 of the Party Wall etc. Act 1996 (rights of adjoining owners) shall not have effect to confer rights in relation to— (a) anything used, or intended to be used, by the undertaker for the purposes of the authorised project before completion of construction, or (b) land on which there is any such thing. (3) Section 6 of the Party Wall etc. Act 1996 (underpinning of adjoining buildings) shall not apply in relation to a proposal to excavate, or excavate for and erect anything, in the course of the authorised project before completion of construction. Planning Act 2008 - Application of the 2010 Regulations (Community Infrastructure Levy) 7 Notwithstanding the provisions of section 208 of the 2008 Act, for the purposes of regulation 6 of the Community Infrastructure Levy Regulations 2010 any building comprised in the authorised development shall be deemed to be (a) a building into which people do not normally go; or (b) a building into which people go only intermittently for the purpose of inspecting or maintaining fixed plant or machinery. Local Government (Miscellaneous Provisions) Act 1976 8 Section 42 of The Local Government (Miscellaneous Provisions) Act 1976 (certain future local Acts, etc., to be subject to the planning enactments, etc., except as otherwise provided) shall not apply to the extent that it would make provisions of this Order authorising the authorised project subject to other provisions. Town and Country Planning Act 1990 9 (1) No order, notice or regulation under the Town and Country Planning Act 1990 in relation to the preservation of trees, shall have effect in relation to the authorised project. (2) Sections 238 and 239 of that Act (consecrated land and burial grounds) shall apply— (a) in relation to land, other than a right over land, acquired for the purposes of the authorised project (whether or not by agreement), so as to permit use by the undertaker in accordance with the provisions of this Order; and (b) in relation to a right over land so acquired (whether or not by agreement), or the temporary use of land pursuant to articles 35 (temporary use of land for carrying out the authorised project) and 36 (temporary use of land for maintaining authorised project), so as to permit the exercise of that right or the temporary use by the undertaker in accordance with the provisions of this Order, without prejudice to the status of the land over which the right is exercised as consecrated land. (3) For the purposes only of Section 106 (1) of that Act the undertaker shall be deemed to be a person interested in the Order Land or any part of it and for the avoidance of doubt Section 106(3)(a) shall include any transferee under Article 9 of this Order. Coast Protection Act 1949 10 (1) The following provisions of the Coast Protection Act 1949 shall not apply to the authorised project. (2) Those provisions are— (a) section 16(1) (consent of coast protection authority required for carrying out coast protection work), and (b) section 18(1) (prohibition of excavation or removal of materials from seashore). Flood and Water Management Act 2010 11 Section 30 and Schedule 1 of the Flood and Water Management Act 2010 shall not apply in relation to the authorised project. National Parks and Access to Countryside Act 1949 12 Sections 51, 52 and 55 (general provisions as to long-distance routes, approval of proposals relating to long-distance routes, variation of approved proposals) of the National Parks and Access to Countryside Act 1949 shall not apply in relation to the authorised project. Control of Pollution Act 1974 13 (1) Where a local authority is acting further to Section 60(4) of the Control of Pollution Act 1974 in relation to the construction of the authorised project and works before completion of construction then that local authority shall also have regard to the noise levels referred to in the environmental statement for each construction site and the principles of the Code of Construction Practice. (2) Sections 60(7) and 61(7) of the Control of Pollution Act 1974 shall not apply in relation to the authorised project. (3) Underground tunnelling works shall be regulated by Sections 60 and 61 of the Control of Pollution Act 1974. PART 2 LOCAL LEGISLATION Year | Chapter | Short Title 1803 | cxxxi | Deptford Creek Bridge Act 1803 1809 | cxlii | Vauxhall Bridge Act 1809 1818 | xxviii | Waterloo Bridge and Approaches and Surrey New Roads Act 1818 1820 | xlix | Southwark Bridge Act 1820 1825 | cxviii | South London Docks Act 1825 1827 | xxx | London Bridge Act 1827 1828 | cxvi | London Docks Act 1828 1836 | cxxxiii | Hungerford Market Foot Bridge Act 1836 1848 | clxiii | City of London Sewers Act 1848 1850 | cxii | Westminster Bridge Act 1850 1853 | cvi | London Docks Act 1853 1858 | cxviii | Victoria Station and Pimlico Railway Act 1858 1859 | lxxxi | Charing Cross Railway Act 1859 1860 | cxlvii | Hungerford Market and Charing Cross Bridge Act 1860 1861 | cxvii | Lambeth Bridge Act 1861 1863 | lxii | Blackfriars Bridge Act 1863 1863 | ccxi | Putney and Fulham Bridge Act 1863 1863 | xlvi | Queens Road Battersea Extension Act 1863 1864 | ccxxxv | Albert Bridge Act 1864 1864 | ccxxxviii | Wandsworth Bridge Act 1864 1865 | cxcii | Fulham Railway Act 1865 1865 | ccclxv | Regents Canal (Limehouse Basin) Act 1865 1867 | iii | Blackfriars and Southwark Bridges Act 1867 1867 | cci | Wandsworth Bridge Act 1867 1867 | ccii | Fulham Railway Act 1867 1868 | cxxxv | Thames Embankment (Chelsea) Act 1868 1873 | xcvii | Albert Bridge Act 1873 1873 | c | Charing Cross and Victoria Embankment Approach Act 1873 1879 | cxcviii | Metropolis Management (Thames River Prevention of Floods) Amendment Act 1879 1881 | cxcii | Metropolitan Bridges Act 1881 1882 | lvi | Metropolis Board of Works (Various Powers) Act 1882 1885 | cxcv | Corporation of London (Tower Bridge) Act 1885 1900 | ccxix | Thames Tunnel ( Rotherhithe and Ratcliff) Act 1900 1907 | clxxv | London County Council (General Powers) Act 1907 1911 | lxxxiv | City of London (Various Powers) Act 1911 1911 | cxx | Corporation of London (Bridges) Act 1911 1912 | xlvii | Wandsworth Wimbledon and Epsom District Gas Act 1912 1920 | clxxiii | Port of London (Consolidation) Act 1920 1924 | lxvii | London County Council (Lambeth Bridge) Act 1924 1926 | vii | City of London (Various Powers) Act 1926 1937 | xlv | City of London (Various Powers) Act 1937 1954 | xxvii | City of London (Various Powers) Act 1954 1957 | xxxv | London County Council (General Powers) Act 1957 1961 | xxviii | City of London (Various Powers) Act 1961 1961 | xliii | London County Council (General Powers) Act 1961 1962 | xlv | London County Council (General Powers) Act 1962 1963 | xxxiv | City of London (Various Powers) Act 1963 1965 | xxxix | City of London (Various Powers) Act 1965 1967 | i | London Bridge Act 1967 1967 | xlii | City of London (Various Powers) Act 1967 1968 | xxxii | Port of London Act 1968 (sections 66 to 75 inclusive) (save for maintenance dredging) 1970 | lxxvi | Greater London Council (General Powers) Act 1970 1972 | xlv | Thames Barrier Flood Prevention Act 1972 1977 | xv | City of London (Various Powers) Act 1977 1981 | Thames Region Land Drainage bylaws 1981 1987 | xv | City of London (Various Powers) Act 1987 2013 | vii | City of London (Various Powers) Act 2013