  1. Title and introductory text
  2. 1 Citation and commencement
  3. 2 Interpretation
  4. 3 Development consent etc. granted by this Order
  5. 4 Operation of generating station
  6. 5 Power to maintain the authorised development
  7. 6 Application and modification of statutory provisions
  8. 7 Defence to proceedings in respect of statutory nuisance
  9. 8 Street works
  10. 9 Power to alter layout, etc., of streets
  11. 10 Construction and maintenance of altered streets
  12. 11 Temporary closure of streets and public rights of way
  13. 12 Use of private roads
  14. 13 Access to works
  15. 14 Agreements with street authorities
  16. 15 Traffic regulation measures
  17. 16 Discharge of water
  18. 17 Not used
  19. 18 Protective works to buildings
  20. 19 Authority to survey and investigate the land
  21. 20 Compulsory acquisition of land
  22. 21 Time limit for exercise of authority to acquire land compulsorily
  23. 22 Compulsory acquisition of rights
  24. 23 Private rights
  25. 24 Application of the 1981 Act
  26. 25 Acquisition of subsoil only
  27. 26 Power to override easements and other rights
  28. 27 Modification of Part 1 of the Compulsory Purchase Act 1965
  29. 28 Rights under or over streets
  30. 29 Temporary use of land for constructing the authorised development
  31. 30 Temporary use of land for maintaining the authorised development
  32. 31 Statutory undertakers
  33. 32 Apparatus and rights of statutory undertakers in stopped up and closed streets
  34. 33 Recovery of costs of new connections
  35. 34 Benefit of the Order
  36. 35 Consent to transfer the benefit of the Order
  37. 36 Application of landlord and tenant law
  38. 37 Operational land for the purposes of the 1990 Act
  39. 38 Felling or lopping of trees and removal of hedgerows
  40. 39 Trees subject to tree preservation orders
  41. 40 Certification of plans and documents, etc.
  42. 41 No double recovery
  43. 42 Arbitration
  44. 43 Protective provisions
  45. 44 Not used
  46. 45 Service of notices
  47. 46 Procedure in relation to certain approvals etc.
  48. 47 Guarantees in respect of payment of compensation
  49. 48 Compulsory acquisition of land – incorporation of the mineral code
  50. 49 Crown rights
  51. SCHEDULE 1 AUTHORISED DEVELOPMENT
  52. SCHEDULE 2 REQUIREMENTS
  53. SCHEDULE 3 LEGISLATION TO BE DISAPPLIED
  54. SCHEDULE 4 STREETS SUBJECT TO STREET WORKS
  55. SCHEDULE 5 ALTERATION OF STREETS
  56. SCHEDULE 6 STREETS AND PUBLIC RIGHTS OF WAY
  57. SCHEDULE 7 PERMANENT MEANS OF ACCESS TO WORKS
  58. SCHEDULE 8 TRAFFIC REGULATION MEASURES
  59. SCHEDULE 9 LAND IN WHICH ONLY NEW RIGHTS ETC. MAY BE ACQUIRED
  60. SCHEDULE 10 MODIFICATION OF COMPENSATION AND COMPULSORY PURCHASE ENACTMENTS FOR THE CREATION OF NEW RIGHTS AND IMPOSITION OF NEW RESTRICTIVE COVENANTS
  61. SCHEDULE 11 LAND OF WHICH TEMPORARY POSSESSION MAY BE TAKEN
  62. SCHEDULE 12 DOCUMENTS AND PLANS TO BE CERTIFIED
  63. SCHEDULE 13 ARBITRATION RULES
  64. SCHEDULE 14 PROTECTIVE PROVISIONS
  65. SCHEDULE 15 NOT USED
  66. SCHEDULE 16 PROCEDURE FOR DISCHARGE OF REQUIREMENTS

Proposed changes to this act

No one has proposed a change to this act yet.

66 provisions

40 Certification of plans and documents, etc.

(1) The undertaker must, as soon as practicable after the making of this Order, submit to the Secretary of State copies of all documents and plans listed in the table at Schedule 12 (documents and plans to be certified) for certification that they are true copies of the documents referred to in this Order. (2) A plan or document so certified is admissible in any proceedings as evidence of the contents of the document of which it is a copy.

Propose a change

41 No double recovery

Compensation is not payable in respect of the same matter both under this Order and under any enactment, any contract or any rule of law.

Propose a change

42 Arbitration

(1) Any difference under any provision of this Order, unless otherwise provided for, is to be referred to and settled in arbitration in accordance with the rules set out in Schedule 13 (arbitration rules) of this Order, by a single arbitrator to be agreed upon by the parties, within 14 days of receipt of the notice of arbitration, or if the parties fail to agree within the time period stipulated, to be appointed on application of either party (after giving written notice to the other) by the Secretary of State. (2) Any matter for which the consent or approval of the Secretary of State is required under any provision of this Order is not subject to arbitration.

Propose a change

43 Protective provisions

Schedule 14 (protective provisions) has effect.

Propose a change

45 Service of notices

(1) A notice or other document required or authorised to be served for the purposes of this Order may be served— (a) by post; (b) by delivering it to the person on whom it is to be served or to whom it is to be given or supplied; or (c) with the consent of the recipient and subject to paragraphs (6) to (8), by electronic transmission. (2) Where the person on whom a notice or other document to be served for the purposes of this Order is a body corporate, the notice or document is duly served if it is served on the secretary or clerk of that body. (3) For the purposes of section 7 (references to service by post) of the Interpretation Act 1978 as it applies for the purposes of this article, the proper address of any person in relation to the service on that person of a notice or document under paragraph (1) is, if that person has given an address for service, that address and otherwise— (a) in the case of the secretary or clerk of a body corporate, the registered or principal office of that body; and (b) in any other case, the last known address of that person at that time of service. (4) Where for the purpose of this Order a notice or other document is required or authorised to be served on a person as having an interest in, or as the occupier of, land and the name or address of that person cannot be ascertained after reasonable enquiry, the notice may be served by— (a) addressing it to that person by the description of “owner”, or as the case may be “occupier” of the land (describing it); and (b) either leaving it in the hands of the person who is or appears to be resident or employed on the land or leaving it conspicuously affixed to some building or object on or near the land. (5) Where a notice or other document required to be served or sent for the purposes of this Order is served or sent by electronic transmission the requirement is to be taken to be fulfilled only where— (a) the recipient of the notice or other document to be transmitted has given consent to the use of electronic transmission in writing or by electronic transmission; (b) the notice or document is capable of being accessed by the recipient; (c) the notice or document is legible in all material respects; and (d) the notice or document is in a form sufficiently permanent to be used for subsequent reference. (6) Where the recipient of a notice or other document served or sent by electronic transmission notifies the sender within seven days of receipt that the recipient requires a paper copy of all or any part of that notice or other document the sender must provide such a copy as soon as reasonably practicable. (7) Any consent to the use of an electronic transmission by a person may be revoked by that person in accordance with paragraph (8). (8) Where a person is no longer willing to accept the use of electronic transmission for any of the purposes of this Order— (a) that person must give notice in writing or by electronic transmission revoking any consent given by that person for that purpose; and (b) such revocation is final and takes effect on a date specified by the person in the notice but that date must not be less than seven days after the date on which the notice is given. (9) This article does not exclude the employment of any method of service not expressly provided for by it.

Propose a change

46 Procedure in relation to certain approvals etc.

(1) Where an application is made to or request is made of, a consenting authority for any consent, agreement or approval required or contemplated by any of the provisions of the Order (not including the requirements), such consent, agreement or approval to be validly given, must be given in writing. (2) Where paragraph (1) applies to any consent, agreement or approval, such consent, agreement or approval must not be unreasonably withheld or delayed. (3) Schedule 16 (procedure for discharge of requirements) has effect in relation to all consents, agreements or approvals required, granted, refused or withheld in relation to the requirements. (4) Save for applications made pursuant to Schedule 16 and where stated to the contrary if, within eight weeks (or such longer period as may be agreed between the undertaker and the relevant consenting authority in writing) after the application or request has been submitted to a consenting authority it has not notified the undertaker of its disapproval and the grounds of disapproval, it is deemed to have approved the application or request. (5) Where any application is made as described in paragraph (1), the undertaker must include a statement in such application that refers to the timeframe for consideration of the application and the consequences of failure to meet that timeframe as prescribed by paragraph (4). (6) Schedule 16 does not apply in respect of any consents, agreements or approvals contemplated by the provisions of Schedule 14 (protective provisions) or any dispute under article 18(6) (protective work to buildings) to which paragraph (4) applies. (7) In this article “consenting authority” means the relevant planning authority, highway authority, traffic authority, street authority, the owner of a watercourse, sewer or drain or the beneficiary of any of the protective provisions contained in Schedule 14.

Propose a change

47 Guarantees in respect of payment of compensation

(1) The undertaker must not exercise the powers conferred by the provisions referred to in paragraph (2) in relation to any part of the Order land unless it has first put in place either— (a) a guarantee, the form and amount of which has been approved by the Secretary of State in respect of the liabilities of the undertaker to pay compensation pursuant to the provisions referred to in paragraph (2) in respect of the exercise of the relevant provision in relation to that part of the Order land; or (b) an alternative form of security, the form and amount of which has been approved by the Secretary of State in respect of the liabilities of the undertaker to pay compensation pursuant to the provisions referred to in paragraph (2) in respect of the exercise of the relevant provision in relation to that part of the Order land. (2) The provisions are— (a) article 20 (compulsory acquisition of land); (b) article 22 (compulsory acquisition of rights); (c) article 23 (private rights); (d) article 28 (rights under or over streets); (e) article 29 (temporary use of land for constructing the authorised development); (f) article 30 (temporary use of land for maintaining the authorised development); and (g) article 31 (statutory undertakers). (3) A guarantee or alternative form of security given in respect of any liability of the undertaker to pay compensation under this Order is to be treated as enforceable against the guarantor or person providing the alternative form of security by any person to whom such compensation is payable and must be in such a form as to be capable of enforcement by such a person. (4) Nothing in this article requires a guarantee or alternative form of security to be in place for more than 15 years after the date on which the relevant power is exercised.

Propose a change

48 Compulsory acquisition of land – incorporation of the mineral code

Parts 2 and 3 of Schedule 2 (minerals) to the Acquisition of Land Act 1981 are incorporated into this Order subject to the modifications that— (a) for “the acquiring authority” substitute “the undertaker”; (b) for the “undertaking” substitute “authorised development”; and (c) paragraph 8(3) is not incorporated.

Propose a change

49 Crown rights

(1) Nothing in this Order affects prejudicially any estate, right, power, privilege, authority or exemption of the Crown and in particular, nothing in this Order authorises the undertaker or any licensee to take, use, enter upon or in any manner interfere with any land or rights of any description— (a) belonging to His Majesty in right of the Crown and forming part of The Crown Estate without the consent in writing of the Crown Estate Commissioners; (b) belonging to His Majesty in right of the Crown and not forming part of The Crown Estate without the consent in writing of the government department having the management of that land; or (c) belonging to a government department or held in trust for His Majesty for the purposes of a government department without the consent in writing of that government department. (2) Paragraph (1) does not apply to the exercise of any right under this Order for the compulsory acquisition of an interest in land (as defined in the 2008 Act) which is for the time being held otherwise than by or on behalf of the Crown. (3) A consent under paragraph (1) may be given unconditionally or subject to terms and conditions and is deemed to have been given in writing where it is sent electronically.

Propose a change

SCHEDULE 1 AUTHORISED DEVELOPMENT

Article 3 Interpretation 1 In this Schedule— “electrical cables” means— cables of differing types and voltages installed for the purposes of conducting electricity, auxiliary cables, cables connecting to direct current (DC) boxes, earthing cables and optical fibre cables; and works associated with cable laying including jointing bays, hardstanding adjoining the jointing pits, combiner boxes, fibre bays, cable ducts, cable protection, joint protection, manholes, kiosks, marker posts, underground cable marker, tiles and tape, send and receive pits for horizontal directional drilling, trenching, lighting, and a pit or container to capture fluids associated with drilling; “field stations” means inverters, transformers and switchgear comprising either— a “Field Station Unit” where transformers, inverters and switchgear will be housed in a single container located on a concrete beam or block foundation; or screw piles, rammed piles or compacted hardcore foundation. There will be a perimeter of stone or gravel around the container; or a “Field Substation” where transformers and switchgear will be housed in a single container and inverters provided in either a separate single container or inverters provided separately and mounted on a ground mounted frame which is parallel to the mounting structure. Each container will be located on a concrete beam or block foundation; or screw piles, rammed piles or compacted hardcore foundation. There will be a perimeter of stone or gravel around each container; or an “Inverter Arrangement” where transformers, switchgear and inverters will be provided separately, which may be in one or more containers. Inverters may also be provided separately and mounted on a ground mounted frame which is parallel to the mounting structure. Any container will be located on a concrete beam or block foundation; or screw piles, rammed piles or compacted hardcore foundation. There will be a perimeter of stone or gravel around any container; and inverters provided separately and mounted on a ground mounted frame which is parallel to the mounting structure; “inverter” means electrical equipment required to convert direct current to alternating current; “mounting structure” means a frame or rack made of galvanised steel or other material designed to support the solar panels and mounted on piles driven into the ground, piles rammed into bare ground, a pillar attaching to a steel ground screw, pillars fixed to a concrete foundation, or pillars set in concrete in a pre-made hole in the ground; “National Grid Drax Substation” means the existing 400kV substation at Drax Power Station, owned and operated by National Grid; “permissive paths” means new access tracks providing restricted public access within the Order limits along the route shown on the framework landscape and ecological management plan; “solar panel” means a solar photovoltaic panel or module designed to convert solar irradiance to electrical energy; “substation” means a compound containing electrical equipment required to switch, transform, convert electricity; “switchgear” means a combination of electrical disconnect switches, fuses or circuit breakers used to control, protect and isolate electrical equipment; and “transformer” means a structure containing an electrical device to transform electricity to a different voltage. 2 In the Unitary authority areas of East Riding of Yorkshire and North Yorkshire a nationally significant infrastructure project as defined in sections 14 and 15 of the 2008 Act and associated development under section 115(1)(b) of the 2008 Act. The nationally significant infrastructure project comprises one generating station with a gross electrical output capacity of over 50 megawatts comprising all or any of the work numbers in this Schedule or any part of any work number in this Schedule— Work No. 1— a ground mounted solar photovoltaic generating station with a gross electrical output capacity of over 50 megawatts including— (a) solar panels fitted to mounting structures; and (b) field stations; and associated development within the meaning of section 115(2) of the 2008 Act including— Work No. 2— development of onsite substations and associated works including— (a) substations, switch room buildings and ancillary equipment including reactive power units and harmonic filters; and (b) monitoring and control systems housed within a control building or located separately in their own containers or control rooms, with welfare facilities. Work No. 3— works to lay electrical cables and compounds for the electrical cables including— (a) works to lay 132kV electrical cables connecting Work No. 2 to the National Grid Drax Substation, including link boxes and tunnelling, boring and drilling works for trenchless crossings; (b) electrical engineering works within or around the National Grid Drax Substation including the laying and terminating of the electrical cables and ancillary equipment; and (c) construction and decommissioning compounds, including site and welfare offices and areas to store materials and equipment. Work No. 4— works including— (a) electrical cables, including but not limited to electrical cables connecting Works No. 1, 2 and 3 to one another and connecting solar panels to one another and the field stations including tunnelling, boring and drilling works for trenchless crossings; (b) landscaping and biodiversity mitigation and enhancement measures including planting; (c) earthworks; (d) laying down of temporary footpath diversions, permissive paths, signage and information boards; (e) hardstanding and parking areas; (f) sustainable drainage systems including ponds, runoff outfalls, general drainage and irrigation infrastructure, systems and improvements or extensions to existing drainage and irrigation systems; (g) fencing, gates, boundary treatment and other means of enclosure; (h) works for the provision of security and monitoring measures such as CCTV columns, cameras, lighting columns and lighting, weather stations, perimeter fencing and communication infrastructure; (i) improvement, maintenance and use of existing private tracks; (j) laying down of internal access tracks, ramps, means of access, footpaths, crossing of watercourses and roads, including the laying and construction of drainage infrastructure, signage and information boards; (k) construction and decommissioning compounds, including site and welfare offices and areas to store materials and equipment; and (l) works to divert and underground existing electrical overhead lines. Work No. 5— construction and decommissioning compounds including— (a) areas of hardstanding; (b) parking areas; (c) site and welfare offices, canteens and workshops; (d) security infrastructure, including cameras, perimeter fencing and lighting; (e) areas to store materials and equipment and waste skips; (f) site drainage and waste management infrastructure (including sewerage); and (g) electricity, water, waste water and telecommunications connections. Work No. 6— works to develop operations and maintenance buildings including— (a) demolition and alteration of existing structures; (b) offices, security and welfare facilities; (c) storage facilities; and (d) parking areas. Work No. 7— works to facilitate access to Work Nos. 1 to 6, and 8 including— (a) creation of accesses from the public highway; (b) creation of visibility splays; (c) works to widen and surface the public highway and private means of access; and (d) works adjacent to highways and accesses including those to structures, boundary features, drainage features on private land required for the facilitation of movement of abnormal indivisible loads associated with the authorised development. Work No. 8— areas of habitat management including— (a) landscape and biodiversity enhancement measures; (b) habitat creation and management including earthworks and landscaping, signage and information boards; (c) construction of drainage infrastructure and means of access; (d) laying down of internal access tracks, means of access and crossing of watercourses, permissive paths; and (e) fencing gates boundary treatment and other means of enclosure. In connection with and in addition to Work Nos. 1 to 8 further associated development within the Order limits, including— (a) works for the provision of fencing and security measures such as CCTV, columns, lighting and communication boxes; (b) laying down of internal access tracks, ramps and span bridges, means of access, non-motorised links, footpaths and footways, laying and surfacing of permissive paths; (c) laying down of temporary footpath diversions, permissive paths and construction of drainage infrastructure, signage and information boards; (d) bunds, embankments, trenching and swales; (e) boundary treatments, including means of enclosure; (f) habitat creation and management including earthworks, landscaping, means of enclosure and the laying and construction of drainage infrastructure; (g) landscaping and other works to mitigate any adverse effects of construction, maintenance or operation of the authorised development; (h) electrical, gas, water, foul water drainage and telecommunications infrastructure connections, diversions ..., and works to alter the position of, such services and utilities connections; (i) works to alter the course of, or otherwise interfere with, non-navigable rivers, streams or watercourses; (j) works to the existing irrigation system and works to alter the position and extent of such irrigation system; (k) surface water drainage systems, storm water attenuation systems including storage basins, oil water separators, including channelling and culverting and works to existing drainage systems; (l) site establishments and preparation works including site clearance (including vegetation removal, demolition of existing buildings and structures); earthworks (including soil stripping and storage and site levelling) and excavations; the alteration of the position of services and utilities; and works for the protection of buildings and land; (m) tunnelling, boring and drilling works; (n) working sites in connection with the construction and decommissioning of the authorised development and its restoration; and (o) other works to mitigate any adverse effects of the construction, maintenance, operation or decommissioning of the authorised development, and further associated development comprising such other works or operations as may be necessary or expedient for the purposes of or in connection with the construction, operation and maintenance or decommissioning of the authorised development but only within the Order limits and insofar as they are unlikely to give rise to any materially new or materially different environmental effects from those assessed in the environmental statement.

Propose a change

SCHEDULE 2 REQUIREMENTS

Article 2 Interpretation 1 In this Schedule— “both relevant planning authorities” means East Riding of Yorkshire Council and North Yorkshire Council each being the relevant planning authority for part of the authorised development. Commencement of the authorised development 2 The authorised development must not be commenced after the expiration of five years from the date this Order comes into force. Approved details and amendments to them 3 (1) With respect to the documents certified under article 40 (certification of plans and documents, etc.) and any plans, details or schemes which have been approved pursuant to any requirement (together the “Approved Documents, Plans, Details or Schemes”), the undertaker may submit to the relevant planning authority or both relevant planning authorities (as applicable) for approval of any amendments to any of the Approved Documents, Plans, Details or Schemes and, following approval by the relevant planning authority or both relevant planning authorities (as applicable), the relevant Approved Documents, Plans, Details or Schemes is to be taken to include the amendments as so approved pursuant to this paragraph. (2) Approval under sub-paragraph (1) for the amendments to any of the Approved Documents, Plans, Details or Schemes must not be given except where it has been demonstrated to the satisfaction of the relevant planning authority or both relevant planning authorities (as applicable) that the subject matter of the approval sought is unlikely to give rise to any materially new or materially different environmental effects from those assessed in the environmental statement. (3) Where under any of the requirements the approval, agreement or confirmation of the relevant planning authority or both relevant planning authorities is required, that approval, agreement or confirmation must be provided in writing. (4) Within 14 days of the date of final commissioning the undertaker must serve written notice of the date of final commissioning on both relevant planning authorities. Community liaison group 4 (1) Prior to the commencement of the authorised development the undertaker must submit to the relevant planning authorities for approval the terms of reference for a community liaison group whose aim is to facilitate liaison between representatives of people living in the vicinity of the Order limits and other relevant organisations in relation to the construction of the authorised development. (2) The community liaison group must be established prior to commencement of the authorised development and must be administered by the undertaker, and operated, in accordance with the approved terms of reference. (3) The community liaison group is to continue to meet until the date of final commissioning of the final part of the authorised development unless otherwise agreed with the relevant planning authorities. Detailed design approval 5 (1) No part of the authorised development may commence until details of— (a) layout; (b) scale; (c) proposed finished ground levels; (d) external appearance; (e) hard surfacing materials; (f) vehicular and pedestrian access, parking and circulation areas; and (g) refuse or other storage units, signs and lighting. relating to that part have been submitted and approved in writing by the relevant planning authority for that part or, where the part falls within the administrative areas of both East Riding of Yorkshire Council and North Yorkshire Council, both relevant planning authorities. (2) The details submitted must accord with the outline design principles statement. (3) The authorised development must be carried out in accordance with the approved details. Landscape and Ecological management plan 6 (1) No part of the authorised development may commence until a written landscape and ecological management plan has been submitted to and approved by the relevant planning authority for that part or, where the part falls within the administrative areas of both East Riding of Yorkshire Council and North Yorkshire Council, both relevant planning authorities. Such approval to be in consultation with Natural England. (2) The landscape and ecological management plan must be substantially in accordance with the framework landscape and ecological management plan and must be implemented as approved. (3) For the purposes of sub-paragraph (1), “commence” includes part (h) (site clearance (including vegetation removal, demolition of existing buildings and structures)) and part (i) (advanced planting to allow for an early establishment of protective screening) of permitted preliminary works. Biodiversity net gain 7 (1) No part of the authorised development may commence until a biodiversity net gain strategy has been submitted to and approved by the relevant planning authority for that part, in consultation with the relevant statutory nature conservation body. (2) The biodiversity net gain strategy must include details of how the strategy will secure a minimum of 80.42% biodiversity net gain in area-based habitat units, a minimum of 10.30% biodiversity net gain in hedgerow units, and 10.09% biodiversity net gain in watercourse units for all of the authorised development during the operation of the authorised development, using the Department of Environment, Food and Rural Affairs’ 4.0 metric to calculate those percentages (or such other biodiversity metric approved by the relevant planning authority in consultation with the relevant statutory nature conservation body). (3) The biodiversity net gain strategy must be maintained throughout the operation of the relevant part of the authorised development to which the plan relates. Fencing and other means of enclosure 8 (1) No part of the authorised development may commence until written details of all proposed temporary fences, walls or other means of enclosure, including those set out in the construction environmental management plan, for that part have been submitted to and approved by the relevant planning authority or, where the part falls within the administrative areas of East Riding of Yorkshire Council and North Yorkshire Council, both relevant planning authorities. (2) No part of the authorised development may commence until written details of all permanent fences, walls or other means of enclosure for that part have been submitted to and approved by the relevant planning authority or, where the part falls within the administrative areas of East Riding of Yorkshire Council and North Yorkshire Council, both relevant planning authorities. (3) For the purposes of requirement 8(1), “commence” includes any permitted preliminary works. (4) Any construction site must remain securely fenced in accordance with the approved details under requirement 11(1) at all times during construction of the authorised development. (5) Any temporary fencing must be removed on completion of the part of construction of the authorised development for which it was used. (6) Any approved permanent fencing for a part of the authorised development must be completed before the date of final commissioning in respect of that part. Flood risk and surface and foul water drainage 9 (1) No part of the authorised development may commence until the undertaker has considered the most up to date Flood and Coastal Erosion Risk Data published quarterly by the Environment Agency and if necessary, has updated the flood risk assessment, in consultation with the Environment Agency and the lead local flood authority. (2) The undertaker is required to carry out the authorised development in accordance with the latest flood risk assessment. (3) No part of the authorised development may commence until details of the surface water drainage strategy and (if any) foul water drainage system (including means of pollution control) for that part have been submitted to and approved by the relevant planning authority or, where the part falls within the administrative areas of both East Riding of Yorkshire Council and North Yorkshire Council, by both relevant planning authorities, and following consultation with the Environment Agency and the lead local flood authority where the surface water drainage strategy and/or foul water drainage system is affected by an updated version of the flood risk assessment. (4) The drainage strategy must be substantially in accordance with the framework surface water drainage strategy. (5) Any strategy approved pursuant to sub-paragraph (3) must be implemented as approved and maintained throughout the construction and operation of the authorised development. Archaeology 10 (1) No part of the authorised development may commence, and no part of the permitted preliminary works for that part comprising the intrusive archaeological surveys may start, until an overarching written scheme of investigation for that part has been submitted to and approved in writing by the relevant planning authority for that part or, where the part falls within the administrative areas of East Riding of Yorkshire Council and North Yorkshire Council, both relevant planning authorities. (2) The written scheme of investigation must be substantially in accordance with the overarching written scheme of investigation and must be implemented as approved. Construction environmental management plan 11 (1) No part of the authorised development may commence until a construction environmental management plan for that part has been submitted to and approved by the relevant planning authority for that part or, where the part falls within the administrative areas of both East Riding of Yorkshire Council and North Yorkshire Council, both relevant planning authorities. Such approval to be in consultation with Natural England, as well as the Environment Agency and the lead local flood authority where the construction environmental management plan is affected by an updated version of the flood risk assessment. (2) The construction environmental management plan must be substantially in accordance with the framework construction environmental management plan and must be implemented as approved. (3) The plan submitted and approved pursuant to sub-paragraph (1) must include a site waste management plan that must be substantially in accordance with the framework site waste management plan and must be implemented as approved. Operational environmental management plan 12 (1) Prior to the date of final commissioning for any part, an operational environmental management plan for that part must be submitted to and approved by the relevant planning authority for that part or, where the part falls within the administrative areas of both East Riding of Yorkshire Council and North Yorkshire Council, both relevant planning authorities. Such approval to be in consultation with Natural England, as well as the Environment Agency and the lead local flood authority where the operational environmental management plan is affected by an updated version of the flood risk assessment. (2) The operational environmental management plan must be substantially in accordance with the framework operational environmental management plan and must be implemented as approved. Construction traffic management plan 13 (1) No part of the authorised development may commence until a construction traffic management plan for that part has been submitted to and approved by the relevant authority for that part or, where the part falls within the administrative areas of both East Riding of Yorkshire Council and North Yorkshire Council, both relevant authorities. Such approval to be in consultation with Network Rail Infrastructure Limited, the relevant highway authority and National Highways Limited. (2) The construction traffic management plan must be substantially in accordance with the framework construction traffic management plan and must be implemented as approved. Operational noise 14 (1) No part of Work No. 1 or Work No. 2 may commence until an operational noise assessment containing details of how the design of the authorised development has incorporated mitigation to ensure the operational noise rating levels as set out in the environmental statement are to be complied with for that part has been submitted to and approved by the relevant planning authority for that part. (2) The mitigation measures described in the operational noise assessment for each part of the authorised development must be implemented as approved. Soil management plan 15 (1) No part of the authorised development may commence until a soil management plan for that part has been submitted to and approved by the relevant planning authority for that part or, where the part falls within the administrative areas of both East Riding of Yorkshire Council and North Yorkshire Council, both relevant planning authorities. (2) The soils management plan must be substantially in accordance with the framework soil management plan and must be implemented as approved. Skills, supply chain and employment 16 (1) No part of the authorised development may commence until a skills, supply chain and employment plan in relation to that part has been submitted to and approved by the relevant planning authority for that part or, where the part falls within the administrative areas of both East Riding of Yorkshire Council and North Yorkshire Council, both relevant planning authorities. (2) The skills, supply chain and employment plan must by substantially in accordance with the framework skills, supply chain and employment plan and must be implemented as approved. (3) The skills, supply chain and employment plan must identify opportunities for individuals and businesses to access employment, skills and supply chain opportunities associated with that part of the authorised development, and the means for publicising such opportunities. Public rights of way 17 (1) No part of the authorised development may commence until a public rights of way management plan for any sections of public rights of way shown to be temporarily closed on the streets, access and rights of way plans for that part has been submitted to and approved by the relevant planning authority for that part or, where the part falls within the administrative areas of East Riding of Yorkshire Council and North Yorkshire Council, both relevant planning authorities. Such approval to be in consultation with the relevant highway authority. (2) The public rights of way management plan must be substantially in accordance with the framework public rights of way management plan and must be implemented as approved. (3) The public rights of way management plan must be implemented as approved unless otherwise agreed with the relevant planning authority in consultation with the relevant highway authority. Decommissioning and restoration 18 (1) No later than 12 months prior to the date that the undertaker intends to decommission any part of the authorised development, the undertaker must submit to the relevant planning authority for that part (or both relevant planning authorities where that part falls within the administrative areas of both East Riding of Yorkshire Council and North Yorkshire Council) for approval a decommissioning environmental management plan for that part. (2) Decommissioning must commence no later than 40 years following the date of final commissioning. (3) The plan submitted and approved pursuant to sub-paragraph (1) must be substantially in accordance with the framework decommissioning environmental management plan and must be implemented as approved. (4) The plan submitted and approved pursuant to sub-paragraph (1) must include a resource management plan that includes details of proposals to minimise the use of natural resources and unnecessary materials.

Propose a change

SCHEDULE 3 LEGISLATION TO BE DISAPPLIED

Article 6 1 The following provisions do not apply in so far as they relate to the construction of any numbered work or the carrying out of any operation required for the purpose of, or in connection with, the construction, operation, maintenance or decommissioning of the authorised development— (a) East Riding Drainage Act 1798; (b) Seaton Ross Inclosure Act 1811; (c) Keyingham (and others) Drainage [Yorkshire] Act 1845; (d) York and North Midland Railway (East Riding Branches) [No.1] Act 1846; (e) Wapentake of Ouse and Derwent Drainage Act 1854; (f) Ouse (Lower) Improvement Act 1884; (g) Aire and Calder Navigation Act 1914; (h) Aire and Calder Navigation Act 1924; (i) Boothferry Bridge Act 1925; (j) Yorkshire Water Authority (Alteration of Boundaries of the Lower Ouse Internal Drainage District) Order 1989; and (k) The Selby Area Internal Drainage District Order 2017.

Propose a change

SCHEDULE 4 STREETS SUBJECT TO STREET WORKS

Article 8 Interpretation 1 In this Schedule— “cable works” means works to place, retain and maintain underground electrical and communications apparatus. (1) Area | (2) Street | (3) Description of the street works East Riding of Yorkshire | Junction of the A163 Highfield Road and B1228 Street Lane | Street works to facilitate any removal, repair and reinstatement of street furniture associated with the abnormal load manoeuvre for the length shown in green on Sheet 1 of the streets, rights of way and access plans. East Riding of Yorkshire | Willitoft Road | Street works to facilitate the construction of the proposed access and passing place for the length shown in green on Sheet 2 of the streets, rights of way and access plans. East Riding of Yorkshire | Tottering Lane | Street works to facilitate the construction of the proposed access and cable works beneath the width of the highway for the lengths shown in green on Sheets 3 and 4 of the streets, rights of way and access plans. East Riding of Yorkshire | Willitoft Road south of junction of Tottering Lane with Willitoft Road | Street works to facilitate the cable works within the carriageway for the length shown in green on Sheet 4 of the streets, rights of way and access plans. East Riding of Yorkshire | Ings Lane | Street works to facilitate the construction of the proposed access, passing place and cable works beneath the width of the highway for the lengths shown in green on Sheets 6 and 7 of the streets, rights of way and access plans. East Riding of Yorkshire | Ings Lane | Street works to facilitate the construction of the proposed access and cable works beneath the width of the highway for the length shown in green on Sheet 7 of the streets, rights of way and access plans. East Riding of Yorkshire | B1228 Street Lane | Street works to facilitate the construction of the proposed access for the length shown in green on Sheet 8 of the streets, rights of way and access plans. East Riding of Yorkshire | B1228 Street Lane North of the Junction of Wood Lane and B1228 Street Lane | Street works to facilitate the cable works within the carriageway for the length shown in green on Sheet 9 of the streets, rights of way and access plans. East Riding of Yorkshire | Wood Lane to South West of Junction with B1228 Street Lane | Street works to facilitate the construction of the proposed access and cable works beneath the width of the highway for the length shown in green on Sheets 9 and 14 of the streets, rights of way and access plans. East Riding of Yorkshire | Wood Lane to North East of Junction with B1228 Street Lane | Street works to facilitate the construction of the proposed access, passing places and cable works beneath the width of the highway for the lengths shown in green on Sheet 9 of the streets, rights of way and access plans. East Riding of Yorkshire | Willitoft Road between Spaldington and Spaldington Common | Street works to facilitate the construction of the proposed access for the length shown in green on Sheet 10 of the streets, rights of way and access plans. East Riding of Yorkshire | Spaldington Road adjacent to Spaldington Common | Street works to facilitate the construction of the proposed access for the length shown in green on Sheet 10 of the streets, rights of way and access plans. East Riding of Yorkshire | Spaldington Road to West of Spaldington Common | Street works to facilitate the cable works within the carriageway for the length shown in green on Sheet 10 of the streets, rights of way and access plans. East Riding of Yorkshire | A614 | Street works to facilitate the construction of the proposed access for the length shown in green on Sheet 12 of the streets, rights of way and access plans. East Riding of Yorkshire | B1228 Street Lane | Street works to facilitate the construction of the proposed access and cable works beneath the width of the highway for the lengths shown in green on Sheet 13 of the streets, rights of way and access plans. East Riding of Yorkshire | Wood Lane adjacent to junction with Brind Lane | Street works to facilitate the construction of the proposed access for the length shown in green on Sheet 14 of the streets, rights of way and access plans. East Riding of Yorkshire | Wood Lane North of junction of Wood Lane with Brind Lane | Street works to facilitate the construction of the proposed passing places for the lengths shown in green on Sheet 14 of the streets, rights of way and access plans. East Riding of Yorkshire | Wood Lane | Street works to facilitate the construction of the proposed access and cable works within the carriageway for the length shown in green on Sheet 14 and the lengths shown in green on Sheets 14 and 15 of the streets, rights of way and access plans. East Riding of Yorkshire | Rowlandhall Lane North of Level Crossing to junction with Wood Lane | Street works to facilitate the construction of the proposed passing places for the lengths shown in green on Sheet 15 of the streets, rights of way and access plans. East Riding of Yorkshire | Rowlandhall Lane South of Level Crossing | Street works to facilitate the cable works within the carriageway for the length shown in green on Sheet 15 of the streets, rights of way and access plans. East Riding of Yorkshire | Rowlandhall Lane | Street works to facilitate the construction of the proposed access for the length shown in green on Sheet 16 of the streets, rights of way and access plans. East Riding of Yorkshire | Wood Lane South West of Level Crossing | Street works to facilitate the construction of the proposed access and passing places for the lengths shown in green on Sheet 18 of the streets, rights of way and access plans. East Riding of Yorkshire | Station Road | Street works to facilitate the cable works within the carriageway for the length shown in green on Sheet 18 of the streets, rights of way and access plans. North Yorkshire Council | A63 Hull Road | Street works to facilitate the construction of the proposed access for the length shown in green on Sheet 19 of the streets, rights of way and access plans. North Yorkshire Council | Unnamed Access | Access works to facilitate the construction of the proposed access for the length shown in green on Sheet 19 of the streets, rights of way and access plans. North Yorkshire Council | Pear Tree Avenue | Street works to facilitate the construction of the proposed access and cable works within the carriageway for the length shown in green on Sheet 21 of the streets, rights of way and access plans. North Yorkshire Council | New Road | Street works to facilitate the construction of the proposed access and cable works within the carriageway for the length shown in green on Sheet 22 of the streets, rights of way and access plans. North Yorkshire Council | Carr Lane | Street works to facilitate the construction of the proposed access for the length shown in green on Sheet 22 of the streets, rights of way and access plans.

Propose a change

SCHEDULE 5 ALTERATION OF STREETS

Articles 9 and 10 PART 1 PERMANENT ALTERATION OF LAYOUT (1) Area | (2) Street | (3) Description of the Alteration East Riding of Yorkshire | Field Access off Willitoft Road | Existing field access at the point marked 2/01 on Sheet 2 of the streets, rights of way and access plans to be stopped up. East Riding of Yorkshire | Proposed Access off Willitoft Road | Proposed access to be constructed at the point marked 2/03 on Sheet 2 of the streets, rights of way and access plans. East Riding of Yorkshire | Proposed Passing Place off Willitoft Road | Proposed passing place to be constructed to the west of the point marked 2/05 on Sheet 2 of the streets, rights of way and access plans. East Riding of Yorkshire | Field Access off Willitoft Road | Existing field access at the point marked 2/04 on Sheet 2 of the streets, rights of way and access plans to be stopped up. East Riding of Yorkshire | Field Access off Tottering Lane | Existing field access at the point marked 3/01 on Sheet 3 of the streets, rights of way and access plans to be stopped up. East Riding of Yorkshire | Field Access off Unnamed Road | Existing field access at the point marked 3/03 on Sheet 3 of the streets, rights of way and access plans to be stopped up. East Riding of Yorkshire | Field Access off Unnamed Road | Existing field access at the point marked 3/04 on Sheet 3 of the streets, rights of way and access plans to be stopped up. East Riding of Yorkshire | Proposed Access off Tottering Lane | Proposed access to be constructed at the point marked 3/05 on Sheet 3 of the streets, rights of way and access plans. East Riding of Yorkshire | Field Access off Tottering Lane | Existing field access at the point marked 4/04 on Sheet 4 of the streets, rights of way and access plans to be stopped up. East Riding of Yorkshire | Field Access off Tottering Lane | Existing field access at the point marked 4/05 on Sheet 4 of the streets, rights of way and access plans to be stopped up. East Riding of Yorkshire | Field Access off Tottering Lane | Existing field access at the point marked 4/06 on Sheet 4 of the streets, rights of way and access plans to be retained and improved. East Riding of Yorkshire | Field Access off Tottering Lane | Existing field access at the point marked 4/07 on Sheet 4 of the streets, rights of way and access plans to be stopped up. East Riding of Yorkshire | Field Access off Tottering Lane | Existing field access at the point marked 4/09 on Sheet 4 of the streets, rights of way and access plans to be retained and improved. East Riding of Yorkshire | Field Access off Tottering Lane | Existing field access at the point marked 4/10 on Sheet 4 of the streets, rights of way and access plans to be stopped up. East Riding of Yorkshire | Proposed Access off Tottering Lane | Proposed access to be constructed at the point marked 4/11 on Sheet 4 of the streets, rights of way and access plans. East Riding of Yorkshire | Field Access off Tottering Lane | Existing field access at the point marked 4/12 on Sheet 4 of the streets, rights of way and access plans to be stopped up. East Riding of Yorkshire | Field Access off Tottering Lane | Existing field access at the point marked 4/15 on Sheet 4 of the streets, rights of way and access plans to be stopped up. East Riding of Yorkshire | Proposed Access off Tottering Lane | Proposed access to be constructed at the point marked 4/16 on Sheet 4 of the streets, rights of way and access plans. East Riding of Yorkshire | Field Access off Tottering Lane | Existing field access at the point marked 4/17 on Sheet 4 of the streets, rights of way and access plans to be retained and improved. East Riding of Yorkshire | Field Access off Tottering Lane | Existing field access at the point marked 4/18 on Sheet 4 of the streets, rights of way and access plans to be stopped up. East Riding of Yorkshire | Field Access off Ings Lane | Existing field access at the point marked 6/02 on Sheet 6 of the streets, rights of way and access plans to be stopped up. East Riding of Yorkshire | Field Access off Ings Lane | Existing field access at the point marked 6/03 on Sheet 6 of the streets, rights of way and access plans to be retained and improved. East Riding of Yorkshire | Field Access off Ings Lane | Existing field access at the point marked 6/05 on Sheet 6 of the streets, rights of way and access plans to be stopped up. East Riding of Yorkshire | Proposed Passing Place off Ings Lane | Proposed passing place to be constructed to the west of the point marked 6/05 on Sheet 6 of the streets, rights of way and access plans. East Riding of Yorkshire | Field Access off Ings Lane | Existing field access at the point marked 6/08 on Sheet 6 of the streets, rights of way and access plans to be stopped up. East Riding of Yorkshire | Field Access off Ings Lane | Existing field access at the point marked 6/09 on Sheet 6 of the streets, rights of way and access plans to be stopped up. East Riding of Yorkshire | Proposed Passing Place off Ings Lane | Proposed passing place to be constructed to the east of the point marked 6/09 on Sheets 6 and 7 of the streets, rights of way and access plans. East Riding of Yorkshire | Field Access off Ings Lane | Existing field access at the point marked 7/02 on Sheet 7 of the streets, rights of way and access plans to be retained and improved. East Riding of Yorkshire | Field Access off B1228 Street Lane | Existing field access at the point marked 8/01 on Sheet 8 of the streets, rights of way and access plans to be retained and improved. East Riding of Yorkshire | Field Access off Wood Lane | Existing field access at the point marked 9/02 on Sheet 9 of the streets, rights of way and access plans to be retained and improved. East Riding of Yorkshire | Field Access off Wood Lane | Existing field access at the point marked 9/16 on Sheet 9 of the streets, rights of way and access plans to be retained and improved. East Riding of Yorkshire | Field Access off Spaldington Road | Existing field access at the point marked 10/02 on Sheet 10 of the streets, rights of way and access plans to be stopped up. East Riding of Yorkshire | Field Access off Spaldington Road | Existing field access at the point marked 10/03 on Sheet 10 of the streets, rights of way and access plans to be stopped up. East Riding of Yorkshire | Field Access off Spaldington Road | Existing field access at the point marked 10/05 on Sheet 10 of the streets, rights of way and access plans to be stopped up. East Riding of Yorkshire | Field Access off Willitoft Road | Existing field access at the point marked 10/07 on Sheet 10 of the streets, rights of way and access plans to be stopped up. East Riding of Yorkshire | Field Access off Willitoft Road | Existing field access at the point marked 10/08 on Sheet 10 of the streets, rights of way and access plans to be retained and improved. East Riding of Yorkshire | Field Access off Willitoft Road | Existing field access at the point marked 10/12 on Sheet 10 of the streets, rights of way and access plans to be stopped up. East Riding of Yorkshire | Field Access off Spaldington Road | Existing field access at the point marked 10/18 on Sheet 10 of the streets, rights of way and access plans to be retained and improved. East Riding of Yorkshire | Field Access off Spaldington Road | Existing field access at the point marked 10/24 on Sheet 10 of the streets, rights of way and access plans to be stopped up. East Riding of Yorkshire | Field Access off A614 | Existing field access at the point marked 12/03 on Sheet 12 of the streets, rights of way and access plans to be retained and improved. East Riding of Yorkshire | Field Access off B1228 Street Lane | Existing field access at the point marked 13/01 on Sheet 13 of the streets, rights of way and access plans to be stopped up. East Riding of Yorkshire | Field Access off B1228 Street Lane | Existing field access at the point marked 13/03 on Sheet 13 of the streets, rights of way and access plans to be retained and improved. East Riding of Yorkshire | Field Access off B1228 Street Lane | Existing field access at the point marked 13/06 on Sheet 13 of the streets, rights of way and access plans to be retained and improved. East Riding of Yorkshire | Field Access off Wood Lane | Existing field access at the point marked 14/02 on Sheet 14 of the streets, rights of way and access plans to be stopped up. East Riding of Yorkshire | Field Access off Wood Lane | Existing field access at the point marked 14/03 on Sheet 14 of the streets, rights of way and access plans to be retained and improved. East Riding of Yorkshire | Proposed Passing Place off Wood Lane | Proposed passing place to be constructed at the point marked 14/07 on Sheet 14 of the streets, rights of way and access plans. East Riding of Yorkshire | Field Access of Rowlandhall Lane | Existing field access at the point marked 15/07 on Sheet 15 of the streets, rights of way and access plans to be stopped up. East Riding of Yorkshire | Proposed Passing Place off Rowlandhall Lane | Proposed passing place to be constructed to north of the point marked 15/08 on Sheet 15 of the streets, rights of way and access plans. East Riding of Yorkshire | Proposed Passing Place off Rowlandhall Lane | Proposed passing place to be constructed at the point marked 15/09 on Sheet 15 of the streets, rights of way and access plans. East Riding of Yorkshire | Proposed Passing Place off Rowlandhall Lane | Proposed passing place to be constructed to south of the point marked 15/10 on Sheet 15 of the streets, rights of way and access plans. East Riding of Yorkshire | Field Access off Unnamed Road | Existing field access at the point marked 15/11 on Sheet 15 of the streets, rights of way and access plans to be stopped up. East Riding of Yorkshire | Field Access off Wood Lane | Existing field access at the point marked 15/12 on Sheet 15 of the streets, rights of way and access plans to be retained and improved. East Riding of Yorkshire | Field Access off Brind Lane | Existing field access at the point marked 15/16 on Sheet 15 of the streets, rights of way and access plans to be stopped up. East Riding of Yorkshire | Field Access off Brind Lane | Existing field access at the point marked 15/20 on Sheet 15 of the streets, rights of way and access plans to be stopped up. East Riding of Yorkshire | Field Access off Rowlandhall Lane | Existing field access at the point marked 16/01 on Sheet 16 of the streets, rights of way and access plans to be retained and improved. East Riding of Yorkshire | Field Access off Unnamed Road | Existing field access at the point marked 17/07 on Sheet 17 of the streets, rights of way and access plans to be stopped up. East Riding of Yorkshire | Field Access off Brind Lane | Existing field access at the point marked 17/09 on Sheet 17 of the streets, rights of way and access plans to be stopped up. East Riding of Yorkshire | Field Access off Wood Lane | Existing field access at the point marked 18/06 on Sheet 18 of the streets, rights of way and access plans to be retained and improved. East Riding of Yorkshire | Proposed Passing Place off Wood Lane | Proposed passing place to be constructed at the point marked 18/07 on Sheet 18 of the streets, rights of way and access plans. North Yorkshire Council | Field Access off A63 Hull Road | Existing field access at the point marked 19/08 on Sheet 19 of the streets, rights of way and access plans to be retained and improved. North Yorkshire Council | Proposed Access off Unnamed Access Track | Proposed access to be constructed at the point marked 19/18 on Sheet 19 of the streets, rights of way and access plans. North Yorkshire Council | Field Access off Pear Tree Avenue | Existing field access at the point marked 21/09 on Sheet 21 of the streets, rights of way and access plans to be retained and improved. North Yorkshire Council | Field Access off Pear Tree Avenue | Existing field access at the point marked 21/10 on Sheet 21 of the streets, rights of way and access plans to be retained and improved. North Yorkshire Council | Field Access off New Road | Existing field access at the point marked 22/01 on Sheet 22 of the streets, rights of way and access plans to be retained and improved. North Yorkshire Council | Proposed Access off New Road | Proposed access to be constructed at the point marked 22/04 on Sheet 22 of the streets, rights of way and access plans. North Yorkshire Council | Field Access off Carr Lane | Existing field access at the point marked 22/10 on Sheet 22 of the streets, rights of way and access plans to be retained and improved. PART 2 TEMPORARY ALTERATION OF LAYOUT (1) Area | (2) Street | (3) Description of the Alteration East Riding of Yorkshire | Field Access off B1228 Street Lane | Existing field access at the point marked 8/02 on Sheet 8 of the streets, rights of way and access plans to be managed during construction. East Riding of Yorkshire | Proposed Temporary Passing Place off Wood Lane | Existing informal passing place to be temporarily upgraded and maintained during construction at the point marked 9/03 on Sheet 9 of the streets, rights of way and access plans. East Riding of Yorkshire | Proposed Temporary Passing Place off Wood Lane | Existing informal passing place to be temporarily upgraded and maintained during construction at the point marked 9/09 on Sheet 9 of the streets, rights of way and access plans. East Riding of Yorkshire | Proposed Temporary Passing Place off Wood Lane | Existing informal passing place to be temporarily upgraded and maintained during construction at the point marked 9/14 on Sheet 9 of the streets, rights of way and access plans. East Riding of Yorkshire | Proposed Temporary Passing Place off Wood Lane | Existing informal passing place to be temporarily upgraded and maintained during construction south of the point marked 9/16 on Sheet 9 of the streets, rights of way and access plans. East Riding of Yorkshire | Proposed Temporary Passing Place off Wood Lane | Existing informal passing place to be temporarily upgraded and maintained during construction east of the point marked 14/07 on Sheet 14 of the streets, rights of way and access plans. East Riding of Yorkshire | Proposed Temporary Passing Place off Wood Lane | Existing informal passing place to be temporarily upgraded and maintained during construction at the point marked 14/04 on Sheet 14 of the streets, rights of way and access plans. East Riding of Yorkshire | Proposed Temporary Passing Place off Wood Lane | Existing informal passing place to be temporarily upgraded and maintained during construction west of the point marked 14/06 on Sheet 14 of the streets, rights of way and access plans. East Riding of Yorkshire | Proposed Temporary Passing Place off Wood Lane | Existing informal passing place to be temporarily upgraded and maintained during construction east of the point marked 14/03 on Sheet 14 of the streets, rights of way and access plans. North Yorkshire Council | Access off A63 Hull Road | Existing access at the point marked 19/14 on Sheet 19 of the streets, rights of way and access plans to be managed during construction. North Yorkshire Council | Private Means of Access off Unnamed Access Track | Existing access at the point marked 19/16 on Sheet 19 of the streets, rights of way and access plans to be managed during construction.

Propose a change

SCHEDULE 6 STREETS AND PUBLIC RIGHTS OF WAY

Article 11 PART 1 STREETS TO BE TEMPORARILY CLOSED (SINGLE LANE CLOSURES / ROAD CLOSURE) (1) Area | (2) Street | (3) Measures East Riding of Yorkshire | Willitoft Road | Temporarily closed to all traffic save for traffic under the direction of the undertaker for the width of the street to facilitate the construction of the authorised development for the length shown in green on Sheet 2 of the streets, rights of way and access plans. East Riding of Yorkshire | Tottering Lane | Temporarily closed to all traffic save for traffic under the direction of the undertaker for the width of the street to facilitate the construction of the authorised development for the lengths shown in green on Sheets 3 and 4 of the streets, rights of way and access plans. East Riding of Yorkshire | Willitoft Road south of junction of Tottering Lane with Willitoft Road | Temporarily closed to all traffic save for traffic under the direction of the undertaker for the width of the street to facilitate the construction of the authorised development for the length shown in green on Sheet 4 of the streets, rights of way and access plans. East Riding of Yorkshire | Ings Lane | Temporarily closed to all traffic save for traffic under the direction of the undertaker for the width of the street to facilitate the construction of the authorised development for the length shown in green on Sheets 6 and 7 of the streets, rights of way and access plans. East Riding of Yorkshire | Ings Lane | Temporarily closed to all traffic save for traffic under the direction of the undertaker for the width of the street to facilitate the construction of the authorised development for the length shown in green on Sheet 7 of the streets, rights of way and access plans. East Riding of Yorkshire | B1228 Street Lane | Temporarily closed to all traffic save for traffic under the direction of the undertaker for the width of the street to facilitate the construction of the authorised development for the length shown in green on Sheet 8 of the streets, rights of way and access plans. East Riding of Yorkshire | B1228 North of the Junction of Wood Lane and B1228 Street Lane | Temporarily closed to all traffic save for traffic under the direction of the undertaker for the width of the street to facilitate the construction of the authorised development for the length shown in green on Sheet 9 of the streets, rights of way and access plans. East Riding of Yorkshire | Wood Lane to North East of Junction with B1228 Street Lane | Temporarily closed to all traffic save for traffic under the direction of the undertaker for the width of the street to facilitate the construction of the authorised development for the length shown in green on Sheet 9 of the streets, rights of way and access plans. East Riding of Yorkshire | Wood Lane to South West of Junction with B1228 Street Lane | Temporarily closed to all traffic save for traffic under the direction of the undertaker for the width of the street to facilitate the construction of the authorised development for the length shown in green on Sheets 9 and 14 of the streets, rights of way and access plans. East Riding of Yorkshire | Willitoft Road between Spaldington and Spaldington Common | Temporarily closed to all traffic save for traffic under the direction of the undertaker for the width of the street to facilitate the construction of the authorised development for the length shown in green on Sheet 10 of the streets, rights of way and access plans. East Riding of Yorkshire | Spaldington Road adjacent to Spaldington Common | Temporarily closed to all traffic save for traffic under the direction of the undertaker for the width of the street to facilitate the construction of the authorised development for the lengths shown in green on Sheet 10 of the streets, rights of way and access plans. East Riding of Yorkshire | A614 | Temporarily closed to all traffic save for traffic under the direction of the undertaker for the width of the street to facilitate the construction of the authorised development for the length shown in green on Sheet 12 of the streets, rights of way and access plans. East Riding of Yorkshire | B1228 Street Lane | Temporarily closed to all traffic save for traffic under the direction of the undertaker for the width of the street to facilitate the construction of the authorised development for the lengths shown in green on Sheet 13 of the streets, rights of way and access plans. East Riding of Yorkshire | Wood Lane adjacent to junction with Brind Lane | Temporarily closed to all traffic save for traffic under the direction of the undertaker for the width of the street to facilitate the construction of the authorised development for the lengths shown in green on Sheet 14 of the streets, rights of way and access plans. East Riding of Yorkshire | Wood Lane | Temporarily closed to all traffic save for traffic under the direction of the undertaker for the width of the street to facilitate the construction of the authorised development for the length shown in green on Sheets 14 and 15 of the streets, rights of way and access plans. East Riding of Yorkshire | Rowlandhall Lane North of Level Crossing to junction with Wood Lane | Temporarily closed to all traffic save for traffic under the direction of the undertaker for the width of the street to facilitate the construction of the authorised development for the length shown in green on Sheet 15 of the streets, rights of way and access plans. East Riding of Yorkshire | Rowlandhall Lane adjacent to Level Crossing | Temporarily closed to all traffic save for traffic under the direction of the undertaker for the width of the street to facilitate the construction of the authorised development for the length shown in green on Sheet 15 of the streets, rights of way and access plans. East Riding of Yorkshire | Rowlandhall Lane | Temporarily closed to all traffic save for traffic under the direction of the undertaker for the width of the street to facilitate the construction of the authorised development for the length shown in green on Sheet 16 of the streets, rights of way and access plans. East Riding of Yorkshire | Wood Lane South West of Level Crossing | Temporarily closed to all traffic save for traffic under the direction of the undertaker for the width of the street to facilitate the construction of the authorised development for the lengths shown in green on Sheet 18 of the streets, rights of way and access plans. East Riding of Yorkshire | Station Road | Temporarily closed to all traffic save for traffic under the direction of the undertaker for the width of the street to facilitate the construction of the authorised development for the length shown in green on Sheet 18 of the streets, rights of way and access plans. North Yorkshire Council | A63 Hull Road | Temporarily closed to all traffic save for traffic under the direction of the undertaker for the width of the street to facilitate the construction of the authorised development for the length shown in green on Sheet 19 of the streets, rights of way and access plans. North Yorkshire Council | Unnamed Access Road | Temporarily closed to all traffic save for traffic under the direction of the undertaker for the width of the street to facilitate the construction of the authorised development for the length shown in green on Sheet 19 of the streets, rights of way and access plans. North Yorkshire Council | Pear Tree Avenue | Temporarily closed to all traffic save for traffic under the direction of the undertaker for the width of the street to facilitate the construction of the authorised development for the length shown in green on Sheet 21 of the streets, rights of way and access plans. North Yorkshire Council | New Road | Temporarily closed to all traffic save for traffic under the direction of the undertaker for the width of the street to facilitate the construction of the authorised development for the length shown in green on Sheet 22 of the streets, rights of way and access plans. North Yorkshire Council | Carr Lane | Temporarily closed to all traffic save for traffic under the direction of the undertaker for the width of the street to facilitate the construction of the authorised development for the length shown in green on Sheet 22 of the streets, rights of way and access plans. PART 2 PUBLIC RIGHTS OF WAY TO BE TEMPORARILY CLOSED AND DIVERTED (1) Area | (2) Public right of way | (3) Measures East Riding of Yorkshire | FOGGF13 | Public Right of Way to be temporarily stopped up and diverted between points PRoW-04/01 and PRoW-04/02 as shown on Sheet 4 of the streets, rights of way and access plans to facilitate the construction of the authorised development. East Riding of Yorkshire | Howden Public Right of Way | Public Right of Way to be temporarily stopped up and diverted between points PRoW-04/02 and PRoW-04/03 as shown on Sheet 4 of the streets, rights of way and access plans to facilitate the construction of the authorised development. East Riding of Yorkshire | BUBWF10 | Public Right of Way to be temporarily stopped up and diverted between points PRoW-08/04 and PRoW-08/05 as shown on Sheet 8 of the streets, rights of way and access plans to facilitate the construction of the authorised development. East Riding of Yorkshire | Howden Public Right of Way | Public Right of Way to be temporarily stopped up and diverted between points PRoW-10/04 and PRoW-10/05 as shown on Sheet 10 of the streets, rights of way and access plans to facilitate the construction of the authorised development. East Riding of Yorkshire | WRESF06 | Public Right of Way to be temporarily stopped up and diverted between points PRoW-16/03 and PRoW-16/04 as shown on Sheet 16 of the streets, rights of way and access plans to facilitate the construction of the authorised development. East Riding of Yorkshire | 35.47/1/1 | Public Right of Way to be temporarily stopped up and diverted between points PRoW-21/03 and PRoW-21/04 as shown on Sheet 21 of the streets, rights of way and access plans to facilitate the construction of the authorised development. PART 3 PERMANENT USE OF MOTOR VEHICLES ON PUBLIC RIGHT OF WAY (1) Area | (2) Public right of way | (3) Measures East Riding of Yorkshire | FOGGF13 | Permanent use of motor vehicles under the direction of the undertaker between points PRoW-03/01 and PRoW-03/02 as shown on Sheet 3 of the streets, rights of way and access plans to facilitate the construction and operation of the authorised development. East Riding of Yorkshire | FOGGF13 | Permanent use of motor vehicles under the direction of the undertaker between points PRoW-04/01 and PRoW-04/02 as shown on Sheet 4 of the streets, rights of way and access plans to facilitate the construction and operation of the authorised development. East Riding of Yorkshire | SPALF15 | Permanent use of motor vehicles under the direction of the undertaker between points PRoW-04/05 and PRoW-06/03 as shown on Sheets 4 and 6 of the streets, rights of way and access plans to facilitate the construction and operation of the authorised development. East Riding of Yorkshire | FOGGF05 | Permanent use of motor vehicles under the direction of the undertaker between points PRoW-05/01 and PRoW-06/01 as shown on Sheets 5 and 6 of the streets, rights of way and access plans to facilitate the construction and operation of the authorised development. East Riding of Yorkshire | FOGGF05 | Permanent use of motor vehicles under the direction of the undertaker between points PRoW-06/02 and PRoW-06/04 as shown on Sheet 6 of the streets, rights of way and access plans to facilitate the construction and operation of the authorised development. East Riding of Yorkshire | SPALB08 | Permanent use of motor vehicles under the direction of the undertaker between points PRoW-07/01 and PRoW-07/02 as shown on Sheet 7 of the streets, rights of way and access plans to facilitate the construction and operation of the authorised development. East Riding of Yorkshire | BUBWF10 | Permanent use of motor vehicles under the direction of the undertaker from points PRoW-08/04 and PRoW-08/05 as shown on Sheet 8 of the streets, rights of way and access plans to facilitate the construction and operation of the authorised development. East Riding of Yorkshire | SPALF17 | Permanent use of motor vehicles under the direction of the undertaker between points PRoW-10/01 and PRoW-10/02 as shown on Sheet 10 of the streets, rights of way and access plans to facilitate the construction and operation of the authorised development. East Riding of Yorkshire | WRESF06 | Permanent use of motor vehicles under the direction of the undertaker between points PRoW-16/01 and PRoW-16/02 as shown on Sheet 16 of the streets, rights of way and access plans to facilitate the construction and operation of the authorised development. East Riding of Yorkshire | WRESF06 | Permanent use of motor vehicles under the direction of the undertaker between points PRoW-16/03 and PRoW-17/01 as shown on Sheets 16 and 17 of the streets, rights of way and access plans to facilitate the construction and operation of the authorised development. East Riding of Yorkshire | WRESF10 | Permanent use of motor vehicles under the direction of the undertaker between points PRoW-16/05 and PRoW-16/06 as shown on Sheet 16 of the streets, rights of way and access plans to facilitate the construction and operation of the authorised development. East Riding of Yorkshire | WRESF08 | Permanent use of motor vehicles under the direction of the undertaker between points PRoW-16/07 and PRoW-16/08 as shown on Sheet 16 of the streets, rights of way and access plans to facilitate the construction and operation of the authorised development. East Riding of Yorkshire | WRESF09 | Permanent use of motor vehicles under the direction of the undertaker between points PRoW-17/01 and PRoW-17/03 as shown on Sheet 17 of the streets, rights of way and access plans to facilitate the construction and operation of the authorised development. PART 4 TEMPORARY MANAGEMENT OF PUBLIC RIGHTS OF WAY (1) Area | (2) Public right of way | (3) Measure (Public Right of Way to be managed during construction to maintain Public Right of Way continuity and access through the site). East Riding of Yorkshire | BUBWF17 | Public Right of Way between points PRoW-02/01 and PRoW-03/01 as shown on Sheets 2 and 3 of the streets, rights of way and access plans to be managed during construction of the authorised development. East Riding of Yorkshire | FOGGF13 | Public Right of Way between points PRoW-03/01 and PRoW-04/01 as shown on Sheets 3 and 4 of the streets, rights of way and access plans to be managed during construction of the authorised development. East Riding of Yorkshire | SPALF16 | Public Right of Way between points PRoW-04/03 to PRoW-04/04 as shown on Sheet 4 of the streets, rights of way and access plans to be managed during construction of the authorised development. East Riding of Yorkshire | SPALF15 | Public Right of Way between points PRoW-04/05 and PRoW-06/03 as shown on Sheets 4 and 6 of the streets, rights of way and access plans to be managed during construction of the authorised development. East Riding of Yorkshire | FOGGF05 | Public Right of Way between points PRoW-05/01 and PRoW-06/01 as shown on Sheets 5 and 6 of the streets, rights of way and access plans to be managed during construction of the authorised development. East Riding of Yorkshire | FOGGF05 | Public Right of Way between points PRoW-06/02 and PRoW-06/04 as shown on Sheet 6 of the streets, rights of way and access plans to be managed during construction of the authorised development. East Riding of Yorkshire | SPALF19 | Public Right of Way between points PRoW-06/05 and PRoW-06/06 as shown on Sheet 6 of the streets, rights of way and access plans to be managed during construction of the authorised development. East Riding of Yorkshire | SPALB08 | Public Right of Way between points PRoW-07/01 and PRoW-07/03 as shown on Sheet 7 of the streets, rights of way and access plans to be managed during construction of the authorised development. East Riding of Yorkshire | BUBWS11 | Public Right of Way between points PRoW-08/01 and PRoW-08/03 as shown on Sheet 8 of the streets, rights of way and access plans to be managed during construction of the authorised development. East Riding of Yorkshire | BUBWF10 | Public Right of Way between points PRoW-08/02 and PRoW-08/04 as shown on Sheet 8 of the streets, rights of way and access plans to be managed during construction of the authorised development. East Riding of Yorkshire | SPALF17 | Public Right of Way between points PRoW-10/01 and PRoW-10/03 as shown on Sheet 10 of the streets, rights of way and access plans to be managed during construction of the authorised development. East Riding of Yorkshire | SPALF18 | Public Right of Way between points PRoW-10/06 and PRoW-11/01 as shown on Sheets 10 and 11 of the streets, rights of way and access plans to be managed during construction of the authorised development. East Riding of Yorkshire | EASTB17 | Public Right of Way between points PRoW-11/02 and PRoW-11/03 as shown on Sheet 11 of the streets, rights of way and access plans to be managed during construction of the authorised development. East Riding of Yorkshire | WRESF07 | Public Right of Way between points PRoW-15/01 and PRoW-17/02 as shown on Sheets 15 and 17 of the streets, rights of way and access plans to be managed during construction of the authorised development. East Riding of Yorkshire | WRESF06 | Public Right of Way between points PRoW-16/01 and PRoW-16/02 as shown on Sheet 16 of the streets, rights of way and access plans to be managed during construction of the authorised development. East Riding of Yorkshire | WRESF06 | Public Right of Way between points PRoW-16/04 and PRoW-17/01 as shown on Sheets 16 and 17 of the streets, rights of way and access plans to be managed during construction of the authorised development. East Riding of Yorkshire | WRESF10 | Public Right of Way between points PRoW-16/05 and PRoW-16/06 as shown on Sheet 16 of the streets, rights of way and access plans to be managed during construction of the authorised development. East Riding of Yorkshire | WRESF08 | Public Right of Way between points PRoW-16/07 and PRoW-16/08 as shown on Sheet 16 of the streets, rights of way and access plans to be managed during construction of the authorised development. East Riding of Yorkshire | WRESF09 | Public Right of Way between points PRoW-17/01 and PRoW-17/03 as shown on Sheet 17 of the streets, rights of way and access plans to be managed during construction of the authorised development. North Yorkshire Council | 35.45/9/1 | Public Right of Way between points PRoW-18/01 and PRoW-18/02 as shown on Sheet 18 of the streets, rights of way and access plans to be managed during construction of the authorised development. East Riding of Yorkshire | WRESF12 | Public Right of Way between points PRoW-18/03 and PRoW-18/04 as shown on Sheet 18 of the streets, rights of way and access plans to be managed during construction of the authorised development. North Yorkshire Council | 35.45/6/1 | Public Right of Way between points PRoW-21/01 and PRoW-21/02 as shown on Sheet 21 of the streets, rights of way and access plans to be managed during construction of the authorised development. North Yorkshire Council | 35.47/1/2 | Public Right of Way between points PRoW-22/01 and PRoW-22/02 as shown on Sheet 22 of the streets, rights of way and access plans to be managed during construction of the authorised development. PART 5 TEMPORARY USE OF MOTOR VEHICLES ON PUBLIC RIGHTS OF WAY (1) Area | (2) Public right of way | (3) Measures East Riding of Yorkshire | FOGGF13 | Temporary use of motor vehicles under the direction of the undertaker between points PRoW-03/01 and PRoW-03/02 as shown on Sheet 3 of the streets, rights of way and access plans to facilitate construction of the authorised development. East Riding of Yorkshire | BUBWS11 | Temporary use of motor vehicles under the direction of the undertaker between points PRoW-08/01 and PRoW-08/03 as shown on Sheet 8 of the streets, rights of way and access plans to facilitate construction of the authorised development. East Riding of Yorkshire | BUBWF10 | Temporary use of motor vehicles under the direction of the undertaker between points PRoW-08/02 and PRoW-08/04 as shown on Sheet 8 of the streets, rights of way and access plans to facilitate construction of the authorised development. East Riding of Yorkshire | SPALF17 | Temporary use of motor vehicles under the direction of the undertaker between points PRoW-10/02 and PRoW-10/03 as shown on Sheet 10 of the streets, rights of way and access plans to facilitate construction of the authorised development. North Yorkshire Council | 35.47/1/1 | Temporary use of motor vehicles under the direction of the undertaker between points PRoW-21/03 and PRoW-21/04 as shown on Sheet 21 of the streets, rights of way and access plans to facilitate construction of the authorised development. North Yorkshire Council | 35.47/1/2 | Temporary use of motor vehicles under the direction of the undertaker between points PRoW-22/01 and PRoW-22/02 as shown on Sheet 22 of the streets, rights of way and access plans to facilitate construction of the authorised development.

Propose a change

SCHEDULE 7 PERMANENT MEANS OF ACCESS TO WORKS

Article 13 (1) Area | (2) Public right of way | (3) Description of Means of Access East Riding of Yorkshire | Proposed Access off Willitoft Road | Proposed access to be constructed at the point marked 2/03 on Sheet 2 of the streets, rights of way and access plans. East Riding of Yorkshire | Proposed Access off Tottering Lane | Proposed access to be constructed at the point marked 3/05 on Sheet 3 of the streets, rights of way and access plans. East Riding of Yorkshire | Proposed Access off Tottering Lane | Proposed access to be constructed at the point marked 4/11 on Sheet 4 of the streets, rights of way and access plans. East Riding of Yorkshire | Proposed Access off Tottering Lane | Proposed access to be constructed at the point marked 4/16 on Sheet 4 of the streets, rights of way and access plans. North Yorkshire Council | Proposed Access off Unnamed Access Track | Proposed access to be constructed at the point marked 19/18 on Sheet 19 of the streets, rights of way and access plans. North Yorkshire Council | Proposed Access off New Road | Proposed access to be constructed at the point marked 22/04 on Sheet 22 of the streets, rights of way and access plans.

Propose a change

SCHEDULE 8 TRAFFIC REGULATION MEASURES

Article 15 (1) Area | (2) Extent of temporary traffic signal and banksman control area Junction of A163 Highfield Road and B1228 Street Lane to facilitate abnormal load manoeuvre. | Extents of traffic signals and banksman control presented on Sheet 1 of the traffic regulation measures plans. Willitoft Road Eastbound and Westbound Carriageway to facilitate the construction of the authorised development. | Extents of traffic signals and banksman control presented on Sheet 2 of the traffic regulation measures plans. Tottering Lane Northbound and Southbound Carriageway to facilitate the construction of the authorised development. | Extents of traffic signals and banksman control presented on Sheets 3 and 4 of the traffic regulation measures plans. Willitoft Road Northbound and Southbound Carriageway south of junction of Tottering Lane with Willitoft Road to facilitate the construction of the authorised development. | Extents of traffic signals and banksman control presented on Sheet 4 of the traffic regulation measures plans. Wood Lane Northbound and Southbound Carriageway commencing to the North East of the Junction with B1228 Street Lane to facilitate the construction of the authorised development. | Extents of traffic signals and banksman control presented on Sheets 4 and 9 of the traffic regulation measures plans. Ings Lane Eastbound and Westbound Carriageway to facilitate the construction of the authorised development. | Extents of traffic signals and banksman control presented on Sheets 6 and 7 of the traffic regulation measures plans. B1228 Street Lane Northbound and Southbound Carriageway to facilitate the construction of the authorised development. | Extents of traffic signals and banksman control presented on Sheet 8 of the traffic regulation measures plans. B1228 Street Lane Northbound and Southbound Carriageway North of the Junction with Wood Lane and B1228 Street Lane to facilitate the construction of the authorised development. | Extents of traffic signals and banksman control presented on Sheet 9 of the traffic regulation measures plans. Wood Lane Northbound and Southbound Carriageway inclusive of Wood Lane and B1228 Street Lane to facilitate the construction of the authorised development. | Extents of traffic signals and banksman control presented on Sheets 9, 13, 14 and 15 of the traffic regulation measures plans. Willitoft Road Northbound and Southbound Carriageway between Spaldington Common and village of Spaldington to facilitate the construction of the authorised development. | Extents of traffic signals and banksman control presented on Sheet 10 of the traffic regulation measures plans. Spaldington Road Eastbound and Westbound Carriageway within Spaldington Common to facilitate the construction of the authorised development. | Extents of traffic signals and banksman control presented on Sheet 10 of the traffic regulation measures plans. Spaldington Road Eastbound and Westbound Carriageway adjacent to the west of Spaldington Common facilitate the construction of the authorised development. | Extents of traffic signals and banksman control presented on Sheet 10 of the traffic regulation measures plans. A614 Northbound and Southbound Carriageway to facilitate the construction of the authorised development. | Extents of traffic signals and banksman control presented on Sheet 12 of the traffic regulation measures plans. B1228 Street Lane Northbound and Southbound Carriageway commencing to the North of the Junction of B1228 Street Lane with Spaldington Road to facilitate the construction of the authorised development. | Extents of traffic signals and banksman control presented on Sheet 13 of the traffic regulation measures plans. Rowlandhall Lane Northbound and Southbound north of the level crossing to facilitate the construction of the authorised development. | Extents of traffic signals and banksman control presented on Sheet 15 of the traffic regulation measures plans. Rowlandhall Lane Northbound and Southbound adjacent to the level crossing to facilitate the construction of the authorised development. | Extents of traffic signals and banksman control presented on Sheet 15 of the traffic regulation measures plans. Rowlandhall Lane Northbound and Southbound Carriageway to facilitate the construction of the authorised development. | Extents of traffic signals and banksman control presented on Sheet 16 of the traffic regulation measures plans. Wood Lane Eastbound and Westbound Carriageway commencing to the Southwest of the Level Crossing to facilitate the construction of the authorised development. | Extents of traffic signals and banksman control presented on Sheet 18 of the traffic regulation measures plans. Station Road Northbound and Southbound Carriageway to facilitate the construction of the authorised development. | Extents of traffic signals and banksman control presented on Sheet 18 of the traffic regulation measures plans. A63 Hull Road Eastbound and Westbound Carriageway to facilitate the construction of the authorised development. | Extents of traffic signals and banksman control presented on Sheet 19 of the traffic regulation measures plans. Pear Tree Avenue Eastbound and Westbound Carriageway to facilitate the construction of the authorised development. | Extents of traffic signals and banksman control presented on Sheet 21 of the traffic regulation measures plans. Carr Lane Eastbound and Westbound Carriageway to facilitate the construction of the authorised development. | Extents of traffic signals and banksman control presented on Sheet 22 of the traffic regulation measures plans. New Road Northbound and Southbound and Wren Hall Lane Eastbound and Westbound Carriageway to facilitate the construction of the authorised development. | Extents of traffic signals and banksman control presented on Sheet 22 of the traffic regulation measures plans.

Propose a change

SCHEDULE 9 LAND IN WHICH ONLY NEW RIGHTS ETC. MAY BE ACQUIRED

Article 22 Interpretation 1 In this Schedule— “access rights” means rights over land to— alter, improve, form, maintain, retain, use (with or without vehicles, plant and machinery), remove, reinstate means of access to the authorised development including visibility splays, bridges and road widening and to remove impediments (including vegetation) to such access; remain, pass and repass on foot, with or without vehicles, plant and machinery (including rights to lay and use any temporary surface) for all purposes in connection with the authorised development; install, use, support, protect, inspect, alter, remove, replace, refurbish, reconstruct, retain, renew, improve and maintain security fencing, gates, boundary treatment, public rights of way and any other ancillary apparatus and any other works as necessary; install, execute, implement, retain, repair, improve, renew, remove, relocate and plant trees, woodlands, shrubs, hedgerows, seeding, landscaping and other ecological measures together with the right to maintain, inspect and replant such trees, shrubs, hedgerows, landscaping and other ecological measures the right to pass and repass on foot, with or without vehicles, plant and machinery for all purposes in connection with the implementation and maintenance of landscaping and ecological mitigation or enhancement works; restrict and remove the erection of buildings or structures, restrict the altering of ground levels, restrict and remove the planting of trees or carrying out operations or actions (including but not limited to blasting and piling) which may obstruct, interrupt or interfere with the exercise of the rights or damage the authorised development; and install, use, support, protect, inspect, alter, remove, replace, refurbish, reconstruct, retain, renew, improve and maintain sewers, drains, pipes, ducts, mains, conduits, services, flues and to drain into and manage waterflows in any drains, watercourses and culverts. “cable rights” means rights over land to— install, use, support, protect, inspect, alter, remove, replace, refurbish, reconstruct, retain, renew, improve and maintain electrical underground cables, earthing cables, optical fibre cables, data cables, telecommunications cables and other services, works associated with such cables including bays, ducts, protection and safety measures and equipment, and other ancillary apparatus and structures (including but not limited to access chambers, manholes and marker posts) and any other works necessary together with the right to fell, trim or lop trees and bushes which may obstruct or interfere with the said cables, telecommunications and other ancillary apparatus; remain, pass and repass on foot, with or without vehicles, plant and machinery (including rights to lay and use any temporary surface or form a temporary compound) for all purposes in connection with the authorised development; continuous vertical and lateral support for the authorised development; install, use, support, protect, inspect, alter, remove, replace, refurbish, reconstruct, retain, renew, improve and maintain sewers, drains, pipes, ducts, mains, conduits, services, flues and to drain into and manage waterflows in any drains, watercourses and culverts; install, execute, implement, retain, repair, improve, renew, remove, relocate and plant trees, woodlands, shrubs, hedgerows, seeding, landscaping and other ecological measures together with the right to maintain, inspect and replant such trees, shrubs, hedgerows, landscaping and other ecological measures the right to pass and repass on foot, with or without vehicles, plant and machinery for all purposes in connection with the implementation and maintenance of landscaping and ecological mitigation or enhancement works; install, use, support, protect, inspect, alter, remove, replace, refurbish, reconstruct, retain, renew, improve and maintain security fencing, gates, boundary treatment, public rights of way and any other ancillary apparatus and any other works as necessary; and restrict and remove the erection of buildings or structures, restrict the altering of ground levels, restrict and remove vegetation and restrict the planting of trees or carrying out operations or actions (including but not limited to blasting and piling) which may obstruct, interrupt or interfere with the exercise of the rights or damage the authorised development. (1) Plot reference number shown on the Land Plans | (2) Purposes for which rights over land may be required and restrictive covenants imposed 1/01 | Access rights 1/03 | Access rights 1/04 | Access rights 2/05 | Access rights 3/10 | Cable rights 4/13 | Cable rights 4/14 | Cable rights 4/21 | Cable rights 4/22 | Cable rights 4/23 | Cable rights 4/24 | Cable rights 4/25 | Cable rights 4/27 | Cable rights 4/28 | Cable rights 6/34 | Cable rights 6/35 | Cable rights 6/36 | Cable rights 6/37 | Cable rights 9/40 | Cable rights 10/43 | Access rights 10/44 | Cable rights 10/45 | Cable rights 10/46 | Access rights 11/49 | Cable rights 12/52 | Access rights 4/53 | Cable rights 9/54 | Cable rights 9/55 | Cable rights 9/56 | Cable rights 9/57 | Cable rights 13/60 | Cable rights 8/61 | Cable rights 9/62 | Cable rights 8/63 | Cable rights 8/64 | Access rights 8/66 | Cable rights 14/68 | Cable rights 14/72 | Cable rights 14/75 | Cable rights 14/76 | Cable rights 14/77 | Cable rights 14/78 | Cable rights 15/81 | Cable rights 15/83 | Cable rights 16/87 | Cable rights 16/89 | Cable rights 16/90 | Cable rights 16/91 | Access rights 15/92 | Cable rights 15/93 | Cable rights 15/94 | Cable rights 18/95 | Cable rights 18/96 | Cable rights 18/97 | Cable rights 18/98 | Cable rights 18/99 | Cable rights 18/100 | Cable rights 18/101 | Cable rights 18/102 | Cable rights 18/103 | Cable rights 18/104 | Cable rights 18/105 | Cable rights 18/106 | Cable rights 18/107 | Cable rights 18/108 | Cable rights 18/109 | Cable rights 18/110 | Cable rights 19/111 | Cable rights 19/112 | Cable rights 19/113 | Cable rights 19/114 | Cable rights 19/115 | Cable rights 19/116 | Cable rights 19/117 | Cable rights 19/118 | Cable rights 19/119 | Cable rights 19/120 | Cable rights 19/121 | Access rights 19/122 | Cable rights 19/123 | Cable rights 19/124 | Cable rights 19/125 | Cable rights 19/126 | Cable rights 19/127 | Cable rights 19/128 | Cable rights 19/129 | Cable rights 20/130 | Cable rights 20/131 | Cable rights 20/132 | Cable rights 20/133 | Cable rights 20/134 | Cable rights 20/135 | Cable rights 20/136 | Cable rights 20/137 | Cable rights 20/138 | Cable rights 21/139 | Cable rights 21/140 | Cable rights 21/141 | Cable rights 21/142 | Cable rights 21/143 | Cable rights 21/144 | Cable rights 21/145 | Cable rights 21/146 | Cable rights 21/147 | Cable rights 21/148 | Cable rights 21/149 | Cable rights 21/150 | Cable rights 22/151 | Cable rights 21/152 | Cable rights 21/153 | Cable rights 22/154 | Cable rights 22/155 | Cable rights 22/156 | Cable rights 22/157 | Cable rights 22/158 | Access rights 22/159 | Access rights 22/160 | Access rights 22/161 | Access rights 22/162 | Access rights 22/163 | Access rights 22/164 | Cable rights 22/165 | Cable rights 22/166 | Cable rights 22/167 | Cable rights 22/168 | Cable rights 22/169 | Cable rights 22/170 | Cable rights 22/171 | Cable rights 22/172 | Cable rights 22/173 | Access rights

Propose a change

SCHEDULE 10 MODIFICATION OF COMPENSATION AND COMPULSORY PURCHASE ENACTMENTS FOR THE CREATION OF NEW RIGHTS AND IMPOSITION OF NEW RESTRICTIVE COVENANTS

Article 22 Compensation enactments 1 The enactments for the time being in force with respect to compensation for the compulsory purchase of land are to apply, with the necessary modifications as respects compensation, in the case of a compulsory acquisition under this Order of a right by the creation of a new right or the imposition of a restrictive covenant as they apply as respects compensation on the compulsory purchase of land and interests in land. 2 (1) Without limitation on the scope of paragraph 1, the Land Compensation Act 1973 has effect subject to the modifications set out in sub-paragraph (2). (2) In section 44(1) (compensation for injurious affection), as it applies to compensation for injurious affection under section 7 (measure of compensation in case of severance) of the 1965 Act as substituted by paragraph 5— (a) for the words “land is acquired or taken from” substitute “a right or restrictive covenant over land is purchased from or imposed on”, and (b) for the words “acquired or taken from him” substitute “over which the right is exercisable or the restrictive covenant enforceable”. 3 (1) Without limitation on the scope of paragraph 1, the 1961 Act has effect subject to the modifications set out in sub-paragraph (2). (2) In section 5A(5A) (relevant valuation date), omit the words after “if—” and substitute— (a) the acquiring authority enters on land for the purpose of exercising a right in pursuant of a notice of entry under section 11(1) of the 1965 Act (as modified by paragraph 5(5) of Schedule 10 (modification of compensation and compulsory purchase enactments for the creation of new rights and imposition of new restrictive covenants) to the East Yorkshire Solar Farm Order 2025; (b) the acquiring authority is subsequently required by a determination under paragraph 12 of Schedule 2A to the 1965 Act (as substituted by paragraph 5(7) of Schedule 10 to the East Yorkshire Solar Farm Order 2025) to acquire an interest in the land; and (c) the acquiring authority enters on and takes possession of that land, the authority is deemed for the purposes of subsection (3)(a) to have entered on that land where it entered on that land for the purpose of exercising that right. Application of Part 1 of the 1965 Act 4 Part 1 (compulsory purchase under Acquisition of Land Act 1981) of the 1965 Act, as applied by section 125 (application of compulsory acquisition provisions) of the 2008 Act to the acquisition of land under article 20 (compulsory acquisition of land) and as modified by article 27 (modification of Part 1 of the Compulsory Purchase Act 1965), applies to the compulsory acquisition of a right by the creation of a new right under article 22 (compulsory acquisition of rights)— (a) with the modifications specified in paragraph 5; and (b) with such other modifications as may be necessary. 5 (1) The modifications referred to in paragraph 4(a) are as follows— (2) References in the 1965 Act to land are, in the appropriate contexts, to be read (according to the requirements of the particular context) as referring to, or as including references to— (a) the right acquired or to be acquired, or the restriction imposed or to be imposed; or (b) the land over which the right is or is to be exercisable, or the restriction is to be enforceable. (3) For section 7 of the 1965 Act (measure of compensation in case of severance) substitute— 7. In assessing the compensation to be paid by the acquiring authority under this Act, regard must be had not only to the extent (if any) to which the value of the land over which the right is to be acquired or the restrictive covenant is to be imposed is depreciated by the acquisition of the right or the imposition of the covenant but also to the damage (if any) to be sustained by the owner of the land by reason of its severance from other land of the owner, or injuriously affecting that other land by the exercise of the powers conferred by this or the special Act. . (4) The following provisions of the 1965 Act (which state the effect of a deed poll executed in various circumstances where there is no conveyance by persons with interests in the land), that is to say— (a) section 9(4) (failure by owners to convey); (b) paragraph 10(3) of Schedule 1 (owners under incapacity); paragraph 2(3) of Schedule 2 (absent and untraced owners); and (c) paragraphs 2(3) and 7(2) of Schedule 4 (common land), are modified to secure that, as against persons with interests in the land which are expressed to be overridden by the deed, the right which is to be compulsorily acquired or the restrictive covenant which is to be imposed is vested absolutely in the acquiring authority. (5) Section 11 (powers of entry) of the 1965 Act is modified to secure that, as from the date on which the acquiring authority has served notice to treat in respect of any right or restrictive covenant, as well as the notice of entry required by subsection (1) of that section (as it applies to compulsory acquisition under article 20 (compulsory acquisition of land)), it has power, exercisable in equivalent circumstances and subject to equivalent conditions, to enter for the purpose of exercising that right or enforcing that restrictive covenant (which is deemed for this purpose to have been created on the date of service of the notice); and sections 11A (powers of entry: further notices of entry), 11B (counter-notice requiring possession to be taken on specified date), 12 (penalty for unauthorised entry) and 13 (refusal to give possession to acquiring authority) of the 1965 Act are modified correspondingly. (6) Section 20 (tenants at will, etc.) of the 1965 Act applies with the modifications necessary to secure that persons with such interests in land as are mentioned in that section are compensated in a manner corresponding to that in which they would be compensated on a compulsory acquisition under this Order of that land, but taking into account only the extent (if any) of such interference with such an interest as is actually caused, or likely to be caused, by the exercise of the right or enforcement of the restrictive covenant in question. (7) Section 22 (interests omitted from purchase) of the 1965 Act as modified by article 27 (modification of Part 1 of the Compulsory Purchase Act 1965) is so modified as to enable the acquiring authority, in circumstances corresponding to those referred to in that section, to continue to be entitled to exercise the right acquired or restrictive covenant imposed, subject to compliance with that section as respects compensation. (8) For Schedule 2A to the 1965 Act (counter notice requiring purchase of land not in notice to treat) substitute— SCHEDULE2A COUNTER-NOTICE REQUIRING PURCHASE OF LAND 1. (1) This Schedule applies where an acquiring authority serves a notice to treat in respect of a right over, or restrictive covenant affecting, the whole or part of a house, building or factory and have not executed a general vesting declaration under section 4 of the 1981 Act as applied by article 24 (application of the 1981 Act) of the East Yorkshire Solar Farm Order 2025 in respect of the land to which the notice to treat relates. (2) But see article 25(3) (acquisition of subsoil only) of the East Yorkshire Solar Farm Order 2025 which excludes the acquisition of subsoil only from this Schedule 2. In this Schedule, “house” includes any park or garden belonging to a house. Counter-notice requiring purchase of land 3. A person who is able to sell the house, building or factory (“the owner”) may serve a counter-notice requiring the authority to purchase the owner’s interest in the house, building or factory. 4. A counter-notice under paragraph 3 must be served within the period of 28 days beginning with the day on which the notice to treat was served. Response to counter-notice 5. On receiving a counter-notice, the acquiring authority must decide whether to— (a) withdraw the notice to treat, (b) accept the counter-notice, or (c) refer the counter notice to the Upper Tribunal. 6. The authority must serve notice of their decision on the owner within the period of three months beginning with the day on which the counter-notice is served (“the decision period”). 7. If the authority decides to refer the counter-notice to the Upper Tribunal they must do so within the decision period. 8. If the authority does not serve notice of a decision within the decision period they are to be treated as if they had served notice of a decision to withdraw the notice to treat at the end of that period. 9. If the authority serves notice of a decision to accept the counter-notice, the compulsory purchase order and the notice to treat are to have effect as if they included the owner’s interest in the house, building or factory. Determination by the Upper Tribunal 10. On a referral under paragraph 7, the Upper Tribunal must determine whether the acquisition of the right or the imposition of the restrictive covenant would— (a) in the case of a house, building or factory; cause material detriment to the house, building or factory, or (b) in the case of a park or garden, seriously affect the amenity or convenience of the house to which the park or garden belongs. 11. In making its determination, the Upper Tribunal must take into account— (a) the effect of the acquisition of the right or the imposition of the covenant, (b) the use to be made of the right or covenant proposed to be acquired or imposed, and (c) if the right or covenant is proposed to be acquired or imposed for works or other purposes extending to other land, the effect of the whole of the works and the use of the other land. 12. If the Upper Tribunal determines that the acquisition of the right or the imposition of the covenant would have either of the consequences described in paragraph 10, it must determine how much of the house, building or factory the authority ought to be required to take. 13. If the Upper Tribunal determines that the authority ought to be required to take some or all of the house, building or factory, the compulsory purchase order and the notice to treat are to have effect as if they included the owner’s interest in that land. 14. (1) If the Upper Tribunal determines that the authority ought to be required to take some or all of the house, building or factory, the authority may at any time within the period of six weeks beginning with the day on which the Upper Tribunal makes its determination withdraw the notice to treat in relation to that land. (2) If the acquiring authority withdraws the notice to treat under this paragraph they must pay the person on whom the notice was served compensation for any loss or expense cause by the giving and withdrawal of the notice. (3) Any dispute as to the compensation is to be determined by the Upper Tribunal. .

Propose a change

SCHEDULE 11 LAND OF WHICH TEMPORARY POSSESSION MAY BE TAKEN

Article 29 (1) Plot reference number shown on the Land Plans | (2) Purpose for which temporary possession may be taken 1/02 | Temporary use to facilitate the construction of Work No. 7 9/58 | Temporary use to facilitate the construction of Work Nos. 3, 4 & 7 9/59 | Temporary use to facilitate the construction of Work Nos. 3, 4 & 7 16/88 | Temporary use to facilitate the construction of Work Nos. 4 & 5

Propose a change

SCHEDULE 12 DOCUMENTS AND PLANS TO BE CERTIFIED

Article 40 PART 1 DOCUMENTS FORMING THE ENVIRONMENTAL STATEMENT TO BE CERTIFIED (1) Document name | (2) Document reference | (3) Revision number | (4) Date | (5) Examination Library Reference Environmental statement | EN010143/APP/6.1 | 0 | 19 January 2024 | APP-052 to APP-070 Technical Appendices | EN010143/APP/6.2 | 0 | 16 November 2023 | APP-071 to APP-132 Figures | EN010143/APP/6.3 | 0 | 16 November 2023 | APP-133 to APP-229 PART 2 EXAMINATION DOCUMENTS FORMING PART OF THE ENVIRONMENTAL STATEMENT TO BE CERTIFIED (1) Document name | (2) Document reference | (3) Revision number | (4) Date | (5) Examination Library Reference Environmental Statement Chapter 10 – Landscape and Visual Amenity | EN010143/APP/6.1 | 2 | 18 June 2024 | REP1-014 Environmental Statement Chapter 11 – Noise and Vibration | EN010143/APP/6.1 | 1 | 18 June 2024 | REP1-016 Appendix 7-4 – Archaeological Trial Trenching Evaluation Report | EN010143/APP/6.2 | 1 | 18 June 2024 | REP1-018 Appendix 8-10 – Great Crested Newt District Level Licensing Impact Assessment and Conservation Payment Certificate | EN010143/APP/6.2 | 1 | 18 June 2024 | REP1-019 Appendix 9-3 – Flood Risk Assessment, Annexes | EN010143/APP/6.2 | 1 | 03 September 2024 | REP5-011 Appendix 11-4 – Construction and Operational Noise Assessment | EN010143/APP/6.2 | 1 | 18 June 2024 | REP1-023 Appendix 13-4 – Transport Assessment | EN010143/APP/6.2 | 1 | 18 June 2024 | REP1-025 Environmental Statement Chapter 7 – Cultural Heritage | EN010143/APP/6.1 | 1 | 27 June 2024 | REP2-006 Appendix 17-1 – Shortlist of Cumulative Schemes | EN010143/APP/6.2 | 1 | 27 June 2024 | REP2-008 Figure 2-3 – Indicative Site Layout | EN010143/APP/6.3 | 1 | 18 June 2024 | REP1-028 Figure 10-8 – Representative Viewpoint Locations | EN010143/APP/6.3 | 1 | 18 June 2024 | REP1-029 Figure 10-10 – Viewpoint Photography VP02 | EN010143/APP/6.3 | 1 | 18 June 2024 | REP1-030 Figure 10-11 – Viewpoint Photography VP03 | EN010143/APP/6.3 | 1 | 18 June 2024 | REP1-031 Figure 10-12 – Viewpoint Photography VP04 | EN010143/APP/6.3 | 1 | 18 June 2024 | REP1-032 Figure 10-14 – Viewpoint Photography VP06 | EN010143/APP/6.3 | 1 | 18 June 2024 | REP1-033 Figure 10-15 – Viewpoint Photography VP07 | EN010143/APP/6.3 | 1 | 18 June 2024 | REP1-034 Figure 10-21 – Viewpoint Photography VP12a | EN010143/APP/6.3 | 1 | 18 June 2024 | REP1-035 Figure 10-25 – Viewpoint Photography VP16 | EN010143/APP/6.3 | 1 | 18 June 2024 | REP1-036 Figure 10-27 – Viewpoint Photography VP18 | EN010143/APP/6.3 | 1 | 18 June 2024 | REP1-037 Figure 10-31 – Viewpoint Photography VP22 | EN010143/APP/6.3 | 1 | 18 June 2024 | REP1-038 Figure 10-34 – Viewpoint Photography VP25 | EN010143/APP/6.3 | 1 | 18 June 2024 | REP1-039 Figure 10-35 – Viewpoint Photography VP26 | EN010143/APP/6.3 | 1 | 18 June 2024 | REP1-040 Figure 10-36 – Viewpoint Photography VP27 | EN010143/APP/6.3 | 1 | 18 June 2024 | REP1-041 Figure 10-37 – Viewpoint Photography VP08 | EN010143/APP/6.3 | 1 | 18 June 2024 | REP1-042 Figure 10-42 – Photomontage VP05 | EN010143/APP/6.3 | 1 | 18 June 2024 | REP1-043 Figure 10-45 – Photomontage VP09 | EN010143/APP/6.3 | 1 | 18 June 2024 | REP1-044 Figure 10-46 – Photomontage VP10a | EN010143/APP/6.3 | 1 | 18 June 2024 | REP1-045 Figure 10-53 – Photomontage VP19 | EN010143/APP/6.3 | 1 | 18 June 2024 | REP1-046 Figure 10-54 – Photomontage VP25 | EN010143/APP/6.3 | 1 | 18 June 2024 | REP1-047 Figure 11-1 – Baseline Monitoring and Sensitive Receptor Locations | EN010143/APP/6.3 | 1 | 18 June 2024 | REP1-048 Figure 13-4 – Roads Likely to be Used to Access the Site | EN010143/APP/6.3 | 1 | 18 June 2024 | REP1-049 Figure 16-1 – Dust Risk Assessment Zones | EN010143/APP/6.3 | 1 | 18 June 2024 | REP1-050 Framework construction traffic management plan | EN010143/APP/6.2 | 4 | 03 September 2024 | AS-034 Framework site waste management plan | EN010143/APP/6.2 | 0 | 16 November 2023 | APP-124 Framework surface water drainage strategy | EN010143/APP/6.2 | 1 | 18 June 2024 | REP1-021 PART 3 OTHER DOCUMENTS TO BE CERTIFIED (1) Document name | (2) Document reference | (3) Revision number | (4) Date | (5) Examination Library Reference Book of reference | EN010143/APP/4.3 | 4 | 15 August 2024 | REP4-004 Crown land plans | EN010143/APP/2.2 | 0 | 16 November 2023 | APP-007 Framework construction environmental management plan | EN010143/APP/7.7 | 4 | 15 August 2024 | REP4-010 Framework decommissioning environmental management plan | EN010143/APP/7.9 | 2 | 23 July 2024 | REP3-014 Framework landscape and ecological management plan | EN010143/APP/7.14 | 3 | 23 July 2024 | AS-040 Framework operational environmental management plan | EN010143/APP/7.8 | 3 | 23 July 2024 | AS-036 Framework public rights of way management plan | EN010143/APP/7.13 | 0 | 16 November 2023 | APP-245 Framework skills, supply chain and employment plan | EN010143/APP/7.15 | 0 | 16 November 2023 | APP-247 Framework soil management plan | EN010143/APP/7.10 | 1 | 18 June 2024 | REP1-058 Land plans | EN010143/APP/2.1 | 1 | 19 January 2024 | AS-004 Outline design principles statement | EN010143/APP/7.4 | 1 | 18 June 2024 | REP1-051 Overarching written scheme of investigation for archaeological mitigation | EN010143/APP/8.23 | 1 | 23 July 2024 | REP3-030 Streets, rights of way and access plan | EN010143/APP/2.4 | 3 | 03 September 2024 | AS-027 to AS-028 Traffic regulation measures plan | EN010143/APP/2.5 | 3 | 03 September 2024 | AS-029 to AS-031 Works plan | EN010143/APP/2.3 | 0 | 16 November 2023 | APP-008

Propose a change

SCHEDULE 13 ARBITRATION RULES

Article 42 Commencing an arbitration 1 The arbitration is deemed to have commenced when a party (“the claimant”) serves a written notice of arbitration on the other party (“the respondent”). Time periods 2 (1) All time periods in these arbitration rules are measured in days and include weekends, but not bank or public holidays. (2) Time periods are calculated from the day after the arbitrator is appointed which is either— (a) the date the arbitrator notifies the parties in writing of his/her acceptance of an appointment by agreement of the parties; or (b) the date the arbitrator is appointed by the Secretary of State. Timetable 3 (1) The timetable for the arbitration is that which is set out in sub-paragraphs (2) to (4) below unless amended in accordance with paragraph 5(3). (2) Within 14 days of the arbitrator being appointed, the claimant must provide both the respondent and the arbitrator with— (a) a written statement of claim which describes the nature of the difference between the parties, the legal and factual issues, the claimant’s contentions as to those issues, the amount of its claim or the remedy it is seeking; (b) all statements of evidence and copies of all documents on which it relies, including contractual documentation, correspondence (including electronic documents), legal precedents and expert witness reports. (3) Within 14 days of receipt of the claimant’s statements under sub-paragraph (2) by the arbitrator and respondent, the respondent must provide the claimant and the arbitrator with— (a) a written statement of defence consisting of a response to the claimant’s statement of claim, its statement in respect of the nature of the difference, the legal and factual issues in the claimant’s claim, its acceptance of any elements of the claimant’s claim and its contentions as to those elements of the claimant’s claim it does not accept; (b) all statements of evidence and copies of all documents on which it relies, including contractual documentation, correspondence (including electronic documents), legal precedents and expert witness reports; (c) any objection it wishes to make to the claimant’s statements, comments on the claimant’s expert reports (if submitted by the claimant) and explanations of the objections. (4) Within seven days of the respondent serving its statements under sub-paragraph (3) the claimant may make a statement of reply by providing both the respondent and the arbitrator with— (a) a written statement responding to the respondent’s submissions, including its reply in respect of the nature of the difference, the issues (both factual and legal) and its contentions in relation to the issues; (b) all statements of evidence and copies of documents in response to the respondent’s submissions; (c) any expert report in response to the respondent’s submissions; (d) any objections to the statements of evidence, expert reports or other documents submitted by the respondent; and (e) its written submissions in response to the legal and factual issues involved. Procedure 4 (1) The parties’ pleadings, witness statements and expert reports (if any) must be concise. A single pleading must not exceed 30 single-sided A4 pages using 10pt Arial font. (2) The arbitrator will make an award on the substantive differences based solely on the written material submitted by the parties unless the arbitrator decides that a hearing is necessary to explain or resolve any matters. (3) Either party may, within two days of delivery of the last submission, request a hearing giving specific reasons why it considers a hearing is required. (4) Within seven days of receiving the last submission, the arbitrator must notify the parties whether a hearing is to be held and the length of that hearing. (5) Within ten days of the arbitrator advising the parties that a hearing is to be held, the date and venue for the hearing are to be fixed by agreement with the parties, save that if there is no agreement the arbitrator must direct a date and venue which the arbitrator considers is fair and reasonable in all the circumstances. The date for the hearing must not be less than 35 days from the date of the arbitrator’s direction confirming the date and venue of the hearing. (6) A decision must be made by the arbitrator on whether there is any need for expert evidence to be submitted orally at the hearing. If oral expert evidence is required by the arbitrator, then any experts attending the hearing may be asked questions by the arbitrator. (7) There is to be no examination or cross examination of experts, but the arbitrator must invite the parties to ask questions of the experts by way of clarification of any answers given by the experts in response to the arbitrator’s questions. Prior to the hearing in relation to the experts— (a) at least 28 days before a hearing, the arbitrator must provide a list of issues to be addressed by the experts; (b) if more than one expert is called, they will jointly confer and produce a joint report or reports within 14 days of the issues being provided; and (c) the form and content of a joint report must be as directed by the arbitrator and must be provided at least seven days before the hearing. (8) Within 14 days of a hearing or a decision by the arbitrator that no hearing is to be held the parties may by way of exchange provide the arbitrator with a final submission in connection with the matters in dispute and any submissions on costs. The arbitrator must take these submissions into account in the award. (9) The arbitrator may make other directions or rulings as considered appropriate in order to ensure that the parties comply with the timetable and procedures to achieve an award on the substantive difference within four months of the date on which the arbitrator is appointed, unless both parties otherwise agree to an extension to the date for the award. (10) If a party fails to comply with the timetable, procedure or any other direction then the arbitrator may continue in the absence of a party or submission or document, and may make a decision on the information before the arbitrator attaching the appropriate weight to any evidence submitted beyond any timetable or in breach of any procedure or direction. (11) The arbitrator’s award must include reasons. The parties must accept that the extent to which reasons are given must be proportionate to the issues in dispute and the time available to the arbitrator to deliver the award. Arbitrator’s powers 5 (1) The arbitrator has all the powers of the Arbitration Act 1996, save where modified in this Schedule. (2) There must be no discovery or disclosure, except that the arbitrator is to have the power to order the parties to produce such documents as are reasonably requested by another party no later than the statement of reply, or by the arbitrator, where the documents are manifestly relevant, specifically identified and the burden of production is not excessive. Any application and orders should be made by way of a Redfern Schedule without any hearing. (3) Any time limits fixed in accordance with this procedure or by the arbitrator may be varied by agreement between the parties, subject to any such variation being acceptable to and approved by the arbitrator. In the absence of agreement, the arbitrator may vary the timescales or procedure— (a) if the arbitrator is satisfied that a variation of any fixed time limit is reasonably necessary to avoid a breach of the rules of natural justice and then; (b) only for such a period that is necessary to achieve fairness between the parties. (4) On the date the award is made, the arbitrator will notify the parties that the award is completed, signed and dated, and that it will be issued to the parties on receipt of cleared funds for the arbitrator’s fees and expenses. Costs 6 (1) The costs of the arbitration must include the fees and expenses of the arbitrator, the reasonable fees and expenses of any experts and the reasonable legal and other costs incurred by the parties for the arbitration. (2) Where the difference involves connected or interrelated issues, the arbitrator must consider the relevant costs collectively. (3) The final award must fix the costs of the arbitration and decide which of the parties are to bear them or in what proportion they are to be borne by the parties. (4) The arbitrator must award recoverable costs on the general principle that each party should bear its own costs, having regard to all material circumstances, including such matters as exaggerated claims or defences, the degree of success for different elements of the claims, claims that have incurred substantial costs, the conduct of the parties and the degree of success of a party. Confidentiality 7 (1) Subject to sub-paragraphs (2) and (3), any arbitration hearing and documentation will be open to and accessible by the public. (2) The arbitrator may direct that the whole or part of a hearing is to be private or any documentation to be confidential where it is necessary in order to protect commercially sensitive information. (3) Nothing in this paragraph will prevent any disclosure of a document by a party pursuant to an order of a court in England and Wales or where disclosure is required under any enactment.

Propose a change

SCHEDULE 14 PROTECTIVE PROVISIONS

Article 43 PART 1 FOR THE PROTECTION OF ELECTRICITY, GAS, WATER AND SEWERAGE UNDERTAKERS 1 For the protection of the utility undertakers referred to in this Part of this Schedule (save for any utility undertakers which are specifically protected by any other Part of this Schedule, which will take precedence), the following provisions have effect, unless otherwise agreed in writing between the undertaker and the utility undertakers concerned. 2 In this Part of this Schedule— “alternative apparatus” means alternative apparatus adequate to enable the utility undertaker in question to fulfil its statutory functions in a manner not less efficient than previously; “apparatus” means— in the case of an electricity undertaker, electric lines or electrical plant (as defined in the Electricity Act 1989), belonging to or maintained by that utility undertaker; in the case of a gas undertaker, any mains, pipes or other apparatus belonging to or maintained by a gas transporter for the purposes of gas supply; in the case of a water undertaker— mains, pipes or other apparatus belonging to or maintained by that utility undertaker for the purposes of water supply; and any water mains or service pipes (or part of a water main or service pipe) that is the subject of an agreement to adopt made under section 51A of the Water Industry Act 1991; in the case of a sewerage undertaker— any drain or works vested in the utility undertaker under the Water Industry Act 1991; and any sewer which is so vested or is the subject of a notice of intention to adopt given under section 102(4) of that Act or an agreement to adopt made under section 104 of that Act , and includes a sludge main, disposal main (within the meaning of section 219 of that Act) or sewer outfall and any manholes, ventilating shafts, pumps or other accessories forming part of any such sewer, drain or works, and includes any structure in which apparatus is or is to be lodged or which gives or will give access to apparatus; and any other mains, pipelines or cables that are not the subject of the protective provisions in Parts 2 to 6 of this Schedule; “functions” includes powers and duties; “in”, in a context referring to apparatus or alternative apparatus in land, includes a reference to apparatus or alternative apparatus under, over or upon land; and “utility undertaker” means— any licence holder within the meaning of Part 1 of the Electricity Act 1989; a gas transporter within the meaning of Part 1 of the Gas Act 1986; water undertaker within the meaning of the Water Industry Act 1991; a sewerage undertaker within the meaning of Part 1 of the Water Industry Act 1991; and an owner or operator of apparatus within paragraph (e) of the definition of that term, for the area of the authorised development, and in relation to any apparatus, means the utility undertaker to whom it belongs or by whom it is maintained. 3 This Part of this Schedule does not apply to apparatus in respect of which the relations between the undertaker and the utility undertaker are regulated by the provisions of Part 3 of the 1991 Act. 4 Regardless of the temporary prohibition or restriction of use of streets under the powers conferred by article 11 (temporary closure of streets and public rights of way), a utility undertaker is at liberty at all times to take all necessary access across any such street and to execute and do all such works and things in, upon or under any such street as may be reasonably necessary or desirable to enable it to maintain any apparatus which at the time of the prohibition or restriction was in that street. 5 Regardless of any provision in this Order or anything shown on the land plans, the undertaker must not acquire any apparatus otherwise than by agreement. 6 (1) If, in the exercise of the powers conferred by this Order, the undertaker acquires any interest in any land in which any apparatus is placed or over which access to any apparatus is enjoyed or requires that the utility undertaker’s apparatus is relocated or diverted, that apparatus must not be removed under this Part of this Schedule, and any right of a utility undertaker to maintain that apparatus in that land and to gain access to it must not be extinguished, until alternative apparatus has been constructed and is in operation, and access to it has been provided, to the reasonable satisfaction of the utility undertaker in question in accordance with sub-paragraphs (2) to (7). (2) If, for the purpose of executing any works in, on or under any land purchased, held, appropriated or used under this Order, the undertaker requires the removal of any apparatus placed in that land, the undertaker must give to the utility undertaker in question written notice of that requirement, together with a plan and section of the work proposed, and of the proposed position of the alternative apparatus to be provided or constructed and in that case (or if in consequence of the exercise of any of the powers conferred by this Order a utility undertaker reasonably needs to remove any of its apparatus) the undertaker must, subject to sub-paragraph (3), afford to the utility undertaker the necessary facilities and rights for the construction of alternative apparatus in other land of the undertaker and subsequently for the maintenance of that apparatus. (3) If alternative apparatus or any part of such apparatus is to be constructed elsewhere than in other land of the undertaker, or the undertaker is unable to afford such facilities and rights as are mentioned in sub-paragraph (2), in the land in which the alternative apparatus or part of such apparatus is to be constructed, the utility undertaker in question must, on receipt of a written notice to that effect from the undertaker, as soon as reasonably possible use reasonable endeavours to obtain the necessary facilities and rights in the land in which the alternative apparatus is to be constructed. (4) Any alternative apparatus to be constructed in land of the undertaker under this Part of this Schedule must be constructed in such manner and in such line or situation as may be agreed between the utility undertaker in question and the undertaker or in default of agreement settled by arbitration in accordance with article 42 (arbitration). (5) The utility undertaker in question must, after the alternative apparatus to be provided or constructed has been agreed or settled by arbitration in accordance with article 42 (arbitration), and after the grant to the utility undertaker of any such facilities and rights as are referred to in sub-paragraph (2) or (3), proceed without unnecessary delay to construct and bring into operation the alternative apparatus and subsequently to remove any apparatus required by the undertaker to be removed under the provisions of this Part of this Schedule. (6) Regardless of anything in sub-paragraph (5), if the undertaker gives notice in writing to the utility undertaker in question that it desires itself to execute any work, or part of any work, in connection with the construction or removal of apparatus in any land controlled by the undertaker, that work, instead of being executed by the utility undertaker, must be executed by the undertaker without unnecessary delay under the superintendence, if given, and to the reasonable satisfaction of the utility undertaker. (7) Nothing in sub-paragraph (6) authorises the undertaker to execute the placing, installation, bedding, packing, removal, connection or disconnection of any apparatus, or execute any filling around the apparatus (where the apparatus is laid in a trench) within 300 millimetres of the apparatus. 7 (1) Where, in accordance with the provisions of this Part of this Schedule, the undertaker affords to a utility undertaker facilities and rights for the construction and maintenance in land of the undertaker of alternative apparatus in substitution for apparatus to be removed, those facilities and rights must be granted upon such terms and conditions as may be agreed between the undertaker and the utility undertaker in question or in default of agreement settled by arbitration in accordance with article 42 (arbitration). (2) If the facilities and rights to be afforded by the undertaker in respect of any alternative apparatus, and the terms and conditions subject to which those facilities and rights are to be granted, are in the opinion of the arbitrator less favourable on the whole to the utility undertaker in question than the facilities and rights enjoyed by it in respect of the apparatus to be removed and the terms and conditions to which those facilities and rights are subject, the arbitrator must make such provision for the payment of compensation by the undertaker to that utility undertaker as appears to the arbitrator to be reasonable having regard to all the circumstances of the particular case. 8 (1) Not less than 28 days before starting the execution of any works in, on or under any land purchased, held, appropriated or used under this Order that are near to, or will or may affect, any apparatus the removal of which has not been required by the undertaker under paragraph 6(2), the undertaker must submit to the utility undertaker in question a plan, section and description of the works to be executed. (2) Those works must be executed only in accordance with the plan, section and description submitted under sub-paragraph (1) and in accordance with such reasonable requirements as may be made in accordance with sub-paragraph (3) by the utility undertaker for the alteration or otherwise for the protection of the apparatus, or for securing access to it, and the utility undertaker is entitled to watch and inspect the execution of those works. (3) Any requirements made by a utility undertaker under sub-paragraph (2) must be made within a period of 21 days beginning with the date on which a plan, section and description under sub-paragraph (1) are submitted to it. (4) If a utility undertaker in accordance with sub-paragraph (3) and in consequence of the works proposed by the undertaker, reasonably requires the removal of any apparatus and gives written notice to the undertaker of that requirement, paragraphs 1 to 7 apply as if the removal of the apparatus had been required by the undertaker under paragraph 6(2). (5) Nothing in this paragraph precludes the undertaker from submitting at any time or from time to time, but in no case less than 28 days before commencing the execution of any works, a new plan, section and description instead of the plan, section and description previously submitted, and having done so the provisions of this paragraph apply to and in respect of the new plan, section and description. (6) The undertaker is not required to comply with sub-paragraph (1) in a case of emergency but in that case it must give to the utility undertaker in question notice as soon as is reasonably practicable and a plan, section and description of those works as soon as reasonably practicable subsequently and must comply with sub-paragraph (2) in so far as is reasonably practicable in the circumstances. 9 (1) Subject to the following provisions of this paragraph, the undertaker must repay to a utility undertaker the reasonable expenses incurred by that utility undertaker in, or in connection with, the inspection, removal, alteration or protection of any apparatus or the construction of any new apparatus which may be required in consequence of the execution of any such works as are referred to in paragraph 6(2). (2) There is to be deducted from any sum payable under sub-paragraph (1) the value of any apparatus removed under the provisions of this Part of this Schedule, that value being calculated after removal. (3) If in accordance with the provisions of this Part of this Schedule— (a) apparatus of better type, of greater capacity or of greater dimensions is placed in substitution for existing apparatus of worse type, of smaller capacity or of smaller dimensions; or (b) apparatus (whether existing apparatus or apparatus substituted for existing apparatus) is placed at a depth greater than the depth at which the existing apparatus was, and the placing of apparatus of that type or capacity or of those dimensions or the placing of apparatus at that depth, as the case may be, is not agreed by the undertaker or, in default of agreement, is not determined by arbitration in accordance with article 42 (arbitration) to be necessary, then, if such placing involves cost in the construction of works under this Part of this Schedule exceeding that which would have been involved if the apparatus placed had been of the existing type, capacity or dimensions, or at the existing depth, as the case may be, the amount which apart from this sub-paragraph would be payable to the utility undertaker in question by virtue of sub-paragraph (1) is to be reduced by the amount of that excess. (4) For the purposes of sub-paragraph (3)— (a) an extension of apparatus to a length greater than the length of existing apparatus is not to be treated as a placing of apparatus of greater dimensions than those of the existing apparatus where such extension is required in consequence of the execution of any such works as are referred to in paragraph 6(2); and (b) where the provision of a joint in a cable is agreed, or is determined to be necessary, the consequential provision of a jointing chamber or of a manhole is to be treated as if it also had been agreed or had been so determined. (5) An amount which apart from this sub-paragraph would be payable to a utility undertaker in respect of works by virtue of sub-paragraph (1), if the works include the placing of apparatus provided in substitution for apparatus placed more than 7 years and 6 months earlier so as to confer on the utility undertaker any financial benefit by deferment of the time for renewal of the apparatus in the ordinary course is to be reduced by the amount which represents that benefit. 10 (1) Subject to sub-paragraphs (2) and (3), if by reason or in consequence of the construction of any of the works referred to in paragraph 6(2), any damage is caused to any apparatus (other than apparatus the repair of which is not reasonably necessary in view of its intended removal for the purposes of those works) or property of a utility undertaker, or there is any interruption in any service provided, or in the supply of any goods, by any utility undertaker, the undertaker must— (a) bear and pay the cost reasonably incurred by that utility undertaker in making good such damage or restoring the supply; and (b) make reasonable compensation to that utility undertaker for any other expenses, loss, damages, penalty or costs incurred by the utility undertaker, by reason or in consequence of any such damage or interruption. (2) Nothing in sub-paragraph (1) imposes any liability on the undertaker with respect to any damage or interruption to the extent that it is attributable to the act, neglect or default of a utility undertaker, its officers, servants, contractors or agents. (3) A utility undertaker must give the undertaker reasonable notice of any such claim or demand and no settlement or compromise is to be made without the consent of the undertaker which, if it withholds such consent, has the sole conduct of any settlement or compromise or of any proceedings necessary to resist the claim or demand. 11 Nothing in this Part of this Schedule affects the provisions of any enactment or agreement regulating the relations between the undertaker and a utility undertaking in respect of any apparatus laid or erected in land belonging to the undertaker on the date on which this Order is made. PART 2 FOR THE PROTECTION OF OPERATORS OF ELECTRONIC COMMUNICATIONS CODE NETWORKS 12 (1) For the protection of any operator, the following provisions have effect, unless otherwise agreed in writing between the undertaker and the operator. 13 In this Part of this Schedule— “the 2003 Act” means the Communications Act 2003; “electronic communications apparatus” has the same meaning as in the electronic communications code; “the electronic communications code” has the same meaning as in section 106 (application of the electronic communications code) of the 2003 Act; “electronic communications code network” means— so much of an electronic communications network or conduit system provided by an electronic communications code operator as is not excluded from the application of the electronic communications code by a direction under section 106 of the 2003 Act; and an electronic communications network which the Secretary of State is providing or proposing to provide; “electronic communications code operator” means a person in whose case the electronic communications code is applied by a direction under section 106 of the 2003 Act; and “operator” means the operator of an electronic communications code network. 14 The exercise of the powers of article 31 (statutory undertakers) is subject to Part 10 (undertakers’ works affecting electronic communications apparatus) of the electronic communications code. 15 (1) Subject to sub-paragraphs (2) to (4), if as the result of the authorised development or its construction, or of any subsidence resulting from any of those works— (a) any damage is caused to any electronic communications apparatus belonging to an operator (other than apparatus the repair of which is not reasonably necessary in view of its intended removal for the purposes of those works), or other property of an operator; or (b) there is any interruption in the supply of the service provided by an operator, the undertaker must bear and pay the cost reasonably incurred by the operator in making good such damage or restoring the supply and make reasonable compensation to that operator for any other expenses, loss, damages, penalty or costs incurred by it, by reason, or in consequence of, any such damage or interruption, (2) Nothing in sub-paragraph (1) imposes any liability on the undertaker with respect to any damage or interruption to the extent that it is attributable to the act, neglect or default of an operator, its officers, servants, contractors or agents. (3) The operator must give the undertaker reasonable notice of any such claim or demand and no settlement or compromise of the claim or demand is to be made without the consent of the undertaker which, if it withholds such consent, has the sole conduct of any settlement or compromise or of any proceedings necessary to resist the claim or demand. (4) Any difference arising between the undertaker and the operator under this Part of this Schedule must be referred to and settled by arbitration under article 42 (arbitration). 16 This Part of this Schedule does not apply to— (a) any apparatus in respect of which the relations between the undertaker and an operator are regulated by the provisions of Part 3 (street works in England and Wales) of the 1991 Act; or (b) any damage, or any interruption, caused by electro-magnetic interference arising from the construction or use of the authorised development. 17 Nothing in this Part of this Schedule affects the provisions of any enactment or agreement regulating the relations between the undertaker and an operator in respect of any apparatus laid or erected in land belonging to the undertaker on the date on which this Order is made. PART 3 FOR THE PROTECTION OF DRAINAGE AUTHORITIES 18 The provisions of this Part of this Schedule have effect for the protection of the drainage authority unless otherwise agreed in writing between the undertaker and the drainage authority. 19 In this Part of this Schedule— “authorised development” has the same meaning as in article 2(1) (interpretation) of this Order and (unless otherwise specified) for the purposes of this Part of this Schedule includes the operation and maintenance of the authorised development and the construction of any works authorised by this Part of this Schedule; “construction” includes execution, placing, altering, replacing, relaying and removal, and “construct” and “constructed” must be construed accordingly; “drainage authority” means in relation to an ordinary watercourse— the drainage board concerned within the meaning of section 23 (prohibition on obstructions etc. in watercourses) of the Land Drainage Act 1991; or in the case of any area for which there is no such drainage board, the lead local flood authority within the meaning of section 6 (other definitions) of the Flood and Water Management Act 2010; “drainage work” means any ordinary watercourse and includes any bank, wall, embankment or other structure, or any appliance constructed for land drainage or flood defence which is the responsibility of the drainage authority; “ordinary watercourse” has the meaning given by section 72 (interpretation) of the Land Drainage Act 1991; “plans” includes sections, drawings, specifications and method statements; and “specified work” means so much of the authorised development as is in, on, under, over or within 8 metres (or 9 metres in the case of any drainage work under the control of the Ouse and Derwent Internal Drainage Board) of a drainage work or is otherwise likely to affect the flow of water in any watercourse. 20 (1) Before commencing construction of a specified work, the undertaker must submit to the drainage authority plans of the specified work (such plans to include any proposals for access for maintenance to the drainage work) and such further particulars available to it as the drainage authority may reasonably require within 14 days of the submission of the plans. (2) A specified work must not be constructed except in accordance with such plans as may be approved in writing by the drainage authority or determined under paragraph 26. (3) Any approval of the drainage authority required under this paragraph— (a) must not be unreasonably withheld or delayed; (b) is deemed to have been given if it is neither given nor refused within 28 days of the submission of the plans for approval, or submission of further particulars (where required by the drainage authority under sub-paragraph (1)) whichever is the later; and (c) may be given subject to such reasonable requirements as the drainage authority may make for the protection of any drainage work taking into account the terms of this Order. (4) Any refusal under this paragraph must be accompanied by a statement of the reasons for refusal. 21 Without limiting the scope of paragraph 20, the requirements which the drainage authority may make under that paragraph include conditions requiring the undertaker at its own expense to construct such protective works, whether temporary or permanent, during the construction of the specified work (including the provision of flood banks, walls or embankments or other new works and the strengthening, repair or renewal of existing banks, walls or embankments) as are reasonably necessary taking account of the terms of this Order— (a) to safeguard any drainage work against damage by reason of any specified work; or (b) to secure that the efficiency of any drainage work for flood defence and land drainage purposes is not impaired, and that the risk of flooding is not otherwise increased beyond the level of flood risk that was assessed in the environmental statement, by reason of any specified work. 22 (1) Subject to sub-paragraph (2), any specified work, and all protective works required by the drainage authority under paragraph 21, must be constructed— (a) without unreasonable delay in accordance with the plans approved or deemed to have been approved or settled under this Part of this Schedule; and (b) to the reasonable satisfaction of the drainage authority, and an officer of the drainage authority is entitled to watch and inspect the construction of such works. (2) The undertaker must give to the drainage authority— (a) not less than 14 days’ notice in writing of its intention to commence construction of any specified work; and (b) notice in writing of its completion not later than seven days after the date on which it is brought into use. 23 If by reason of the construction of a specified work or of the failure of any a specified work the efficiency of any drainage work for flood defence purposes or land drainage is impaired, or that drainage work is otherwise damaged, the impairment or damage must be made good by the undertaker as soon as reasonably practicable to the reasonable satisfaction of the drainage authority and, if the undertaker fails to do so, the drainage authority may make good the impairment or damage and recover from the undertaker the expense reasonably incurred by it in doing so. 24 The undertaker must make reasonable compensation for costs, charges and expenses which the drainage authority may reasonably incur— (a) in the examination or approval of plans under this Part of this Schedule; (b) in inspecting the construction of the specified work or any protective works required by the drainage authority under this Part of this Schedule; and (c) in carrying out any surveys or tests by the drainage authority which are reasonably required in connection with the construction of the specified work. 25 (1) The undertaker must make reasonable compensation for liabilities, costs and losses which may be reasonably incurred or suffered by reason of— (a) the construction of any specified works comprised within the authorised development; or (b) any act or omission of the undertaker, its employees, contractors or agents or others while engaged upon the construction of the authorised development. (2) The drainage authority must give to the undertaker reasonable notice of any such claim or demand. (3) The undertaker may at its own expense conduct all negotiations for the settlement of the same and any litigation that may arise therefrom. (4) The drainage authority must not compromise or settle any such claim or make any admission which might be prejudicial to the claim without the agreement of the undertaker which agreement must not be unreasonably withheld or delayed. (5) The drainage authority will, having regard to its statutory functions, at all times take reasonable steps to prevent and mitigate any such claims, demands, proceedings, costs, damages, expenses or loss. (6) The drainage authority will, at the request of the undertaker and having regard to its statutory functions, afford all reasonable assistance for the purpose of contesting any such claim or action, and is entitled to be repaid its reasonable expenses reasonably incurred in so doing . (7) The fact that any work or thing has been executed or done by the undertaker in accordance with a plan approved or deemed to be approved by the drainage authority, or to its satisfaction, or in accordance with any directions or award of an arbitrator, does not relieve the undertaker from any liability under this Part of this Schedule. (8) Nothing in sub-paragraph (1) imposes any liability on the undertaker with respect to any damage to the extent that it is attributable to the act, neglect or default of the drainage authority or the breach of a statutory duty of the drainage authority, its officers, servants, contractors or agents. 26 Any dispute arising between the undertaker and the drainage authority under this Part of this Schedule, if the parties agree, is to be determined by arbitration under article 42. (arbitration). PART 4 FOR THE PROTECTION OF THE CANAL & RIVER TRUST Interpretation 27 (1) For the protection of the Canal & River Trust the following provisions of this Part of this Schedule have effect, unless otherwise agreed in writing between the undertaker and the Canal & River Trust. (2) In this Part of this Schedule— “Code of Practice” means the Code of Practice for Works Affecting the Canal & River Trust (April 2023) or any updates or amendments thereto; “construction”, in relation to any specified work or protective work, includes— the execution and placing of that work; and any relaying, renewal, or maintenance of that work; and “construct” and “constructed” have corresponding meanings; “Canal & River Trust’s network” means the Canal & River Trust’s network of waterways; “detriment” means any damage to the waterway or any other property of the Canal & River Trust caused by the presence of the authorised development and, without prejudice to the generality of that meaning, includes— any obstruction of, or interference with, or hindrance or danger to, navigation or to any use of the waterway (including towing paths); the erosion of the bed or banks of the waterway, or the impairment of the stability of any works, lands or premises forming part of the waterway; the deposit of materials or the siltation of the waterway so as to damage the waterway; the pollution of the waterway; any significant alteration in the water level of the waterway, or significant interference with the supply of water thereto, or drainage of water therefrom; any harm to the ecology of the waterway; and any interference with the exercise by any person of any lawful rights over Canal & River Trust’s network; “the engineer” means an engineer appointed by the Canal & River Trust for the purpose in question; “plans” includes navigational risk assessments, sections, designs, drawings, specifications, soil reports, calculations, descriptions (including descriptions of methods of construction) and programmes; “practical completion” means practical completion of all of the specified work notwithstanding that items which would ordinarily be considered snagging items remain outstanding, and the expression “practically complete” and “practically completed” is to be construed accordingly; “protective work” means a work constructed under paragraph 31 below (approval of plans etc.), sub-paragraph 31(4)(a); “specified work” means so much of the authorised development as is, may be, or takes place in, on, under or over the surface of land below the water level forming part of the waterway; or may affect the waterway or any function of the Trust, including any projection over the waterway by any authorised work or any plant or machinery; and “the waterway” means each and every part of the River Ouse within the order limits and includes any works, lands or premises belonging to the Canal & River Trust, or under its management or control, and held or used by the Canal & River Trust in connection with its statutory functions. (3) Where the Code of Practice applies to any works or matter that are part of the authorised development or that form part of the protective works and there is an inconsistency between these protective provisions and the Code of Practice, the part of the Code of Practice that is inconsistent with these protective provisions will not apply and these protective provisions will apply. The undertaker will identify and agree with the Canal & River Trust those parts of the Code of Practice which are not applicable to the construction of the specified works and for the avoidance of doubt the undertaker will not be required to comply with those agreed parts of the Code of Practice. Powers requiring the Canal & River Trust’s consent 28 (1) The undertaker must not in the exercise of the powers conferred by this Order obstruct or interfere with pedestrian or vehicular access to the waterway unless such obstruction or interference with such access is with the consent of the Canal & River Trust. (2) The undertaker must not exercise any power conferred by this Order to discharge water into the waterway under article 16 (discharge of water) or in any way interfere with the supply of water to or the drainage of water from the waterway unless such exercise is with the consent of the Canal & River Trust, save as to surface water discharge which will not require the consent of the Canal & River Trust. (3) The undertaker must not exercise the powers conferred by article 19 (authority to survey and investigate the land) or section 11(3) of the 1965 Act, in relation to the waterway unless such exercise is with the consent of the Canal & River Trust. (4) The undertaker must not exercise any power conferred by article 29 (temporary use of land for constructing the authorised development) or article 30 (temporary use of land for maintaining the authorised development) in respect of the waterway unless such exercise is with the consent of the Canal & River Trust. (5) The undertaker must not exercise any power conferred by article 20 (compulsory acquisition of land), article 22 (compulsory acquisition of rights), 25 (acquisition of subsoil) or 31 (statutory undertakers) in respect of the Canal & River Trust’s interests in the waterway unless such exercise is with the consent of the Canal & River Trust. (6) The consent of the Canal & River Trust pursuant to sub-paragraphs (1) to (5) must not be unreasonably withheld or delayed but may be given subject to reasonable terms and conditions provided that it will not be reasonable for the Canal & River Trust to withhold or delay consent or impose terms and conditions that would prevent the undertaker from complying with the protective provisions in this Part of this Schedule or any condition contained in Schedule 2 (requirements) to this Order. Fencing 29 Where so required by the engineer acting reasonably the undertaker must, to the reasonable satisfaction of the engineer, fence off a specified work or a protective work or take such other steps as the engineer may require to be taken for the purpose of separating a specified work or a protective work from the waterway, whether on a temporary or permanent basis or both. Survey of waterway 30 (1) Before the commencement of the initial construction of any part of the specified works and again following practical completion of the specified works the undertaker must bear the reasonable and proper cost of the carrying out by a qualified engineer (the “surveyor”), to be approved by the Canal & River Trust and the undertaker, of a survey to measure the navigational depth of the waterway and profile of the riverbed (“the survey”) of so much of the waterway and of any land which may provide support for the waterway as will or may be affected by the specified works. (2) The design of, and methods proposed to be used for, the survey, to be approved by the Canal & River Trust and the undertaker. (3) For the purposes of the survey the undertaker must— (a) on being given reasonable notice (save in case of emergency, when immediate access must be afforded) afford reasonable facilities to the surveyor for access to the site of the specified works and to any land of the undertaker which may provide support for the waterway as will or may be affected by the specified works; and (b) supply the surveyor as soon as reasonably practicable with all such information as they may reasonably require and which the undertaker holds with regard to the specified works or the method of their construction. (4) Copies of the survey results must be provided to both the Canal & River Trust and the undertaker at no cost to the Canal & River Trust. Approval of plans, protective works etc 31 (1) The undertaker must before commencing construction of any specified work including any temporary works supply to the Canal & River Trust proper and sufficient plans of that work, on the Canal & River Trust forms, having regard to the Canal & River Trust’s Code of Practice and such further particulars available to it as the Canal & River Trust may within 14 working days of the submission of the plans reasonably require for the approval of the engineer and must not commence such construction of a specified work until plans of that work have been approved in writing by the engineer or settled by arbitration. (2) The approval of the engineer under sub-paragraph (1) must not be unreasonably withheld or delayed, and if within 25 working days after such plans (including any other particulars reasonably required under sub-paragraph (1)) have been received by the Canal & River Trust the engineer has not intimated his disapproval of those plans and the grounds of his disapproval he is deemed to have approved the plans as submitted. (3) An approval of the engineer under this paragraph 31 is not deemed to have been unreasonably withheld if approval within the time limited by sub-paragraph (2) has not been given pending the outcome of any consultation on the approval in question that the Canal & River Trust is obliged to carry out in the proper exercise of its functions, provided prior written notice of such consultation has been provided by the Canal & River Trust to the undertaker. (4) When signifying approval of the plans the engineer may specify on land held or controlled by the Canal & River Trust or the undertaker and subject to such works being authorised by this Order or being development permitted by an Act of Parliament or general development order made under the 1990 Act— (a) any protective work (whether temporary or permanent) which in the reasonable opinion of the engineer should be carried out before the commencement of a specified work to prevent detriment; and (b) such other requirements as may be reasonably necessary to prevent detriment; and such protective works must be constructed by the undertaker or by the Canal & River Trust at the undertaker’s request with all reasonable dispatch and the undertaker must not commence the construction of a specified work until the engineer has notified the undertaker that the protective works have been completed to the engineer’s reasonable satisfaction such consent not to be unreasonably withheld or delayed. (5) The withholding of an approval of the engineer under this paragraph 31 will be deemed to be unreasonable if it would prevent the undertaker from complying with any condition contained in Schedule 2 (Requirements) to this Order. (6) The undertaker must pay to the Canal & River Trust a capitalised sum representing any reasonably increased and additional cost of maintaining and, when necessary, renewing any works, including any permanent protective works provided under sub-paragraph (4) above, and of carrying out any additional dredging of the waterway reasonably necessitated by the exercise of any of the powers under this Order but if the cost of maintaining the waterway, or of works of renewal of the waterway, is reduced in consequence of any such works, a capitalised sum representing such reasonable saving is to be set off against any sum payable by the undertaker to the Canal & River Trust under this paragraph. (7) In the event that the undertaker fails to complete the construction of, or part of, the specified works the Canal & River Trust may, if it is reasonably required in order to avoid detriment, serve on the undertaker a notice in writing requesting that construction be completed. Any notice served under this sub-paragraph must state the works that are to be completed by the undertaker and lay out a reasonable timetable for the works’ completion. If the undertaker fails to comply with this notice within 35 working days, the Canal & River Trust may construct any of the specified works, or part of such works, (together with any adjoining works) in order to complete the construction of, or part of, the specified works or make such works and the undertaker must reimburse the Canal & River Trust all costs, fees, charges and expenses it has reasonably incurred in carrying out such works. Design of works 32 (1) Without prejudice to its obligations under the foregoing provisions of this Part of this Schedule the undertaker must consult, collaborate and respond constructively to any reasonable approach, suggestion, proposal or initiative made by the Canal & River Trust on— (a) the design of the specified works; (b) the environmental effects of those works; and must have regard to such views as may be expressed by the Canal & River Trust in response to such consultation pursuant in particular to the requirements imposed on the Canal & River Trust by section 22 (general environmental and recreational duties) of the British Waterways Act 1995 and to the interest of the Canal & River Trust in preserving and enhancing the environment of its waterways; and (c) amendments or alterations to the construction environmental management plan, landscape and ecological management plan, operational environmental management plan, decommissioning environmental management plan (as may be approved pursuant to Schedule 2) in respect of a specified work or a protective work or otherwise in connection with the waterway. Notice of works 33 The undertaker must give to the engineer 30 days’ notice of its intention to commence the construction of any of the specified works or protective works, or, in the case of repair carried out in an emergency, such notice as may be reasonably practicable so that, in particular, the Canal & River Trust may where appropriate arrange for the publication of notices bringing those works to the attention of users of the Canal & River Trust’s network. Construction of specified works 34 (1) Any specified works or protective works must, when commenced, be constructed— (a) with all reasonable dispatch in accordance with the plans approved or deemed to have been approved or settled as aforesaid and with any specifications made under paragraph 31 (approval of plans etc) and paragraph 32 (design of works) of this Part; (b) under the supervision (if given) and to the reasonable satisfaction of the engineer; (c) in such manner as to cause as little detriment to the waterway as is reasonably practicable; (d) in such manner as to cause as little inconvenience as is reasonably practicable to the Canal & River Trust, its officers and agents and all other persons lawfully using the waterways, except to the extent that temporary obstruction has otherwise been agreed by the Canal & River Trust; (e) in such a manner as to ensure that no materials are discharged or deposited into the waterway otherwise than in accordance with article 16 (discharge of water); and (f) in compliance with the Code of Practice (where appropriate and where consistent with the exercise of powers pursuant to this Order and for the timely, safe, economic and efficient delivery of the authorised works); (2) Nothing in this Order authorises the undertaker to make or maintain any permanent works in or over the waterway so as to impede or prevent (whether by reducing the width of the waterway or otherwise) the passage of any vessel which is of a kind (as to its dimensions) for which the Canal & River Trust is required by section 105(1)(b) and (2) of the Transport Act 1968 to maintain the waterway. (3) Following the completion of the construction of the specified works the undertaker must restore the waterway to a condition no less satisfactory than its condition immediately prior to the commencement of those works unless otherwise agreed between the undertaker and the Canal & River Trust and save to the extent that any deterioration to the condition of the waterway is not caused by the construction of the specified works. (4) In assessing whether the condition of the waterway is no less satisfactory than immediately prior to the works pursuant to sub-paragraph (3), the Canal & River Trust and the undertaker must take account of any survey issued pursuant to paragraph 30 (survey of waterway) and any other information agreed between them pursuant to this Part. Prevention of pollution 35 The undertaker must not in the course of constructing a specified work or a protective work or otherwise in connection therewith do or permit anything which may result in the pollution of the waterway or the deposit of materials therein (unless otherwise permitted by the Order or the protective provisions in this Part of this Schedule) and must take such steps as the engineer may reasonably require to avoid or make good any breach of its obligations under this paragraph. Access to work – provision of information 36 (1) The undertaker on being given reasonable notice must— (a) at all reasonable times allow reasonable facilities to the engineer for access to a specified work during its construction; and (b) supply the engineer with all such information as the engineer may reasonably require with regard to a specified work or the method of constructing it. (2) The Canal & River Trust on being given reasonable notice must— (a) at all reasonable times afford reasonable facilities to the undertaker and its agents for access to any works carried out by the Canal & River Trust under this Part during their construction; and (b) supply the undertaker with such information as it may reasonably require with regard to such works or the method of constructing them and the undertaker must reimburse the Canal & River Trust’s reasonable costs in relation to the supply of such information. Alterations to the waterway 37 (1) If during the construction of a specified work or a protective work or during a period of twenty four (24) months after the completion of those works any alterations or additions, either permanent or temporary, to the waterway are reasonably necessary in consequence of the construction of the specified work or the protective work in order to avoid detriment, and the Canal & River Trust gives to the undertaker reasonable notice of its intention to carry out such alterations or additions (which must be specified in the notice), the undertaker must pay to the Canal & River Trust the reasonable costs of those alterations or additions including, in respect of any such alterations or additions as are to be permanent, a capitalised sum representing the increase of the costs which may be expected to be reasonably incurred by the Canal & River Trust in maintaining, working and, when necessary, renewing any such alterations or additions. (2) If the cost of maintaining, working or renewing the waterway is reduced in consequence of any such alterations or additions a capitalised sum representing such saving is to be set off against any sum payable by the undertaker to the Canal & River Trust under this paragraph. Repayment of the Canal & River Trust’s fees, etc. 38 (1) The undertaker must repay to the Canal & River Trust in accordance with the Code of Practice all fees, costs, charges and expenses reasonably incurred by the Canal & River Trust— (a) in constructing any protective works under the provisions of paragraph 31 (approval of plans etc) sub-paragraph 31(4)(a); (b) in respect of the approval by the engineer of plans submitted by the undertaker and the supervision by the engineer of the construction or repair of a specified work and any protective works; (c) in respect of the employment during the construction of the specified works or any protective works of any inspectors, watchmen and other persons whom it is reasonably necessary to appoint for inspecting, watching and lighting any waterway and for preventing, so far as may be reasonably practicable, interference, obstruction, danger or accident arising from the construction or failure of the specified works or any protective works; (d) in bringing the specified works or any protective works to the notice of users of the Canal & River Trust’s network; and (e) in constructing and/or carrying out any measures related to any specified works or protective works which are reasonably required by the Canal & River Trust to ensure the safe navigation of the waterway save that nothing is to require the Canal & River Trust to construct and/or carry out any measures. (2) If the Canal & River Trust considers that a fee, charge, cost or expense will be payable by the undertaker pursuant to sub-paragraph (1), the Canal & River Trust will first provide an estimate of that fee, charge, cost or expense and supporting information in relation to the estimate to the undertaker along with a proposed timescale for payment for consideration and the undertaker may, within a period of 14 working days— (a) provide confirmation to the Canal & River Trust that the estimate is agreed and pay to the Canal & River Trust, by the date stipulated, that fee, charge, cost or expense; or (b) provide confirmation to the Canal & River Trust that the estimate is not accepted along with a revised estimate and a proposal as to how or why the undertaker considers that the estimate can be reduced and or paid at a later date. (3) The Canal & River Trust must take in to account any representations made by the undertaker in accordance with this paragraph 38 and must, within 15 working days of receipt of the information pursuant to sub-paragraph (1), confirm the amount of the fee, charge, cost or expense to be paid by the undertaker (if any) and the date by which this is to be paid. (4) The Canal & River Trust must, when estimating and incurring any charge, cost or expense pursuant to this paragraph 38, do so with a view to being reasonably economic and acting as if the Canal & River Trust were itself to fund the relevant fee, charge, cost or expense. Making good of detriment; compensation and indemnity, etc. 39 (1) If any detriment is caused by the construction or failure of the specified works or the protective works if carried out by the undertaker, the undertaker (if so required by the Canal & River Trust) must make good such detriment and must pay to the Canal & River Trust all reasonable expenses incurred by the Canal & River Trust, and compensation for any loss sustained by the Canal & River Trust in making good or otherwise by reason of the detriment. (2) The undertaker must be responsible for and make good to the Canal & River Trust all costs, charges, damages, expenses and losses not otherwise provided for in this Part which may be occasioned to and reasonably incurred by the Canal & River Trust— (a) by reason of the construction of a specified work or a protective work or the failure of such a work; or (b) by reason of any act or omission of the undertaker or of any person in its employ or of its contractors or others whilst engaged upon the construction of a specified work or protective work, and subject to sub-paragraph (4), the undertaker must effectively indemnify and hold harmless the Canal & River Trust from and against all claims and demands arising out of or in connection with any of the matters referred to in sub-paragraphs (a) and (b) (provided that the Canal & River Trust is not entitled to recover from the undertaker any consequential losses which are not reasonably foreseeable). (3) The fact that any act or thing may have been done by the Canal & River Trust on behalf of the undertaker or in accordance with plans approved by the engineer or in accordance with any requirement of the engineer or under the engineer’s supervision or in accordance with any directions or awards of an arbitrator is not to (if it was done without negligence on the part of the Canal & River Trust or of any person in its employ or of its contractors or agents) excuse the undertaker from any liability under the provisions of this paragraph. (4) Nothing in sub-paragraph (2) imposes any liability on the undertaker with respect to any detriment, loss or interruption to the extent that it is attributable to the act, neglect or default of the Canal & River Trust, its officers, servants, contractors or agents. (5) The Canal & River Trust must give the undertaker reasonable notice of any such claim or demand as aforesaid and no settlement or compromise of such a claim or demand is to be made without the prior consent of the undertaker. (6) The Canal & River Trust must use its reasonable endeavours to mitigate in whole or in part and to minimise any costs, expenses, loss, demands, and penalties to which the indemnity under this paragraph 39 applies. If requested to do so by the undertaker, the Canal & River Trust must provide an explanation of how the claim has been minimised. Arbitration 40 Any difference arising between the undertaker and the Canal & River Trust under this Part (other than a difference as to the meaning or construction of this Part) must be referred to and settled by arbitration in accordance with article 42 (arbitration) of this Order. Capitalised sums 41 (1) Any capitalised sum which is required to be paid under this Part must be calculated by multiplying the cost of the maintenance or renewal works to the waterway necessitated as a result of the operation of the authorised development by the number of times that the maintenance or renewal works will be required during the operation of the authorised development. (2) The aggregate cap of the undertaker’s gross liability to pay capitalised sums and any other payments or liabilities under the terms of this Part of this Schedule shall be limited to £5,000,000 (five million pounds) for any one occurrence or all occurrences of a series arising out of the one original cause. As built drawings 42 (1) As soon as reasonably practicable following the completion of the construction of the authorised development, the undertaker must provide to the Canal & River Trust as built drawings of any specified works in a form and scale to be agreed between the undertaker and the Canal & River Trust to show the position of those works in relation to the waterway. Decommissioning 43 Where the decommissioning environmental management plan identifies activities which may impact the waterway, the protective provisions in this Part 4 of Schedule 14 will, so far as appropriate, apply to those activities as if they were a specified work. PART 5 FOR THE PROTECTION OF THE ENVIRONMENT AGENCY 44 (1) The following provisions apply for the protection of the Agency unless otherwise agreed in writing between the undertaker and the Agency. (2) In this Part of this Schedule— “Agency” means the Environment Agency; “construction” includes execution, placing, altering, replacing, relaying and removal and excavation and “construct” and “constructed” is construed accordingly; “drainage work” means any main river and includes any land which provides flood storage capacity for any main river and any bank, wall, embankment or other structure, or any appliance, constructed or used for land drainage, flood defence or tidal monitoring; “fishery” means any waters containing fish and fish in, or migrating to or from, such waters and the spawn, spawning ground, habitat or food of such fish; “main river” has the same meaning given in section 113 of the Water Resources Act 1991; “plans” includes sections, drawings, specifications, calculations and method statements; “remote defence” means any berm, wall or embankment that is constructed for the purposes of preventing or alleviating flooding from, or in connection with, any main river; “specified work” means so much of any work or operation authorised by this Order as is in, on, under, over or within; 8 metres of the base of a remote defence which is likely to— endanger the stability of, cause damage or reduce the effectiveness of that remote defence, or interfere with the Agency’s access to or along that remote defence; 16 metres of a drainage work involving a tidal main river or 8 metres of a drainage work involving a non-tidal main river; or any distance of a drainage work and is otherwise likely to— affect any drainage work or the volumetric rate of flow of water in or flowing to or from any drainage work; affect the flow, purity or quality of water in any main river or other surface waters; cause obstruction to the free passage of fish or damage to any fishery; affect the conservation, distribution or use of water resources; or affect the conservation value of the main river and habitats in its immediate vicinity; or which involves— an activity that includes dredging, raising or taking of any sand, silt, ballast, clay, gravel or other materials from or off the bed or banks of a drainage work (or causing such materials to be dredged, raised or taken), including hydrodynamic dredging or desilting; and any quarrying or excavation within 16 metres of a drainage work which is likely to cause damage to or endanger the stability of the banks or structure of that drainage work. Submission and approval of plans 45 (1) Before beginning to construct any specified work, the undertaker must submit to the Agency plans of the specified work and such further particulars available to it as the Agency may within 28 days of the receipt of the plans reasonably request. (2) Any such specified work must not be constructed except in accordance with such plans as may be approved in writing by the Agency, or determined under paragraph 55. (3) Any approval of the Agency required under this paragraph— (a) must not be unreasonably withheld or delayed; (b) is deemed to have been refused if it is neither given nor refused within 2 months of the submission of the plans or receipt of further particulars if such particulars have been requested by the Agency for approval; and (c) may be given subject to such reasonable requirements as the Agency may have for the protection of any drainage work or the fishery or for the protection of water resources, or for the prevention of flooding or pollution or for nature conservation or in the discharge of its environmental duties. (4) The Agency must use its reasonable endeavours to respond to the submission of any plans before the expiration of the period mentioned in sub-paragraph 45(3)(b). (5) In the case of a refusal, if requested to do so the Agency must provide reasons for the grounds of that refusal. Construction of protective works 46 Without limiting paragraph 45 the requirements which the Agency may have under that paragraph include conditions requiring the undertaker, at its own expense, to construct such protective works, whether temporary or permanent, before or during the construction of the specified works (including the provision of flood banks, walls or embankments or other new works and the strengthening, repair or renewal of existing banks, walls or embankments) as are reasonably necessary— (a) to safeguard any drainage work against damage; or (b) to secure that its efficiency for flood defence purposes is not impaired and that the risk of flooding is not otherwise increased, by reason of any specified work. Timing of works and service of notices 47 (1) Subject to sub-paragraph 47(2), any specified work, and all protective works required by the Agency under paragraph 46, must be constructed— (a) without unreasonable delay in accordance with the plans approved under this Part of this Schedule; and (b) to the reasonable satisfaction of the Agency, and the Agency is entitled by its officer to watch and inspect the construction of such works. (2) The undertaker must give to the Agency not less than 14 days’ notice in writing of its intention to commence construction of any specified work and notice in writing of its completion not later than 7 days after the date on which it is completed. (3) If the Agency reasonably requires, the undertaker must construct all or part of the protective works so that they are in place prior to the construction of any specified work to which the protective works relate. Works not in accordance with this Schedule 48 (1) If any part of a specified work or any protective work required by the Agency is constructed otherwise than in accordance with the requirements of this Part of this Schedule, the Agency may by notice in writing require the undertaker at the undertaker’s own expense to comply with the requirements of this Part of this Schedule or (if the undertaker so elects and the Agency in writing consents, such consent not to be unreasonably withheld or delayed) to remove, alter or pull down the work and, where removal is required, to restore the site to its former condition to such extent and within such limits as the Agency reasonably requires. (2) Subject to sub-paragraph (3) if, within a reasonable period, being not less than 28 days beginning with the date when a notice under sub-paragraph (1) is served upon the undertaker, the undertaker has failed to begin taking steps to comply with the requirements of the notice and has not subsequently made reasonably expeditious progress towards their implementation, the Agency may execute the works specified in the notice and any reasonable expenditure incurred by the Agency in so doing is recoverable from the undertaker. (3) In the event of any dispute as to whether sub-paragraph (1) is properly applicable to any work in respect of which notice has been served under that sub-paragraph, or as to the reasonableness of any requirement of such a notice, the Agency must not, except in the case of an emergency, exercise the powers conferred by sub-paragraph (2) until the dispute has been finally determined in accordance with paragraph 55. Maintenance of works 49 (1) Subject to sub-paragraph (6) the undertaker must from the commencement of the construction of the specified works maintain in good repair and condition and free from obstruction any drainage work which is situated within the Order limits and on land held by the undertaker for the purposes of or in connection with the specified works, whether or not the drainage work is constructed under the powers conferred by this Order or is already in existence. (2) If any such drainage work which the undertaker is liable to maintain is not maintained to the reasonable satisfaction of the Agency, the Agency may by notice in writing require the undertaker to repair and restore the work, or any part of such work, or (if the undertaker so elects and the Agency in writing consents, such consent not to be unreasonably withheld or delayed), to remove the work and restore the site to its former condition, to such extent and within such limits as the Agency reasonably requires. (3) Subject to sub-paragraph (5) if, within a reasonable period, being not less than 28 days beginning with the date on which a notice in respect of any drainage work is served under sub-paragraph (2) on the undertaker, the undertaker has failed to begin taking steps to comply with the requirements of the notice and has not subsequently made reasonably expeditious progress towards their implementation, the Agency may do what is necessary for such compliance and any reasonable expenditure incurred by the Agency in so doing is recoverable from the undertaker. (4) If there is any failure by the undertaker to obtain consent or comply with conditions imposed by the Agency in accordance with these protective provisions the Agency may serve written notice requiring the undertaker to cease all or part of the specified works and the undertaker must cease the specified works or part thereof until it has obtained the consent or complied with the condition unless the cessation of the specified works or part thereof would cause greater damage than compliance with the written notice. (5) In the event of any dispute as to the reasonableness of any requirement of a notice served under sub-paragraph (2), the Agency must not, except in the case of an emergency, exercise the powers conferred by sub-paragraph (3) until the dispute has been finally determined in accordance with paragraph 55. (6) This paragraph does not apply to— (a) drainage works which are vested in the Agency, or which the Agency or another person is liable to maintain and is not proscribed by the powers of the Order from doing so; and (b) any obstruction of a drainage work expressly authorised in the approval of specified works plans and carried out in accordance with the provisions of this Part of this Schedule provided that any obstruction is removed as soon as reasonably practicable. Remediating impaired drainage work 50 If by reason of the construction of any specified work or of the failure of any such work, the efficiency of any drainage work for flood defence purposes is impaired, or that drainage work is otherwise damaged, such impairment or damage must be made good by the undertaker to the reasonable satisfaction of the Agency and if the undertaker fails to do so, the Agency may make good the impairment or damage and recover any expenditure incurred by the Agency in so doing from the undertaker. Agency access 51 If by reason of construction of the specified work the Agency’s access to flood defences or equipment maintained for flood defence purposes is materially obstructed, the undertaker must provide such alternative means of access that will allow the Agency to maintain the flood defence or use the equipment no less effectively than was possible before the obstruction within 24 hours of or as soon as reasonably practicable after the undertaker becoming aware of such obstruction. Free passage of fish 52 (1) The undertaker must take all such measures as may be reasonably practicable to prevent any interruption of the free passage of fish in the fishery during the construction of any specified work. (2) If by reason of— (a) the construction of any specified work; or (b) the failure of any such work, damage to the fishery is caused, or the Agency has reason to expect that such damage may be caused, the Agency may serve notice on the undertaker requiring it to take such steps as may be reasonably practicable to make good the damage, or, as the case may be, to protect the fishery against such damage. (3) If within such time as may be reasonably practicable for that purpose after the receipt of written notice from the Agency of any damage or expected damage to a fishery, the undertaker fails to take such steps as are described in sub-paragraph (2), the Agency may take those steps and any expenditure incurred by the Agency in so doing is recoverable from the undertaker. (4) In any case where immediate action by the Agency is reasonably required in order to secure that the risk of damage to the fishery is avoided or reduced, the Agency may take such steps as are reasonable for the purpose, and may recover from the undertaker any expenditure incurred in so doing provided that notice specifying those steps is served on the undertaker as soon as reasonably practicable after the Agency has taken, or commenced to take, the steps specified in the notice. Indemnity 53 The undertaker indemnifies the Agency in respect of all costs, charges and expenses which the Agency may reasonably incur— (a) in the examination or approval of plans under this Part of this Schedule; (b) in the inspection of the construction of the specified works or any protective works required by the Agency under this Part of this Schedule; and (c) in the carrying out of any surveys or tests by the Agency which are reasonably required in connection with the construction of the specified works. 54 (1) The undertaker is responsible for and indemnifies the Agency against all costs and losses, liabilities, claims and demands not otherwise provided for in this Schedule which may be reasonably incurred or suffered by the Agency by reason of, or arising out of— (a) the construction, operation or maintenance of any specified works comprised within the authorised development or the failure of any such works comprised within them; or (b) any act or omission of the undertaker, its employees, contractors or agents or others whilst engaged upon the construction, operation or maintenance of the authorised development or dealing with any failure of the authorised development. (2) For the avoidance of doubt, in sub-paragraph (1)— “costs” includes— expenses and charges; staff costs and overheads; and legal costs; “losses” includes physical damage; “claims” and “demands” include as applicable— costs (within the meaning of this sub-paragraph (2)) incurred in connection with any claim or demand; and any interest element of sums claimed or demanded; and “liabilities” includes— contractual liabilities; tortious liabilities (including liabilities for negligence or nuisance); liabilities to pay statutory compensation or for breach of statutory duty; and liabilities to pay statutory penalties imposed on the basis of strict liability (but does not include liabilities to pay other statutory penalties). (3) The Agency must give to the undertaker reasonable notice of any such claim or demand and must not settle or compromise a claim without the agreement of the undertaker and that agreement must not be unreasonably withheld or delayed. (4) The Agency must, at all times take reasonable steps to prevent and mitigate any such claims, demands, proceedings, costs, damages, expenses or loss. (5) The fact that any work or thing has been executed or done by the undertaker in accordance with a plan approved by the Agency, or to its satisfaction, or in accordance with any directions or award of an arbitrator, must not relieve the undertaker from any liability under the provisions of this Part of this Schedule. (6) Nothing in this paragraph imposes any liability on the undertaker with respect to any costs, charges, expenses, damages, claims, demands or losses to the extent that they are attributable to the neglect or default of the Agency, its officers, servants, contractors or agents. Disputes 55 Any dispute arising between the undertaker and the Agency under this Part of this Schedule must, if the parties agree, be determined by arbitration under article 42 (arbitration), but failing agreement be determined by the Secretary of State for Environment, Food and Rural Affairs or its successor and the Secretary of State for the department of Energy Security and Net Zero or its successor acting jointly on a reference to them by the undertaker or the Agency, after notice in writing by one to the other. PART 6 FOR THE PROTECTION OF RAILWAY INTERESTS 56 The provisions of this Part of this Schedule have effect, unless otherwise agreed in writing between the undertaker and Network Rail and, in the case of paragraph 70 of this Part of this Schedule any other person on whom rights or obligations are conferred by that paragraph. 57 In this Part of this Schedule— “asset protection agreement” means an agreement to regulate the construction and maintenance of the specified work in a form prescribed from time to time by Network Rail; “construction” includes execution, placing, alteration and reconstruction and “construct” and “constructed” have corresponding meanings; “the engineer” means an engineer appointed by Network Rail for the purposes of this Order; “network licence” means the network licence, as the same is amended from time to time, granted to Network Rail Infrastructure Limited by the Secretary of State in exercise of their powers under section 8 (licences) of the Railways Act 1993; “Network Rail” means Network Rail Infrastructure Limited (company number 02904587, whose registered office is at Waterloo General Office, London SE1 8SW) and any associated company of Network Rail Infrastructure Limited which holds property for railway purposes, and for the purpose of this definition “associated company” means any company which is (within the meaning of section 1159 of the Companies Act 2006 the holding company of Network Rail Infrastructure Limited, a subsidiary of Network Rail Infrastructure Limited or another subsidiary of the holding company of Network Rail Infrastructure Limited and any successor to Network Rail Infrastructure Limited’s railway undertaking; “plans” includes sections, designs, design data, software, drawings, specifications, soil reports, calculations, descriptions (including descriptions of methods of construction), staging proposals, programmes and details of the extent, timing and duration of any proposed occupation of railway property; “railway operational procedures” means procedures specified under any access agreement (as defined in the Railways Act 1993) or station lease; “railway property” means any railway belonging to Network Rail and— any station, land, works, apparatus and equipment belonging to Network Rail or connected with any such railway; and any easement or other property interest held or used by Network Rail or a tenant or licensee of Network Rail for the purposes of such railway or works, apparatus or equipment; “regulatory consents” means any consent or approval required under— the Railways Act 1993; the network licence; and/or any other relevant statutory or regulatory provisions, by either the Office of Rail and Road or the Secretary of State for Transport or any other competent body including change procedures and any other consents, approvals of any access or beneficiary that may be required in relation to the authorised development; “specified work” means so much of any of the authorised development as is situated upon, across, under, over or within 15 metres of, or may in any way adversely affect, railway property and, for the avoidance of doubt, includes the maintenance of such works under the powers conferred by article 5 (power to maintain the authorised development) in respect of such works. 58 (1) Where under this Part of this Schedule Network Rail is required to give its consent or approval in respect of any matter, that consent or approval is subject to the condition that Network Rail complies with any relevant railway operational procedures and any obligations under its network licence or under statute. (2) In so far as any specified work or the acquisition or use of railway property is or may be subject to railway operational procedures, Network Rail must— (a) co-operate with the undertaker with a view to avoiding undue delay and securing conformity as between any plans approved by the engineer and requirements emanating from those procedures; and (b) use their reasonable endeavours to avoid any conflict arising between the application of those procedures and the proper implementation of the authorised development pursuant to this Order. 59 (1) The undertaker must not exercise the powers conferred by— (a) article 3 (development consent etc. granted by this Order); (b) article 5 (power to maintain the authorised development); (c) article 16 (discharge of water); (d) article 19 (authority to survey and investigate the land); (e) article 20 (compulsory acquisition of land); (f) article 22 (compulsory acquisition of rights); (g) article 25 (acquisition of subsoil only); (h) article 26 (power to override easements and other rights); (i) article 29 (temporary use of land for constructing the authorised development); (j) article 30 (temporary use of land for maintaining the authorised development); (k) article 31 (statutory undertakers); (l) article 23 (private rights); (m) article 38 (felling or lopping of trees and removal of hedgerows); (n) article 39 (trees subject to tree preservation orders); (o) the powers conferred by section 11(3) (power of entry) of the Compulsory Purchase Act 1965; (p) the powers conferred by section 203 (power to override easements and rights) of the Housing and Planning Act 2016; (q) the powers conferred by section 172 (right to enter and survey land) of the Housing and Planning Act 2016; (r) any powers ... in respect of the temporary possession of land under the Neighbourhood Planning Act 2017; in respect of any railway property unless the exercise of such powers is with the consent of Network Rail. (2) The undertaker must not in the exercise of the powers conferred by this Order prevent pedestrian or vehicular access to any railway property, unless preventing such access is with the consent of Network Rail. (3) The undertaker must not exercise the powers conferred by sections 271 or 272 of the 1990 Act, article 31 (statutory undertakers), article 26 (power to override easements and other rights) or article 23 (private rights), in relation to any right of access of Network Rail to railway property, but such right of access may be diverted with the consent of Network Rail. (4) The undertaker must not under the powers of this Order acquire or use or acquire new rights over, or seek to impose any restrictive covenants over, any railway property, or extinguish any existing rights of Network Rail in respect of any third party property, except with the consent of Network Rail. (5) The undertaker must not under the powers of this Order do anything which would result in railway property being incapable of being used or maintained or which would affect the safe running of trains on the railway. (6) Where Network Rail is asked to give its consent pursuant to this paragraph, such consent must not be unreasonably withheld but may be given subject to reasonable conditions but it shall never be unreasonable to withhold consent for reasons of operational or railway safety (such matters to be in Network Rail’s absolute discretion). (7) The undertaker must enter into an asset protection agreement prior to the carrying out of any specified work. 60 (1) The undertaker must before commencing construction of any specified work supply to Network Rail proper and sufficient plans of that work for the reasonable approval of the engineer and the specified work must not be commenced except in accordance with such plans as have been approved in writing by the engineer or settled by arbitration. (2) The approval of the engineer under sub-paragraph 60(1) must not be unreasonably withheld, and if by the end of the period of 28 days beginning with the date on which such plans have been supplied to Network Rail the engineer has not intimated their disapproval of those plans and the grounds of such disapproval the undertaker may serve upon the engineer written notice requiring the engineer to intimate approval or disapproval within a further period of 28 days beginning with the date upon which the engineer receives written notice from the undertaker. If by the expiry of the further 28 days the engineer has not intimated approval or disapproval, the engineer shall be deemed to have approved the plans as submitted. (3) If by the end of the period of 28 days beginning with the date on which written notice was served upon the engineer under sub-paragraph (2), Network Rail gives notice to the undertaker that Network Rail desires itself to construct any part of a specified work which in the opinion of the engineer will or may affect the stability of railway property or the safe operation of traffic on the railways of Network Rail then, if the undertaker desires such part of the specified work to be constructed, Network Rail must construct it without unnecessary delay on behalf of and to the reasonable satisfaction of the undertaker in accordance with the plans approved or deemed to be approved or settled under this paragraph, and under the supervision (where appropriate and if given) of the undertaker. (4) When signifying their approval of the plans the engineer may specify any protective works (whether temporary or permanent) which in the engineer’s opinion should be carried out before the commencement of the construction of a specified work to ensure the safety or stability of railway property or the continuation of safe and efficient operation of the railways of Network Rail or the services of operators using the same (including any relocation de-commissioning and removal of works, apparatus and equipment necessitated by a specified work and the comfort and safety of passengers who may be affected by the specified works), and such protective works as may be reasonably necessary for those purposes must be constructed by Network Rail or by the undertaker, if Network Rail so desires, and such protective works must be carried out at the expense of the undertaker in either case without unnecessary delay and the undertaker must not commence the construction of the specified works until the engineer has notified the undertaker that the protective works have been completed to their reasonable satisfaction. 61 (1) Any specified work and any protective works to be constructed by virtue of paragraph 60(4) must, when commenced, be constructed— (a) without unnecessary delay in accordance with the plans approved or deemed to have been approved or settled under paragraph 60; (b) under the supervision (where appropriate and if given) and to the reasonable satisfaction of the engineer; (c) in such manner as to cause as little damage as is possible to railway property; and (d) so far as is reasonably practicable, so as not to interfere with or obstruct the free, uninterrupted and safe use of any railway of Network Rail or the traffic thereon and the use by passengers of railway property. (2) If any damage to railway property or any such interference or obstruction shall be caused by the carrying out of, or in consequence of the construction of a specified work, the undertaker must, notwithstanding any such approval, make good such damage and must pay to Network Rail all reasonable expenses to which Network Rail may be put and compensation for any loss which it may sustain by reason of any such damage, interference or obstruction. (3) Nothing in this Part of this Schedule imposes any liability on the undertaker with respect to any damage, costs, expenses or loss attributable to the negligence of Network Rail or its servants, contractors or agents or any liability on Network Rail with respect of any damage, costs, expenses or loss attributable to the negligence of the undertaker or its servants, contractors or agents. 62 The undertaker must— (a) at all times afford reasonable facilities to the engineer for access to a specified work during its construction; and (b) supply the engineer with all such information as they may reasonably require with regard to a specified work or the method of constructing it. 63 Network Rail must at all times afford reasonable facilities to the undertaker and its agents for access to any works carried out by Network Rail under this Part of this Schedule during their construction and must supply the undertaker with such information as it may reasonably require with regard to such works or the method of constructing them. 64 (1) If any permanent or temporary alterations or additions to railway property are reasonably necessary in consequence of the construction or completion of a specified work in order to ensure the safety of railway property or the continued safe operation of the railway of Network Rail, such alterations and additions may be carried out by Network Rail and if Network Rail gives to the undertaker 56 days’ notice (or in the event of an emergency or safety critical issue such notice as is reasonable in the circumstances) of its intention to carry out such alterations or additions (which must be specified in the notice), the undertaker must pay to Network Rail the reasonable cost of those alterations or additions including, in respect of any such alterations and additions as are to be permanent, a capitalised sum representing the increase of the costs which may be expected to be reasonably incurred by Network Rail in maintaining, working and, when necessary, renewing any such alterations or additions. (2) If during the construction of a specified work by the undertaker, Network Rail gives notice to the undertaker that Network Rail desires itself to construct that part of the specified work which in the opinion of the engineer is endangering the stability of railway property or the safe operation of traffic on the railways of Network Rail then, if the undertaker decides that part of the specified work is to be constructed, Network Rail must assume construction of that part of the specified work and the undertaker must, notwithstanding any such approval of a specified work under paragraph 60(3), pay to Network Rail all reasonable expenses to which Network Rail may be put and compensation for any loss which it may suffer by reason of the execution by Network Rail of that specified work. (3) The engineer must, in respect of the capitalised sums referred to in this paragraph and paragraph 65(a) provide such details of the formula by which those sums have been calculated as the undertaker may reasonably require. (4) If the cost of maintaining, working or renewing railway property is reduced in consequence of any such alterations or additions a capitalised sum representing such saving must be set off against any sum payable by the undertaker to Network Rail under this paragraph. 65 The undertaker must repay to Network Rail all reasonable fees, costs, charges and expenses reasonably incurred by Network Rail— (a) in constructing any part of a specified work on behalf of the undertaker as provided by paragraph 60(3) or in constructing any protective works under the provisions of paragraph 60(4) including, in respect of any permanent protective works, a capitalised sum representing the cost of maintaining and renewing those works; (b) in respect of the approval by the engineer of plans submitted by the undertaker and the supervision by the engineer of the construction of a specified work; (c) in respect of the employment or procurement of the services of any inspectors, signallers, watch-persons and other persons whom it shall be reasonably necessary to appoint for inspecting, signalling, watching and lighting railway property and for preventing, so far as may be reasonably practicable, interference, obstruction, danger or accident arising from the construction or failure of a specified work; (d) in respect of any special traffic working resulting from any speed restrictions which may in the opinion of the engineer, require to be imposed by reason or in consequence of the construction or failure of a specified work or from the substitution or diversion of services which may be reasonably necessary for the same reason; and (e) in respect of any additional temporary lighting of railway property in the vicinity of the specified works, being lighting made reasonably necessary by reason or in consequence of the construction or failure of a specified work. 66 (1) In this paragraph— “EMI” means, subject to sub-paragraph 66(2), electromagnetic interference with Network Rail apparatus generated by the operation of the authorised development where such interference is of a level which adversely affects the safe operation of Network Rail’s apparatus; and “Network Rail’s apparatus” means any lines, circuits, wires, apparatus or equipment (whether or not modified or installed as part of the authorised development) which are owned or used by Network Rail for the purpose of transmitting or receiving electrical energy or of radio, telegraphic, telephonic, electric, electronic or other like means of signalling or other communications. (2) This paragraph applies to EMI only to the extent that such EMI is not attributable to any change to Network Rail’s apparatus carried out after approval of plans under paragraph 60(1) for the relevant part of the authorised development giving rise to EMI (unless the undertaker has been given notice in writing before the approval of those plans of the intention to make such change). (3) Subject to sub-paragraph 66(5), the undertaker must in the design and construction of the authorised development take all measures necessary to prevent EMI and must establish with Network Rail (both parties acting reasonably) appropriate arrangements to verify their effectiveness. (4) In order to facilitate the undertaker’s compliance with sub-paragraph (3)— (a) the undertaker must consult with Network Rail as early as reasonably practicable to identify all Network Rail’s apparatus which may be at risk of EMI, and thereafter must continue to consult with Network Rail (both before and after formal submission of plans under paragraph 60(1)) in order to identify all potential causes of EMI and the measures required to eliminate them; (b) Network Rail must make available to the undertaker all information in the possession of Network Rail reasonably requested by the undertaker in respect of Network Rail’s apparatus identified pursuant to sub-paragraph 66(4)(a); and (c) Network Rail must allow the undertaker reasonable facilities for the inspection of Network Rail’s apparatus identified pursuant to sub-paragraph 66(4)(a). (5) In any case where it is established that EMI can only reasonably be prevented by modifications to Network Rail’s apparatus, Network Rail must not withhold its consent unreasonably to modifications of Network Rail’s apparatus, but the means of prevention and the method of their execution must be selected in the reasonable discretion of Network Rail, and in relation to such modifications paragraph 60(1) has effect subject to the sub-paragraph. (6) Prior to the commencement of operation of the authorised development the undertaker shall test the use of the authorised development in a manner that shall first have been agreed with Network Rail and if, notwithstanding any measures adopted pursuant to sub-paragraph (3), the testing of the authorised development causes EMI then the undertaker must immediately upon receipt of notification by Network Rail of such EMI either in writing or communicated orally (such oral communication to be confirmed in writing as soon as reasonably practicable after it has been issued) forthwith cease to use (or procure the cessation of use of) the undertaker’s apparatus causing such EMI until all measures necessary have been taken to remedy such EMI by way of modification to the source of such EMI or (in the circumstances, and subject to the consent, specified in sub-paragraph (5)) to Network Rail’s apparatus. (7) In the event of EMI having occurred— (a) the undertaker must afford reasonable facilities to Network Rail for access to the undertaker’s apparatus in the investigation of such EMI; (b) Network Rail must afford reasonable facilities to the undertaker for access to Network Rail’s apparatus in the investigation of such EMI; (c) Network Rail must make available to the undertaker any additional material information in its possession reasonably requested by the undertaker in respect of Network Rail’s apparatus or such EMI; and (d) the undertaker shall not allow the use or operation of the authorised development in a manner that has caused or will cause EMI until measures have been taken in accordance with this paragraph to prevent EMI occurring. (8) Where Network Rail approves modifications to Network Rail’s apparatus pursuant to sub-paragraphs 66(5) or (6)— (a) Network Rail must allow the undertaker reasonable facilities for the inspection of the relevant part of Network Rail’s apparatus; (b) any modifications to Network Rail’s apparatus approved pursuant to those sub-paragraphs must be carried out and completed by the undertaker in accordance with paragraph 61. (9) To the extent that it would not otherwise do so, the indemnity in paragraph 70(1) applies to the costs and expenses reasonably incurred or losses suffered by Network Rail through the implementation of the provisions of this paragraph (including costs incurred in connection with the consideration of proposals, approval of plans, supervision and inspection of works and facilitating access to Network Rail’s apparatus) or in consequence of any EMI to which sub-paragraph 61 applies. (10) For the purpose of paragraph 65(a) any modifications to Network Rail’s apparatus under this paragraph shall be deemed to be protective works referred to in that paragraph. 67 If at any time after the completion of a specified work, not being a work vested in Network Rail, Network Rail gives notice to the undertaker informing it that the state of maintenance of any part of the specified work appears to be such as adversely affects the operation of railway property, the undertaker must, on receipt of such notice, take such steps as may be reasonably necessary to put that specified work in such state of maintenance as not adversely to affect railway property. 68 The undertaker must not provide any illumination or illuminated sign or signal on or in connection with a specified work in the vicinity of any railway belonging to Network Rail unless it has first consulted Network Rail and it must comply with Network Rail’s reasonable requirements for preventing confusion between such illumination or illuminated sign or signal and any railway signal or other light used for controlling, directing or securing the safety of traffic on the railway. 69 Any additional expenses which Network Rail may reasonably incur in altering, reconstructing or maintaining railway property under any powers existing at the making of this Order by reason of the existence of a specified work must, provided that 56 days’ previous notice of the commencement of such alteration, reconstruction or maintenance has been given to the undertaker, be repaid by the undertaker to Network Rail. 70 (1) The undertaker must pay to Network Rail all reasonable costs, charges, damages and expenses not otherwise provided for in this Part of this Schedule (subject to article 41 (no double recovery)) which may be occasioned to or reasonably incurred by Network Rail— (a) by reason of the construction, maintenance or operation of a specified work or the failure thereof; (b) by reason of any act or omission of the undertaker or of any person in its employ or of its contractors or others whilst engaged upon a specified work; (c) by reason of any act or omission of the undertaker or any person in its employ or of its contractors or others whilst accessing to or egressing from the authorised development; (d) in respect of any damage caused to or additional maintenance required to, railway property or any such interference or obstruction or delay to the operation of the railway as a result of access to or egress from the authorised development by the undertaker or any person in its employ or of its contractors or others; or (e) in respect of costs incurred by Network Rail in complying with any railway operational procedures or obtaining any regulatory consents which procedures are required to be followed or consents obtained to facilitate the carrying out or operation of the authorised development; and the undertaker must indemnify and keep indemnified Network Rail from and against all claims and demands arising out of or in connection with a specified work or any such failure, act or omission: and the fact that any act or thing may have been done by Network Rail on behalf of the undertaker or in accordance with plans approved by the engineer or in accordance with any requirement of the engineer or under the engineer’s supervision shall not (if it was done without negligence on the part of Network Rail or of any person in its employ or of its contractors or agents) excuse the undertaker from any liability under the provisions of this sub-paragraph. (2) Network Rail must— (a) give the undertaker reasonable written notice of any such claims or demands; (b) not make any settlement or compromise of such a claim or demand without the prior consent of the undertaker; and (c) take such steps as are within its control and are reasonable in the circumstances to mitigate any liabilities relating to such claims or demands. (3) The sums payable by the undertaker under sub-paragraph (1) shall if relevant include a sum equivalent to the relevant costs. (4) Subject to the terms of any agreement between Network Rail and a train operator regarding the timing or method of payment of the relevant costs in respect of that train operator, Network Rail must promptly pay to each train operator the amount of any sums which Network Rail receives under sub-paragraph (3) which relates to the relevant costs of that train operator. (5) The obligation under sub-paragraph (3) to pay Network Rail the relevant costs shall, in the event of default, be enforceable directly by any train operator concerned to the extent that such sums would be payable to that operator pursuant to sub-paragraph (4). (6) In this paragraph— “the relevant costs” means the costs, losses and expenses (including loss of revenue) reasonably incurred by each train operator as a consequence of any specified work including but not limited to any restriction of the use of Network Rail’s railway network as a result of the construction, maintenance or failure of a specified work or any such act or omission as mentioned in sub-paragraph (1); and “train operator” means any person who is authorised to act as the operator of a train by a licence under section 8 of the Railways Act 1993. 71 Network Rail must, on receipt of a request from the undertaker, from time to time provide the undertaker free of charge with written estimates of the costs, charges, expenses and other liabilities for which the undertaker is or will become liable under this Part of this Schedule (including the amount of the relevant costs mentioned in paragraph 70) and with such information as may reasonably enable the undertaker to assess the reasonableness of any such estimate or claim made or to be made pursuant to this Part of this Schedule (including any claim relating to those relevant costs). 72 In the assessment of any sums payable to Network Rail under this Part of this Schedule there must not be taken into account any increase in the sums claimed that is attributable to any action taken by or any agreement entered into by Network Rail if that action or agreement was not reasonably necessary and was taken or entered into with a view to obtaining the payment of those sums by the undertaker under this Part of this Schedule or increasing the sums so payable. 73 The undertaker and Network Rail may, subject in the case of Network Rail to compliance with the terms of its network licence, enter into, and carry into effect, agreements for the transfer to the undertaker of— (a) any railway property shown on the works and land plans and described in the book of reference; (b) any lands, works or other property held in connection with any such railway property; and (c) any rights and obligations (whether or not statutory) of Network Rail relating to any railway property or any lands, works or other property referred to in this paragraph. 74 Nothing in this Order, or in any enactment incorporated with or applied by this Order, prejudices or affects the operation of Part I of the Railways Act 1993. 75 The undertaker must give written notice to Network Rail if any application is proposed to be made by the undertaker for the Secretary of State’s consent, under article 35 (consent to transfer the benefit of the Order) of this Order and any such notice must be given no later than 28 days before any such application is made and must describe or give (as appropriate)— (a) the nature of the application to be made; (b) the extent of the geographical area to which the application relates; and (c) the name and address of the person acting for the Secretary of State to whom the application is to be made. 76 The undertaker must no later than 28 days from the date that the plans submitted to and certified by the Secretary of State in accordance with article 40 (certification of plans and documents, etc.) are certified by the Secretary of State, provide a set of those plans to Network Rail in a format specified by Network Rail. 77 Any dispute arising under this Part of this Schedule, unless otherwise provided for, must be referred to and settled by arbitration in accordance with article 42 (arbitration) and the Rules at Schedule 13 (arbitration Rules). PART 7 FOR THE PROTECTION OF NATIONAL GRID ELECTRICITY TRANSMISSION PLC AS ELECTRICITY UNDERTAKER Application 78 (1) For the protection of National Grid as referred to in this Part of this Schedule the following provisions have effect, unless otherwise agreed in writing between the undertaker and National Grid. (2) Subject to sub-paragraph (3) or to the extent otherwise agreed in writing between the undertaker and National Grid, where the benefit of this Order is transferred or granted to another person under article 35 (consent to transfer the benefit of the Order)— (a) any agreement of the type mentioned in sub-paragraph (1) has effect as if it had been made between National Grid and the transferee or grantee (as the case may be); and (b) written notice of the transfer or grant must be given to National Grid on or before the date of that transfer or grant. (3) Sub-paragraph (2) does not apply where the benefit of the Order is transferred or granted to National Grid (but without prejudice to paragraph 93(3)(b)). Interpretation 79 In this Part of this Schedule— “the 1991 Act” means the New Roads and Street Works Act 1991; “acceptable credit provider” means a bank or financial institution with a credit rating that is not lower than: (i) “A-” if the rating is assigned by Standard & Poor’s Ratings Group or Fitch Ratings; and “A3” if the rating is assigned by Moody’s Investors Services Inc.; “acceptable insurance” means general third party liability insurance effected and maintained by the undertaker with a combined property damage and bodily injury limit of indemnity of not less than £50,000,000.00 (fifty million pounds) per occurrence or series of occurrences arising out of one event or such lower amount as may be agreed in writing by National Grid. Such insurance shall be maintained (a) during the construction period of the authorised works; and (b) after the construction period of the authorised works in respect of any maintenance of the authorised development by or on behalf of the undertaker which constitute specified works and arranged with an insurer whose security/credit rating meets the same requirements as an “acceptable credit provider”, such insurance shall include (without limitation): a waiver of subrogation and an indemnity to principal clause in favour of National Grid; and pollution liability for third party property damage and third party bodily damage arising from any pollution/contamination event with a (sub)limit of indemnity of not less than £10,000,000.00 (ten million pounds) per occurrence or series of occurrences arising out of one event or £20,000,000.00 (twenty million pounds) in aggregate; “acceptable security” means either: a parent company guarantee from a parent company in favour of National Grid to cover the undertaker’s liability to National Grid to a total liability cap of £50,000,000.00 (fifty million pounds) or such lower amount as approved in writing by National Grid (in a form reasonably satisfactory to National Grid and where required by National Grid, accompanied with a legal opinion confirming the due capacity and authorisation of the parent company to enter into and be bound by the terms of such guarantee); or a bank bond or letter of credit from an acceptable credit provider in favour of National Grid to cover the undertaker’s liability to National Grid for an amount of not less than £10,000,000.00 (ten million pounds) per asset per event up to a total liability cap of £50,000,000.00 (fifty million pounds) or such lower amount as approved in writing by National Grid (in a form reasonably satisfactory to National Grid); “alternative apparatus” means appropriate alternative apparatus to the satisfaction of National Grid to enable National Grid to fulfil its statutory functions in a manner no less efficient than previously; “apparatus” means any electric lines or electrical plant as defined in the Electricity Act 1989, belonging to or maintained by National Grid together with any replacement apparatus and such other apparatus constructed pursuant to the Order that becomes operational apparatus of National Grid for the purposes of transmission, distribution and/or supply and includes any structure in which apparatus is or will be lodged or which gives or will give access to apparatus; “authorised works” has the same meaning as is given to the term “authorised development” in article 2 (interpretation) of this Order and includes any associated development authorised by the Order and for the purposes of this Part of this Schedule includes the use and maintenance of the authorised works and construction of any works authorised by this Schedule; “commence” has the same meaning as is given in article 2 (interpretation) of this Order and “commencement” will be construed to have the same meaning save that for the purposes of this Part of this Schedule only, the terms “commence” and “commencement” include operations for the purposes of intrusive archaeological investigations and intrusive investigations of the existing condition of the ground or structures within 15 metres in any direction of National Grid’s apparatus; “deed of consent” means a deed of consent, crossing agreement, deed of variation or new deed of grant agreed between the parties acting reasonably in order to vary or replace existing easements, agreements, enactments and other such interests so as to secure land rights and interests as are necessary to carry out, maintain, operate and use the apparatus in a manner consistent with the terms of this Part of this Schedule; “functions” includes powers and duties; “ground mitigation scheme” means a scheme approved by National Grid (such approval not to be unreasonably withheld or delayed) setting out the necessary measures (if any) for a ground subsidence event; “ground monitoring scheme” means a scheme for monitoring ground subsidence which sets out the apparatus which is to be subject to such monitoring, the extent of land to be monitored, the manner in which ground levels are to be monitored, the timescales of any monitoring activities and the extent of ground subsidence which, if exceeded, shall require the undertaker to submit for National Grid’s approval a ground mitigation scheme; “ground subsidence event” means any ground subsidence identified by the monitoring activities set out in the ground monitoring scheme that has exceeded the level described in the ground monitoring scheme as requiring a ground mitigation scheme; “in” in a context referring to apparatus or alternative apparatus in land includes a reference to apparatus or alternative apparatus under, over, across, along or upon such land; “Incentive Deduction” means any incentive deduction National Grid receives under its electricity transmission licence which is caused by an event on its transmission system that causes electricity not to be supplied to a demand customer and which arises as a result of the authorised works; “maintain” and “maintenance” shall include the ability and right to do any of the following in relation to any apparatus or alternative apparatus of National Grid: construct, use, repair, alter, inspect, renew or remove the apparatus; “National Grid” means National Grid Electricity Transmission Plc (company number 2366977) whose registered office is at 1-3 Strand, London, WC2N 5EH or any successor as a licence holder within the meaning of Part 1 of the Electricity Act 1989; “National Grid Connection Works” means any part of Work No. 3 as described in Schedule 1 of this Order (authorised development) and shown on sheet 22 of 22 of the works plans; “NGESO” means as defined in the STC; “plan” or “plans” include all designs, drawings, specifications, method statements, soil reports, programmes, calculations, risk assessments and other documents that are reasonably necessary properly and sufficiently to describe and assess the works to be executed; “parent company” means a parent company of the undertaker acceptable to and which shall have been approved by National Grid acting reasonably; “SEGL2 Project” means the 2GW High Voltage Direct Current (HVDC) electrical superhighway from Peterhead in Aberdeenshire to Drax in North Yorkshire known as Scotland to England Green Link 2; “SEGL2 Site” includes – Land on which any SEGL2 apparatus is situated; and Land on which SEGL2 apparatus is anticipated to be situated which is necessary for the construction, use or maintenance of the SEGL2 Project (in so far as the same has been notified by National Grid in writing to the undertaker); “Solar array works” means any part of Work Nos. 1, 2 and 4 that are within 15 metres of the SEGL2 Site; “specified works” means any of the authorised works or activities undertaken in association with the authorised works which— will or may be situated over, or within 15 metres measured in any direction of any apparatus the removal of which has not been required by the undertaker under paragraph 89(2) or otherwise; ... may in any way adversely affect any apparatus the removal of which has not been required by the undertaker under paragraph 89(2) or otherwise; and/or includes any of the activities that are referred to in development near overhead lines EN43-8 and HSE’s guidance note 6 “Avoidance of Danger from Overhead Lines.” “STC” means the System Operator Transmission Owner Code prepared by the electricity Transmission Owners and NGESO as modified from time to time; “STC Claims” means any claim made under the STC against National Grid Electricity Transmission plc arising out of or in connection with the de-energisation (whereby no electricity can flow to or from the relevant system through the generator or interconnector’s equipment) of a generator or interconnector party solely as a result of the de-energisation of plant and apparatus forming part of National Grid’s transmission system which arises as a result of the authorised works; “Transmission Owner” means as defined in the STC; and “undertaker” means the undertaker as defined in article 2 (interpretation) of this Order. Interaction with the SEGL2 Project 80 (1) Without limiting any other provision of this Part of this Schedule, the undertaker must use reasonable endeavours to avoid any conflict arising between the construction, maintenance and operation of the authorised development and the SEGL2 Project. For the purposes of this paragraph, “reasonable endeavours” means— (a) undertaking consultation on the detailed design and programming of the National Grid connection works and all works associated with or ancillary to the National Grid connection works to ensure that the design and programme for the National Grid connection works does not unreasonably impede or interfere with the SEGL2 Project; (b) undertaking consultation on the detailed design and programming of the Solar array works and all works associated with or ancillary to the Solar array works to ensure that the design and programme for the Solar array works does not unreasonably impede or interfere with the SEGL2 Project; (c) having regard to the proposed programme of works for the SEGL2 Project as may be made available to the undertaker by National Grid and facilitating a co-ordinated approach to the programme, land assembly, and the carrying out of the National Grid connection works and the SEGL2 Project; (d) providing a point of contact for continuing liaison and co-ordination throughout the construction and operation of the authorised development; and (e) keeping National Grid informed on the programme of works for the authorised development. National Grid connection works 81 The undertaker must not carry out the National Grid connection works, or any part of it except with the approval of National Grid in accordance with paragraph 82. 82 (1) Before beginning to construct any National Grid connection works, or any part of it, the undertaker must submit to National Grid plans of the relevant National Grid connection works (or part of it) and such further particulars available to it as National Grid may reasonably request within 21 days of receipt of the plans. (2) The undertaker must not commence any works to which sub-paragraph (1) applies until National Grid has given written approval of the plan so submitted. (3) Any approval of National Grid requested under paragraph 81 or sub-paragraph (2)— (a) may be given subject to reasonable conditions; and (b) must not be unreasonably withheld or delayed. (4) Any National Grid connection works must not be constructed except in accordance with such plans as may be approved in writing by National Grid or as amended from time to time by agreement between the undertaker and National Grid. (5) The undertaker will not be required to comply with sub-paragraph (1) where it needs to carry out emergency works as defined in the 1991 Act but in that case it must give to National Grid notice as soon as is reasonably practicable and a plan of those works and must comply with sub-paragraphs (2) and (3) insofar as is reasonably practicable in the circumstances. 83 The undertaker must give to National Grid not less than 14 days’ notice in writing of its intention to commence construction of any National Grid connection works and notice in writing of its completion not later than 7 days after the date on which it is completed and National Grid will be entitled by its officer to watch and inspect the construction of such works. 84 (1) If any part of the National Grid connection works is constructed otherwise than in accordance with paragraph 82(4) above National Grid may by notice in writing identify the extent to which the National Grid connection works do not comply with the approved details and request the undertaker at the undertaker’s own expense carry out remedial works so as to comply with the requirements of paragraph 82(4) of this Schedule or such alternative works as may be agreed with National Grid or as otherwise may be agreed between the parties. (2) Subject to sub-paragraph (3), if within a reasonable period, being not less than 28 days beginning with the date when a notice under sub-paragraph (2) is served upon the undertaker, the undertaker has failed to begin taking steps to comply with the requirements of the notice and has not subsequently made reasonably expeditious progress towards their implementation, National Grid may execute the works specified in the notice and any reasonable expenditure incurred by National Grid in so doing will be recoverable from the undertaker. (3) In the event of any dispute as to whether sub-paragraph (2) is properly applicable to any work in respect of which notice has been served under that sub-paragraph, or as to the reasonableness of any requirement of such a notice, National Grid will not, except in the case of an emergency, exercise the powers conferred by sub-paragraph (2) until the dispute has been finally determined in accordance with paragraph 97. On Street Apparatus 85 Except for paragraphs 86 (apparatus of National Grid in stopped up streets), 91 (retained apparatus), 92 (expenses) and 93 (indemnity) of this Schedule which will apply in respect of the exercise of all or any powers under the Order affecting the rights and apparatus of National Grid, the other provisions of this Schedule do not apply to apparatus in respect of which the relations between the undertaker and National Grid are regulated by the provisions of Part 3 of the 1991 Act. Apparatus of National Grid in stopped up streets 86 (1) Where any street is stopped up under article 11 (temporary closure of streets and public rights of way), if National Grid has any apparatus in the street or accessed via that street National Grid has the same rights in respect of that apparatus as it enjoyed immediately before the stopping up and the undertaker must grant to National Grid, or procure the granting to National Grid of, legal easements reasonably satisfactory to National Grid in respect of such apparatus and access to it prior to the stopping up of any such street but nothing in this paragraph affects any right of the undertaker or National Grid to require the removal of that apparatus under paragraph 89 or the power of the undertaker, subject to compliance with this sub-paragraph, to carry out works under paragraph 91. (2) Notwithstanding the temporary stopping up or diversion of any street under the powers of article 11 (temporary closure of streets and public rights of way), National Grid is at liberty at all times to take all necessary access across any such stopped up street and to execute and do all such works and things in, upon or under any such street as may be reasonably necessary or desirable to enable it to maintain any apparatus which at the time of the stopping up or diversion was in that street. Protective works to buildings 87 The undertaker, in the case of the powers conferred by article 18 (protective works to buildings), must exercise those powers so as not to obstruct or render less convenient the access to any apparatus without the written consent of National Grid which must not unreasonably be withheld. Acquisition of land 88 (1) Regardless of any provision in this Order or anything shown on the land plans or contained in the book of reference to the Order, the undertaker may not: (a) appropriate or acquire or take temporary possession of any land or apparatus; or (b) appropriate, acquire, extinguish, interfere with or override any easement, other interest or right and/or apparatus of National Grid otherwise than by agreement. (2) As a condition of an agreement between the parties in sub-paragraph (1), prior to the carrying out of any part of the authorised works (or in such other timeframe as may be agreed between National Grid and the undertaker) that is subject to the requirements of this Part of this Schedule that will cause any conflict with or breach the terms of any easement or other legal or land interest of National Grid or affect the provisions of any enactment or agreement regulating the relations between National Grid and the undertaker in respect of any apparatus laid or erected in land belonging to or secured by the undertaker, the undertaker must as National Grid reasonably requires enter into such deeds of consent upon such terms and conditions as may be agreed between National Grid and the undertaker acting reasonably and which must be no less favourable on the whole to National Grid unless otherwise agreed by National Grid, and it will be the responsibility of the undertaker to procure and/or secure the consent and entering into of such deeds and variations by all other third parties with an interest in the land at that time who are affected by such authorised works. (3) Save where otherwise agreed in writing between National Grid and the undertaker, the undertaker and National Grid agree that where there is any inconsistency or duplication between the provisions set out in this Part of this Schedule relating to the relocation and/or removal of apparatus/including but not limited to the payment of costs and expenses relating to such relocation and/or removal of apparatus) and the provisions of any existing easement, rights, agreements and licences granted, used, enjoyed or exercised by National Grid and/or other enactments relied upon by National Grid as of right or other use in relation to the apparatus, then the provisions in this Schedule shall prevail. (4) Any agreement or consent granted by National Grid under paragraph 90 or any other paragraph of this Part of this Schedule, shall not be taken to constitute agreement under sub-paragraph (1). Removal of apparatus 89 (1) If, in the exercise of the powers conferred by this Order, the undertaker acquires any interest in or possesses temporarily any land in which any apparatus is placed, that apparatus must not be removed under this Part of this Schedule and any right of National Grid to maintain that apparatus in that land must not be extinguished until alternative apparatus has been constructed, and is in operation to the reasonable satisfaction of National Grid in accordance with sub-paragraphs (2) to (5). (2) If, for the purpose of executing any works in, on, under or over any land purchased, held, appropriated or used under this Order, the undertaker requires the removal of any apparatus placed in that land, it must give to National Grid advance written notice of that requirement, together with a plan of the work proposed, and of the proposed position of the alternative apparatus to be provided or constructed and in that case (or if in consequence of the exercise of any of the powers conferred by this Order National Grid reasonably needs to remove any of its apparatus) the undertaker must, subject to sub-paragraph (3), secure any necessary consents for the alternative apparatus and afford to National Grid to its satisfaction (taking into account paragraph 90(1) below) the necessary facilities and rights— (a) for the construction of alternative apparatus in other land of or land secured by the undertaker; and (b) subsequently for the maintenance of that apparatus. (3) If alternative apparatus or any part of such apparatus is to be constructed elsewhere than in other land of or land secured by the undertaker, or the undertaker is unable to afford such facilities and rights as are mentioned in sub-paragraph (2), in the land in which the alternative apparatus or part of such apparatus is to be constructed, National Grid may in its sole discretion, on receipt of a written notice to that effect from the undertaker, take such steps as are reasonable in the circumstances to assist the undertaker to obtain the necessary facilities and rights in the land in which the alternative apparatus is to be constructed save that this obligation shall not extend to the requirement for National Grid to use its compulsory purchase powers to this end unless it elects to so do. (4) Any alternative apparatus to be constructed in land of or land secured by the undertaker under this Part of this Schedule must be constructed in such manner and in such line or situation as may be agreed between National Grid and the undertaker. (5) National Grid must, after the alternative apparatus to be provided or constructed has been agreed, and subject to a written diversion agreement having been entered into between the parties and the grant to National Grid of any such facilities and rights as are referred to in sub-paragraph (2) or (3), proceed without unnecessary delay to construct and bring into operation the alternative apparatus and subsequently to remove any apparatus required by the undertaker to be removed under the provisions of this Part of this Schedule. Facilities and rights for alternative apparatus 90 (1) Where, in accordance with the provisions of this Part of this Schedule, the undertaker affords to or secures for National Grid facilities and rights in land for the construction, use, maintenance and protection of alternative apparatus in substitution for apparatus to be removed, those facilities and rights must be granted upon such terms and conditions as may be agreed between the undertaker and National Grid and must be no less favourable on the whole to National Grid than the facilities and rights enjoyed by it in respect of the apparatus to be removed unless otherwise agreed by National Grid. (2) If the facilities and rights to be afforded by the undertaker in respect of any alternative apparatus, and the terms and conditions subject to which those facilities and rights are to be granted, are less favourable on the whole to National Grid than the facilities and rights enjoyed by it in respect of the apparatus to be removed and the terms and conditions to which those facilities and rights are subject the matter may be referred to arbitration in accordance with paragraph 97 (arbitration) of this Part of this Schedule and the arbitrator must make such provision for the payment of compensation by the undertaker to National Grid as appears to the arbitrator to be reasonable having regard to all the circumstances of the particular case. Retained apparatus: protection 91 (1) Not less than 56 days before the commencement of any specified works, the undertaker must submit to National Grid a plan of the works to be executed and seek from National Grid details of the underground extent of their electricity assets. (2) In relation to specified works the plan to be submitted to National Grid under sub-paragraph (1) must include a method statement and describe— (a) the exact position of the works; (b) the level at which these are proposed to be constructed or renewed; (c) the manner of their construction or renewal including details of excavation, positioning of plant; (d) the position of all apparatus; (e) by way of detailed drawings, every alteration proposed to be made to or close to any such apparatus; (f) any intended maintenance regimes; (g) an assessment of risks of rise of earth issues; and (h) a ground monitoring scheme, where required. (3) In relation to any works which will or may be situated on, over, under or within 10 metres of any part of the foundations of an electricity tower or between any two or more electricity towers, the plan to be submitted under sub-paragraph (1) must, in addition to the matters set out in sub-paragraph (2), include a method statement describing— (a) details of any cable trench design including route, dimensions, clearance to pylon foundations; (b) demonstration that pylon foundations will not be affected prior to, during and post construction; (c) details of load bearing capacities of trenches; (d) details of any cable installation methodology including access arrangements, jointing bays and backfill methodology; (e) a written management plan for high voltage hazard during construction and ongoing maintenance of any cable route; (f) written details of the operations and maintenance regime for any cable, including frequency and method of access; (g) assessment of earth rise potential if reasonably required by National Grid’s engineers; and (h) evidence that trench bearing capacity is to be designed to support overhead line construction traffic of up to and including 26 tonnes in weight. (4) The undertaker must not commence any works to which sub-paragraphs (2) or (3) apply until National Grid has given written approval of the plan so submitted. (5) Any approval of National Grid required under sub-paragraph (4)— (a) may be given subject to reasonable conditions for any purpose mentioned in sub-paragraph (6) or (8); and (b) must not be unreasonably withheld or delayed. (6) In relation to any work to which sub-paragraphs (2) or (3) apply, National Grid may require such modifications to be made to the plans as may be reasonably necessary for the purpose of securing its apparatus against interference or risk of damage, for the provision of protective works or for the purpose of providing or securing proper and convenient means of access to any apparatus. (7) Works executed under sub-paragraphs (2) or (3) must be executed in accordance with the plan, submitted under sub-paragraph (1) or as relevant sub-paragraph (6) as approved or as amended from time to time by agreement between the undertaker and National Grid and in accordance with such reasonable requirements as may be made in accordance with sub-paragraphs (6) or (8) by National Grid for the alteration or otherwise for the protection of the apparatus, or for securing access to it, and National Grid will be entitled to watch and inspect the execution of those works. (8) Where National Grid requires any protective works to be carried out by itself or by the undertaker (whether of a temporary or permanent nature) such protective works, inclusive of any measures or schemes required and approved as part of the plan approved pursuant to this paragraph, must be carried out to National Grid’s satisfaction prior to the commencement of any authorised works for which protective works are required and National Grid shall give notice of its requirement for such works within 42 days of the date of submission of a plan pursuant to this paragraph (except in an emergency). (9) If National Grid in accordance with sub-paragraphs (6) or (8) and in consequence of the works proposed by the undertaker, reasonably requires the removal of any apparatus and gives written notice to the undertaker of that requirement, sub-paragraphs (1) to (3) and (6) to (8) shall apply as if the removal of the apparatus had been required by the undertaker under paragraph 89(2). (10) Nothing in this paragraph precludes the undertaker from submitting at any time or from time to time, but in no case less than 56 days before commencing the execution of any authorised works, a new plan, instead of the plan previously submitted, and having done so the provisions of this paragraph shall apply to and in respect of the new plan. (11) The undertaker will not be required to comply with sub-paragraph (1) where it needs to carry out emergency works as defined in the 1991 Act but in that case it must give to National Grid notice as soon as is reasonably practicable and a plan of those works and must comply with sub-paragraphs (6), (7) and (8) insofar as is reasonably practicable in the circumstances and comply with sub-paragraph (11) at all times. (12) At all times when carrying out any works authorised under the Order, the undertaker must comply with National Grid’s policies for development near overhead lines EN43-8 and HSE’s guidance note 6 “Avoidance of Danger from Overhead Lines”. Expenses 92 (1) Save where otherwise agreed in writing between National Grid and the undertaker and subject to the following provisions of this paragraph, the undertaker must pay to National Grid within 30 days of receipt of an itemised invoice or claim from National Grid all charges, costs and expenses reasonably anticipated within the following three months or reasonably and properly incurred by National Grid in, or in connection with, the inspection, removal, relaying or replacing, alteration or protection of any apparatus or the construction of any new or alternative apparatus which may be required in consequence of the execution of any authorised works including without limitation— (a) any costs reasonably incurred by or compensation properly paid by National Grid in connection with the acquisition of rights or the exercise of statutory powers for such apparatus including without limitation all costs incurred by National Grid as a consequence of National Grid— (i) using its own compulsory purchase powers to acquire any necessary rights under paragraph 89(3); or (ii) exercising any compulsory purchase powers in the Order transferred to or benefitting National Grid; (b) in connection with the cost of the carrying out of any diversion work or the provision of any alternative apparatus, where no written diversion agreement is otherwise in place; (c) the cutting off of any apparatus from any other apparatus or the making safe of redundant apparatus; (d) the approval of plans; (e) the carrying out of protective works, plus a capitalised sum to cover the cost of maintaining and renewing permanent protective works; and (f) the survey of any land, apparatus or works, the inspection and monitoring of works or the installation or removal of any temporary works reasonably necessary in consequence of the execution of any such works referred to in this Part of this Schedule. (2) There will be deducted from any sum payable under sub-paragraph (1) the value of any apparatus removed under the provisions of this Part of this Schedule and which is not re-used as part of the alternative apparatus, that value being calculated after removal. (3) If in accordance with the provisions of this Part of this Schedule— (a) apparatus of better type, of greater capacity or of greater dimensions is placed in substitution for existing apparatus of worse type, of smaller capacity or of smaller dimensions; or (b) apparatus (whether existing apparatus or apparatus substituted for existing apparatus) is placed at a depth greater than the depth at which the existing apparatus was situated, and the placing of apparatus of that type or capacity or of those dimensions or the placing of apparatus at that depth, as the case may be, is not agreed by the undertaker or, in default of agreement, is not determined by arbitration in accordance with paragraph 97 (arbitration) to be necessary, then, if such placing involves cost in the construction of works under this Part of this Schedule exceeding that which would have been involved if the apparatus placed had been of the existing type, capacity or dimensions, or at the existing depth, as the case may be, the amount which apart from this sub-paragraph would be payable to National Grid by virtue of sub-paragraph (1) will be reduced by the amount of that excess save to the extent that it is not possible in the circumstances to obtain the existing type of apparatus at the same capacity and dimensions or place at the existing depth in which case full costs will be borne by the undertaker. (4) For the purposes of sub-paragraph (3)— (a) an extension of apparatus to a length greater than the length of existing apparatus will not be treated as a placing of apparatus of greater dimensions than those of the existing apparatus; and (b) where the provision of a joint in a pipe or cable is agreed, or is determined to be necessary, the consequential provision of a jointing chamber or of a manhole will be treated as if it also had been agreed or had been so determined. (5) Any amount which apart from this sub-paragraph would be payable to National Grid in respect of works by virtue of sub-paragraph (1) will, if the works include the placing of apparatus provided in substitution for apparatus placed more than 7 years and 6 months earlier so as to confer on National Grid any financial benefit by deferment of the time for renewal of the apparatus in the ordinary course, be reduced by the amount which represents that benefit. Indemnity 93 (1) Subject to sub-paragraphs (2) and (3), if by reason or in consequence of the construction of any works authorised by this Part of this Schedule or in consequence of the construction, use maintenance or failure of any of the authorised works by or on behalf of the undertaker or in consequence of any act or default of the undertaker (or any person employed or authorised by him) in the course of carrying out such works, including without limitation works carried out by the undertaker under this Part of this Schedule or any subsidence resulting from any of these works, any damage is caused to any apparatus or alternative apparatus (other than apparatus the repair of which is not reasonably necessary in view of its intended removal for the purposes of the authorised works) or property of National Grid, or there is any interruption in any service provided, or in the supply of any goods, by National Grid, or National Grid becomes liable to pay any amount to any third party, the undertaker will— (a) bear and pay on demand accompanied by an invoice or claim from National Grid the cost reasonably and properly incurred by National Grid in making good such damage or restoring the supply; and (b) indemnify National Grid for any other expenses, loss, demands, proceedings, damages, claims, penalty or costs incurred by or recovered from National Grid, by reason or in consequence of any such damage or interruption or National Grid becoming liable to any third party and including STC Claims or an Incentive Deduction other than arising from any default of National Grid. (2) The fact that any act or thing may have been done by National Grid on behalf of the undertaker or in accordance with a plan approved by National Grid or in accordance with any requirement of National Grid or under its supervision will not (unless sub-paragraph (3) applies), excuse the undertaker from liability under the provisions of this sub-paragraph (1) unless National Grid fails to carry out and execute the works properly with due care and attention and in a skilful and workman like manner or in a manner that does not accord with the approved plan. (3) Nothing in sub-paragraph (1) shall impose any liability on the undertaker in respect of— (a) any damage or interruption to the extent that it is attributable to the neglect or default of National Grid, its officers, servants, contractors or agents; (b) any authorised works and/or any other works authorised by this Part of this Schedule carried out by National Grid as an assignee, transferee or lessee of the undertaker with the benefit of the Order pursuant to section 156 of the Planning Act 2008 or article 35 (consent to transfer the benefit of the Order) subject to the proviso that once such works become apparatus (“new apparatus”), any authorised works yet to be executed and not falling within this sub-paragraph 93(3)(b) will be subject to the full terms of this Part of this Schedule including this paragraph 93; and/or (c) any indirect or consequential loss of any third party (including but not limited to loss of use, revenue, profit, contract, production, increased cost of working or business interruption) arising from any such damage or interruption, which is not reasonably foreseeable; (4) National Grid must give the undertaker reasonable notice of any such third party claim or demand and no settlement, admission of liability or compromise must, unless payment is required in connection with a statutory compensation scheme, be made without first consulting the undertaker and considering their representations. (5) National Grid must, in respect of any matter covered by the indemnity given by the undertaker in this paragraph, at all times act reasonably and in the same manner as it would as if settling third party claims on its own behalf from its own funds. (6) National Grid must use its reasonable endeavours to mitigate and to minimise any costs, expenses, loss, demands, and penalties to which the indemnity under this paragraph applies where it is within National Grid’s reasonable ability and control to do so and which expressly excludes any obligation to mitigate liability arising from third parties which is outside of National Grid’s control and if reasonably requested to do so by the undertaker National Grid must provide an explanation of how the claim has been minimised, where relevant. (7) Not to commence construction (and not to permit the commencement of such construction) of the authorised works on any land owned by National Grid or in respect of which National Grid has an easement or wayleave for its apparatus or any other interest or to carry out any works within 15 metres of National Grid’s apparatus until the following conditions are satisfied: (a) unless and until National Grid is satisfied acting reasonably (but subject to all necessary regulatory constraints) that the undertaker has first provided the acceptable security (and provided evidence that it shall maintain such acceptable security for the construction period of the authorised works referred to in sub-paragraph (7) from the proposed date of commencement of construction of those works) and National Grid has confirmed the same to the undertaker in writing; and (b) unless and until National Grid is satisfied acting reasonably (but subject to all necessary regulatory constraints) that the undertaker has procured acceptable insurance (and provided evidence to National Grid that it shall maintain such acceptable insurance for the construction period of the authorised works referred to in sub-paragraph (7) from the proposed date of commencement of construction of those works) and National Grid has confirmed the same in writing to the undertaker. (8) In the event that the undertaker fails to comply with paragraph 93(7) of this Part of this Schedule, nothing in this Part of this Schedule shall prevent National Grid from seeking injunctive relief (or any other equitable remedy) in any court of competent jurisdiction. Enactments and agreements 94 Save to the extent provided for to the contrary elsewhere in this Part of this Schedule or by agreement in writing between National Grid and the undertaker, nothing in this Part of this Schedule affects the provisions of any enactment or agreement regulating the relations between the undertaker and National Grid in respect of any apparatus laid or erected in land belonging to the undertaker on the date on which this Order is made. Co-operation 95 (1) Where in consequence of the proposed construction of any part of the authorised works, the undertaker or National Grid requires the removal of apparatus under paragraph 89(2) or National Grid makes requirements for the protection or alteration of apparatus under paragraph 91, the undertaker shall use its best endeavours to co-ordinate the execution of the works in the interests of safety and the efficient and economic execution of the authorised works and taking into account the need to ensure the safe and efficient operation of National Grid’s undertaking and National Grid shall use its best endeavours to co-operate with the undertaker for that purpose. (2) For the avoidance of doubt whenever National Grid’s consent, agreement or approval is required in relation to plans, documents or other information submitted by the undertaker or the taking of action by the undertaker, it must not be unreasonably withheld or delayed. Access 96 If in consequence of the agreement reached in accordance with paragraph 88(1) or the powers granted under this Order the access to any apparatus is materially obstructed, the undertaker must provide such alternative means of access to such apparatus as will enable National Grid to maintain or use the apparatus no less effectively than was possible before such obstruction. Arbitration 97 Save for differences or disputes arising under paragraphs 89(2), 89(4), 90(1) and 91 any difference or dispute arising between the undertaker and National Grid under this Part of this Schedule must, unless otherwise agreed in writing between the undertaker and National Grid, be determined by arbitration in accordance with article 42 (arbitration). Notices 98 Notwithstanding 45 (service of notices), any plans submitted to National Grid by the undertaker pursuant to paragraph 91 must be submitted using the LSBUD system (https://lsbud.co.uk/) or to such other address as National Grid may from time to time appoint instead for that purpose and notify to the undertaker in writing. PART 8 FOR THE PROTECTION OF NORTHERN POWERGRID (YORKSHIRE) PLC 99 For the protection of Northern Powergrid (Yorkshire) PLC the following provisions have effect, unless otherwise agreed in writing between the undertaker and Northern Powergrid. 100 In this Part of this Schedule— “the 1991 Act” means the New Roads and Street Works Act 1991; “alternative apparatus” means alternative apparatus adequate to enable Northern Powergrid to fulfil its statutory functions in a manner not less efficient than previously; “apparatus” means apparatus (as defined in article 2 of the Order) belonging to or maintained by Northern Powergrid and includes any structure in which apparatus is or is to be lodged or which gives or will give access to apparatus; “authorised works” means so much of the works authorised by this Order which affect existing Northern Powergrid’s apparatus within the Order limits; “functions” includes powers and duties; “in”, in a context referring to apparatus or alternative apparatus in land, includes a reference to apparatus or alternative apparatus under, over or upon land; “Order” means the East Yorkshire Solar Farm Order 2025; “Order limits” means as defined in article 2 of the Order; “Northern Powergrid” means Northern Powergrid (Yorkshire) PLC (Company Number 04112320) whose registered office is at Lloyds Court, 78 Grey Street, Newcastle upon Tyne, NE1 6AF; and “plan” includes all designs, drawings, specifications, method statements, soil reports, programmes, calculations, risk assessments and other documents that are reasonably necessary properly and sufficiently to describe the works to be executed and must include any measures proposed by the undertaker to ensure the grant of sufficient land or rights in land necessary to mitigate the impacts of the works on the apparatus or Northern Powergrid’s undertaking within the Order limits. 101 This Part of this Schedule does not apply to apparatus in respect of which the relations between the undertaker and Northern Powergrid are regulated by the provisions of Part 3 (street works in England and Wales) of the 1991 Act. 102 Regardless of the temporary prohibition or restriction of use of streets under the powers conferred by article 11 (temporary closure of streets and public rights of way), the undertaker must not prevent Northern Powergrid from taking all necessary access across any such street and to execute and do all such works and things in, upon or under any such street as may be reasonably necessary or desirable to enable it to maintain any apparatus which at the time of the prohibition or restriction was in that street. 103 Regardless of any provision in the Order or anything shown on the land plans, or contained in the book of reference, the undertaker must not acquire any apparatus, or override any easement or other interest of Northern Powergrid otherwise than by agreement with Northern Powergrid, such agreement not to be unreasonably withheld or delayed. 104 Regardless of any provision in the Order or anything shown on the land plans or contained in the book of reference, the undertaker must not interfere with any communications cables or equipment used by Northern Powergrid in relation to its apparatus or acquire or interfere with rights or interests supporting the use, maintenance or renewal of such equipment including any easements other than by agreement of Northern Powergrid (such agreement not to be unreasonably withheld or delayed) and having regard to Northern Powergrid’s existing and known future requirements for such land or interests. 105 (1) If, in the exercise of the powers conferred by this Order, the undertaker acquires any interest in any land in which any apparatus is placed or over which access to any apparatus is enjoyed or requires that Northern Powergrid’s apparatus is relocated or diverted, that apparatus must not be removed under this Part of this Schedule, and any right of Northern Powergrid to maintain that apparatus in that land and to gain access to it must not be extinguished, until alternative apparatus has been constructed and is in operation, and access to it has been provided pursuant to a completed easement, or other form of written agreement in a form reasonably acceptable to Northern Powergrid which shall include rights to retain and subsequently maintain the apparatus being replaced or diverted for the lifetime of that alterative apparatus, all to the reasonable satisfaction of Northern Powergrid in accordance with sub-paragraphs (2) to (5). (2) If, for the purpose of executing any works in, on or under any land purchased, held, appropriated or used under this Order, the undertaker requires the removal of any apparatus placed in that land, the undertaker must give to Northern Powergrid 42 days’ advance written notice of that requirement, together with a plan and section of the work proposed, and of the proposed position of the alternative apparatus to be provided or constructed and in that case (or if in consequence of the exercise of any of the powers conferred by this Order Northern Powergrid reasonably needs to remove any of its apparatus) the undertaker must, subject to sub-paragraph (3), afford to Northern Powergrid the necessary facilities and rights for the construction of alternative apparatus in other land of the undertaker and subsequently for the maintenance of that apparatus. (3) If alternative apparatus or any part of such apparatus is to be constructed elsewhere than in other land of the undertaker, or the undertaker is unable to afford such facilities and rights as are mentioned in sub-paragraph (2), in the land in which the alternative apparatus or part of such apparatus is to be constructed. (a) the undertaker must in the first instance use reasonable endeavours to acquire through voluntary negotiations all necessary land interests or rights as Northern Powergrid may reasonably require for the relocation and construction of alternative apparatus and must use reasonable endeavours to procure through voluntary negotiations all necessary rights to access and maintain Northern Powergrid’s apparatus and alternative apparatus thereafter the terms of such access and maintenance to be agreed by Northern Powergrid (acting reasonably); (b) in the event that the undertaker is not able to procure the necessary land interest or rights referred to in sub-paragraph 105(3)(a) Northern Powergrid must, on receipt of a written notice to that effect from the undertaker and subject to paragraph 108, as soon as reasonably practicable use reasonable endeavours to procure the necessary facilities and rights in the land in which the alternative apparatus is to be constructed save that this obligation shall not extend to the requirement for Northern Powergrid to use its compulsory purchase powers to this end; and (c) in the event that neither the undertaker nor Northern Powergrid can acquire all necessary land interest or rights which Northern Powergrid may reasonably require for the relocation and construction of alternative apparatus pursuant to paragraph 105(3)(a) and/or (b), the undertaker shall use its compulsory purchase powers under the Order (where available) unless otherwise agreed by arbitration. (4) Any alternative apparatus to be constructed in land of the undertaker under this Part of this Schedule must be constructed in such manner and in such line or situation as may be agreed between Northern Powergrid and the undertaker or in default of agreement settled by arbitration in accordance with article 42 of the Order. (5) Northern Powergrid must, after the alternative apparatus to be provided or constructed has been agreed or settled by arbitration in accordance with article 42 (arbitration) of the Order, and after the grant to Northern Powergrid of any such facilities and rights as are referred to in sub-paragraph (2) or (3), proceed without unnecessary delay to construct and bring into operation the alternative apparatus and subsequently to remove any apparatus required by the undertaker to be removed under the provisions of this Part of this Schedule. 106 (1) Where, in accordance with the provisions of this Part of this Schedule, the undertaker affords to Northern Powergrid facilities and rights for the construction and maintenance in land of the undertaker of alternative apparatus in substitution for apparatus to be removed, those facilities and rights must be granted upon such terms and conditions as may be agreed between the undertaker and Northern Powergrid or in default of agreement settled by arbitration in accordance with article 42 (interpretation) of the Order. (2) If the facilities and rights to be afforded by the undertaker in respect of any alternative apparatus, and the terms and conditions subject to which those facilities and rights are to be granted, are in the opinion of the arbitrator less favourable on the whole to Northern Powergrid than the facilities and rights enjoyed by it in respect of the apparatus to be removed and the terms and conditions to which those facilities and rights are subject, the arbitrator must make such provision for the payment of compensation by the undertaker to Northern Powergrid as appears to the arbitrator to be reasonable having regard to all the circumstances of the particular case. 107 (1) Not less than 56 days before starting the execution of any works in, on or under any land purchased, held, appropriated or used under the Order that are near to (including conducting any activities whether intentionally or unintentionally, through for example ground or machinery collapse, which may affect Northern Powergrid’s apparatus or encroach on safety distances to live equipment) or will or may affect, any apparatus the removal of which has not been required by the undertaker under paragraph 105(2), the undertaker must submit to Northern Powergrid a plan, section and description of the works to be executed and any such information as Northern Powergrid reasonably requires relating to those works. (2) Those works must be executed only in accordance with the plan, section and description submitted under sub-paragraph (1) and in accordance with such reasonable requirements as may be made in accordance with sub-paragraph (3) by Northern Powergrid for the alteration or otherwise for the protection of the apparatus, or for securing access to it, and Northern Powergrid is entitled to watch and inspect the execution of those works. (3) Any requirements made by Northern Powergrid under sub-paragraph (2) must be made within a period of 35 days beginning with the date on which a plan, section and description under sub-paragraph 107(1) are submitted to it. (4) If Northern Powergrid in accordance with sub-paragraph (2) and in consequence of the works proposed by the undertaker, reasonably requires the removal of any apparatus and gives written notice to the undertaker of that requirement, sub-paragraphs (1) to (3) apply as if the removal of the apparatus had been required by the undertaker under paragraph 105. (5) Nothing in this paragraph precludes the undertaker from submitting at any time or from time to time, but in no case less than 35 days before commencing the execution of any works, a new plan, section and description instead of the plan, section and description previously submitted, and having done so the provisions of this paragraph apply to and in respect of the new plan, section and description. (6) The undertaker is not required to comply with sub-paragraph (1) in a case of emergency but in that case it must give to Northern Powergrid notice as soon as is reasonably practicable and a plan, section and description of those works as soon as reasonably practicable subsequently and must comply with sub-paragraph (2) in so far as is reasonably practicable in the circumstances. 108 (1) Subject to the following provisions of this paragraph, the undertaker must repay to Northern Powergrid within 51 days of receipt of an itemised invoice or claim the reasonable and proper expenses, costs or charges incurred by Northern Powergrid in, or in connection with, the inspection, removal, alteration or protection of any apparatus or the construction of any new apparatus which may be required in consequence of the execution of any such works as are referred to in paragraphs 105(2) and 105(3) including within limitation: (a) any costs reasonably incurred or compensation properly paid in connection with the acquisition of rights or the exercise of statutory powers for such apparatus including without limitation in the event that it is agreed Northern Powergrid elects to use compulsory purchase powers to acquire any necessary rights under paragraph 105(3) all costs reasonably incurred as a result of such action; (b) in connection with the cost of the carrying out of any diversion work or the provision of any alternative apparatus; (c) the cutting off of any apparatus from any other apparatus or the making safe of redundant apparatus; (d) the approval of plans; (e) the carrying out of protective works, plus a capitalised sum to cover the reasonable cost of adequately maintaining and renewing permanent protective works; and (f) the survey of any land, apparatus or works, the inspection and monitoring of works or the installation or removal of any temporary works reasonably necessary in consequence of the execution of any such works referred to in this Part of this Schedule). (2) Where any payment falls due pursuant to paragraph 108(1), Northern Powergrid must: (a) provide an itemised invoice or reasonable expenses claim to the undertaker; (b) provide ‘reminder letters’ to the undertaker for payment to be made within the fifty days on the following days after the invoice or reasonable expenses claim to the undertaker: (i) 15 days (‘reminder letter 1’); (ii) 29 days (‘reminder letter 2’); and (iii) 43 days (‘reminder letter 3’); (c) be entitled to commence debt proceedings to recover any unpaid itemised invoice or reasonable expenses claim after fifty one days of receipt of the same where payment has not been made. (3) There is to be deducted from any sum payable under sub-paragraph (1) the value of any apparatus removed under the provisions of this Part of this Schedule, that value being calculated after removal and for the avoidance of doubt, if the apparatus removed under the provisions of this Part of this Schedule has nil value, no sum will be deducted from the amount payable under sub-paragraph (1) if in accordance with the provisions of this Part of this Schedule— (a) apparatus of better type, of greater capacity or of greater dimensions is placed in substitution for existing apparatus of worse type, of smaller capacity or of smaller dimensions; or (b) apparatus (whether existing apparatus or apparatus substituted for existing apparatus) is placed at a depth greater than the depth at which the existing apparatus was, and the placing of apparatus of that type or capacity or of those dimensions or the placing of apparatus at that depth, as the case may be, is not agreed by the undertaker or, in default of agreement, is not determined by arbitration in accordance with article 42 (arbitration) of the Order to be necessary, then, if such placing involves cost in the construction of works under this Part of this Schedule exceeding that which would have been involved if the apparatus placed had been of the existing type, capacity or dimensions, or at the existing depth, as the case may be, the amount which apart from this sub-paragraph would be payable to Northern Powergrid by virtue of sub-paragraph (1) is to be reduced by the amount of that excess, save where it is not possible on account of reasonable project time limits communicated in a reasonable timeframe to the undertaker and/or supply issues to obtain the existing type of operations, capacity, dimensions or place at the existing depth in which case full costs shall be borne by the undertaker. (4) For the purposes of sub-paragraph (3)— (a) an extension of apparatus to a length greater than the length of existing apparatus is not to be treated as a placing of apparatus of greater dimensions than those of the existing apparatus where such extension is required in consequence of the execution of any such works as are referred to in paragraph 105(2); and (b) where the provision of a joint in a cable is agreed, or is determined to be necessary, the consequential provision of a jointing chamber or of a manhole is to be treated as if it also had been agreed or had been so determined. 109 (1) Subject to sub-paragraphs (2) and (3), if by reason or in consequence of the construction of any of the works referred to in in paragraph 105(2), or in consequence of the, maintenance or failure of any of the authorised works by or on behalf of the undertaker or in consequence of any act or default of the undertaker (or any person employed or authorised by it) in the course of carrying out such works, including without limitation works carried out by the undertaker under this Schedule or any subsidence resulting from any of these works any damage is caused to any apparatus or alternative apparatus (other than apparatus the repair of which is not reasonably necessary in view of its intended removal for the purposes of those works) or property of Northern Powergrid, or there is any interruption in any service provided by Northern Powergrid, or Northern Powergrid becomes liable to pay any amount to a third party as a consequence of any default, negligence or omission by the undertaker in carrying out the authorised works, the undertaker must— (a) bear and pay the cost reasonably incurred by Northern Powergrid in making good such damage or restoring the supply; and (b) indemnify Northern Powergrid for other reasonable expenses, loss, damages, penalty, proceedings, claims or costs incurred by or recovered from Northern Powergrid, by reason or in consequence of any such damage or interruption or Northern Powergrid becoming liable to any third party. (2) Nothing in sub-paragraph (1) imposes any liability on the undertaker with respect to— (a) any damage or interruption to the extent that it is attributable to the act, neglect or default of Northern Powergrid, its officers, employees, servants, contractors or agents. (3) Northern Powergrid must give the undertaker reasonable notice of any such claim or demand and no settlement or compromise is to be made without the consent of the undertaker which, if it withholds such consent, has the sole conduct of any settlement or compromise or of any proceedings necessary to resist the claim or demand. (4) Northern Powergrid must use its reasonable endeavours to mitigate in whole or in part and to minimise any costs, expenses, loss, demands, and penalties to which the indemnity under this paragraph 109 applies. If requested to do so by the undertaker, Northern Powergrid must provide an explanation of how the claim has been minimised or details to substantiate any cost or compensation claimed pursuant to sub-paragraph (1). The undertaker shall only be liable under this paragraph 109 for claims reasonably incurred by Northern Powergrid. (5) Subject to sub-paragraphs (3) and (4), the fact that any act or thing may have been done by Northern Powergrid on behalf of the undertaker or in accordance with a plan approved by Northern Powergrid or in accordance with any requirement of Northern Powergrid as a consequence of the authorised development or under its supervision will not (unless sub-paragraph (2) applies), excuse the undertaker from liability under the provisions of this sub-paragraph (5) where the undertaker fails to carry out and execute the works properly with due care and attention and in a skilful and workman like manner or in a manner that does not materially accord with the approved plan or as otherwise agreed between the undertaker and the Northern Powergrid. 110 Nothing in this Part of this Schedule affects the provisions of any enactment or agreement regulating the relations between the undertaker and Northern Powergrid in respect of any apparatus laid or erected in land belonging to the undertaker on the date on which the Order is made. 111 Any difference under the provisions of this Part of the Schedule, unless otherwise agreed is to be referred to and settled by arbitration in accordance with article 42 (arbitration) of the Order. 112 Where in consequence of the proposed construction of any of the authorised development, the undertaker or Northern Powergrid requires the removal of apparatus under paragraph 105 or otherwise or Northern Powergrid makes requirements for the protection or alteration of apparatus under paragraph 107, the undertaker shall use reasonable endeavours to co-ordinate the execution of the works in the interests of safety and the need to ensure the safe and efficient operation of Northern Powergrid’s apparatus taking into account the undertaker’s desire for the efficient and economic execution of the authorised development and the undertaker and Northern Powergrid shall use reasonable endeavours to co-operate with each other for those purposes. 113 If in consequence of an agreement reached in accordance with paragraph 102 or the powers granted under this Order the access to any apparatus or alternative apparatus is materially obstructed, the undertaker shall provide such alternative means of access to such apparatus or alternative apparatus as will enable Northern Powergrid to maintain or use the said apparatus no less effectively than was possible before such obstruction. 114 The plans submitted to Northern Powergrid by the undertaker pursuant to this Part of the Schedule must be sent to Northern Powergrid at property@northernpowergrid.com or such other address as Northern Powergrid may from time to time appoint instead for that purpose and notify to the undertaker in writing. 115 Prior to carrying out any works within the Order limits, Northern Powergrid must give written notice of the proposed works to the undertaker, such notice to include full details of the location of the proposed works, their anticipated duration, access arrangements, depths of the works, and any other information that may impact upon the works consented by the Order. 116 Where practicable, the Undertaker and Northern Powergrid will make reasonable efforts to liaise and co-operate in respect of information that is relevant to the safe and efficient construction operation and maintenance of the authorised development. Such liaison shall be carried out where any works are: (a) within 15m of any above ground apparatus; or (b) within 15m of any apparatus and are to a depth of between 0 – 4m below ground level. PART 9 FOR THE PROTECTION OF NATIONAL GAS TRANSMISSION PLC Application 117 (1) For the protection of National Gas as referred to in this Part of this Schedule the following provisions have effect, unless otherwise agreed in writing between the undertaker and National Gas. (2) Subject to sub-paragraph (3) or to the extent otherwise agreed in writing between the undertaker and National Gas, where the benefit of this Order is transferred or granted to another person under article 35 (consent to transfer the benefit of the Order)— (a) any agreement of the type mentioned in sub-paragraph (1) has effect as if it had been made between National Gas and the transferee or grantee (as the case may be); and (b) written notice of the transfer or grant must be given to National Gas on or before the date of that transfer or grant. (3) Sub-paragraph (2) does not apply where the benefit of the Order is transferred or granted to National Gas (but without prejudice to paragraph 127(3)(b)). Interpretation 118 In this Part of this Schedule— “the 1991 Act” means the New Roads and Street Works Act 1991; “acceptable credit provider” means a bank or financial institution with a credit rating that is not lower than: (i) “A-” if the rating is assigned by Standard & Poor’s Ratings Group or Fitch Ratings; and (ii) “A3” if the rating is assigned by Moody’s Investors Services Inc.; “acceptable insurance” means general third party liability insurance effected and maintained by the undertaker with a combined property damage and bodily injury limit of indemnity of not less than £50,000,000.00 (fifty million pounds) per occurrence or series of occurrences arising out of one event. Such insurance shall be maintained: (a) during the construction period of the authorised works; and (b) after the construction period of the authorised works in respect of any use and maintenance of the authorised development by or on behalf of the undertaker which constitute specified works and arranged with an insurer whose security/credit rating meets the same requirements as an “acceptable credit provider”, such insurance shall include (without limitation): a waiver of subrogation and an indemnity to principal clause in favour of National Gas; and pollution liability for third party property damage and third party bodily damage arising from any pollution/contamination event with a (sub)limit of indemnity of not less than £10,000,000.00 (ten million pounds) per occurrence or series of occurrences arising out of one event or £20,000,000.00 (twenty million pounds) in aggregate; “acceptable security” means either: a parent company guarantee from a parent company in favour of National Gas to cover the undertaker’s liability to National Gas to a total liability cap of not less than £50,000,000.00 (fifty million pounds) (in a form reasonably satisfactory to National Gas and where required by National Gas, accompanied with a legal opinion confirming the due capacity and authorisation of the parent company to enter into and be bound by the terms of such guarantee); or a bank bond or letter of credit from an acceptable credit provider in favour of National Gas to cover the undertaker’s liability to National Gas for an amount of not less than £10,000,000.00 (ten million pounds) per asset per event up to a total liability cap of £50,000,000.00 (fifty million pounds) (in a form reasonably satisfactory to National Gas); “alternative apparatus” means appropriate alternative apparatus to the satisfaction of National Gas to enable National Gas to fulfil its statutory functions in a manner no less efficient than previously; “apparatus” means any mains, pipes or other apparatus belonging to or maintained by National Gas for the purposes of gas supply together with any replacement apparatus and such other apparatus constructed pursuant to the Order that becomes operational apparatus of National Gas for the purposes of transmission, distribution and/or supply and includes any structure in which apparatus is or will be lodged or which gives or will give access to apparatus; “authorised works” has the same meaning as is given to the term “authorised development” in article 2(1) of this Order and includes any associated development authorised by the Order and for the purposes of this Part of this Schedule includes the use and maintenance of the authorised works and construction of any works authorised by this Schedule; “commence” and “commencement” in this Part of this Schedule shall include any below ground surveys, monitoring, ground work operations or the receipt and erection of construction plant and equipment; “deed of consent” means a deed of consent, crossing agreement, deed of variation or new deed of grant agreed between the parties acting reasonably in order to vary or replace existing easements, agreements, enactments and other such interests so as to secure land rights and interests as are necessary to carry out, maintain, operate and use the apparatus in a manner consistent with the terms of this Part of this Schedule; “functions” includes powers and duties; “ground mitigation scheme” means a scheme approved by National Gas (such approval not to be unreasonably withheld or delayed) setting out the necessary measures (if any) for a ground subsidence event; “ground monitoring scheme” means a scheme for monitoring ground subsidence which sets out the apparatus which is to be subject to such monitoring, the extent of land to be monitored, the manner in which ground levels are to be monitored, the timescales of any monitoring activities and the extent of ground subsidence which, if exceeded, shall require the undertaker to submit for National Gas’s approval a ground mitigation scheme; “ground subsidence event” means any ground subsidence identified by the monitoring activities set out in the ground monitoring scheme that has exceeded the level described in the ground monitoring scheme as requiring a ground mitigation scheme; “in” in a context referring to apparatus or alternative apparatus in land includes a reference to apparatus or alternative apparatus under, over, across, along or upon such land; “maintain” and “maintenance” shall include the ability and right to do any of the following in relation to any apparatus or alternative apparatus of National Gas: construct, use, repair, alter, inspect, renew or remove the apparatus; “National Gas” means National Gas Transmission plc (Company Number 02006000) whose registered office is at National Gas House, Warwick Technology Park, Gallows Hill, Warwick, CV34 6DA or any successor as a gas transporter within the meaning of Part 1 of the Gas Act 1986; “Network Code” means the network code prepared by National Gas pursuant to Standard Special Condition A11(3) of its Gas Transporter’s Licence, which incorporates the Uniform Network Code, as defined in Standard Special Condition A11(6) of National Gas’ Gas Transporter Licence, as both documents are amended from time to time; “Network Code Claims” means any claim made against National Gas by any person or loss suffered by National Gas under the Network Code arising out of or in connection with any failure by National Gas to make gas available for off take at, or a failure to accept gas tendered for delivery from, any entry point to or exit point from the gas national transmission system as a result of the authorised works or any costs and/or expenses incurred by National Gas as a result of or in connection with, it taking action (including purchase or buy back of capacity) for the purpose of managing constraint or potential constraint on the gas national transmission system which may arise as a result of the authorised works; “plan” or “plans” include all designs, drawings, specifications, method statements, soil reports, programmes, calculations, risk assessments and other documents that are reasonably necessary properly and sufficiently to describe and assess the works to be executed; “parent company” means a parent company of the undertaker acceptable to and which shall have been approved by National Gas acting reasonably; “specified works” means any of the authorised works or activities undertaken in association with the authorised works which: will or may be situated over, or within 15 metres measured in any direction of any apparatus the removal of which has not been required by the undertaker under paragraph 123(2) or otherwise; and/or may in any way adversely affect any apparatus the removal of which has not been required by the undertaker under paragraph 123(2) or otherwise; and/or includes any of the activities that are referred to in paragraph 8 of T/SP/SSW/22 (National Gas’s policies for safe working in proximity to gas apparatus “Specification for safe working in the vicinity of National Grid, High pressure Gas pipelines and associated installation requirements for third parties” T/SP/SSW/22); “undertaker” means the undertaker as defined in article 2(1) of this Order. On Street Apparatus 119 Except for paragraphs 120 (apparatus of National Gas in stopped up streets), 125 (retained apparatus: protection), 126 (expenses) and 127 (indemnity) of this Schedule which will apply in respect of the exercise of all or any powers under the Order affecting the rights and apparatus of National Gas, the other provisions of this Schedule do not apply to apparatus in respect of which the relations between the undertaker and National Gas are regulated by the provisions of Part 3 of the 1991 Act. Apparatus of National Gas in stopped up streets 120 (1) Where any street is stopped up under article 11 (temporary closure of streets and public rights of way), if National Gas has any apparatus in the street or accessed via that street National Gas has the same rights in respect of that apparatus as it enjoyed immediately before the stopping up and the undertaker must grant to National Gas, or procure the granting to National Gas of, legal easements reasonably satisfactory to National Gas in respect of such apparatus and access to it prior to the stopping up of any such street or highway but nothing in this paragraph affects any right of the undertaker or National Gas to require the removal of that apparatus under paragraph 123 or the power of the undertaker, subject to compliance with this sub-paragraph, to carry out works under paragraph 125. (2) Notwithstanding the temporary stopping up, closure or diversion of any highway under the powers of article 11 (temporary closure of streets and public rights of way), National Gas is at liberty at all times to take all necessary access across any such stopped up or closed highway and to execute and do all such works and things in, upon or under any such highway as may be reasonably necessary or desirable to enable it to maintain any apparatus which at the time of the stopping up or diversion was in that highway. Protective works to buildings 121 The undertaker, in the case of the powers conferred by article 18 (protective works to buildings), must exercise those powers so as not to obstruct or render less convenient the access to any apparatus without the written consent of National Gas. Acquisition of land 122 (1) Regardless of any provision in this Order or anything shown on the land plans or contained in the book of reference to the Order, the undertaker may not: (a) appropriate or acquire or take temporary possession of any land or apparatus belonging to National Gas; or (b) appropriate, acquire, extinguish, interfere with or override any easement, other interest or right and/or apparatus of National Gas otherwise than by agreement (such agreement not to be unreasonably withheld). (2) As a condition of an agreement between the parties in sub-paragraph (1), prior to the carrying out of any part of the authorised works (or in such other timeframe as may be agreed between National Gas and the undertaker) that is subject to the requirements of this Part of this Schedule that will cause any conflict with or breach the terms of any easement or other legal or land interest of National Gas or affect the provisions of any enactment or agreement regulating the relations between National Gas and the undertaker in respect of any apparatus laid or erected in land belonging to or secured by the undertaker, the undertaker must as National Gas reasonably requires enter into such deeds of consent upon such terms and conditions as may be agreed between National Gas and the undertaker acting reasonably and which must be no less favourable on the whole to National Gas unless otherwise agreed by National Gas, and it will be the responsibility of the undertaker to procure and/or secure the consent and entering into of such deeds and variations by all other third parties with an interest in the land at that time who are affected by such authorised works. (3) Save where otherwise agreed in writing between National Gas and the undertaker, the undertaker and National Gas agree that where there is any inconsistency or duplication between the provisions set out in this Part of this Schedule relating to the relocation and/or removal of apparatus/including but not limited to the payment of costs and expenses relating to such relocation and/or removal of apparatus) and the provisions of any existing easement, rights, agreements and licences granted, used, enjoyed or exercised by National Gas and/or other enactments relied upon by National Gas as of right or other use in relation to the apparatus, then the provisions in this Schedule shall prevail. (4) Any agreement or consent granted by National Gas under paragraph 125 or any other paragraph of this Part of this Schedule, shall not be taken to constitute agreement under sub-paragraph (1). Removal of apparatus 123 (1) If, in the exercise of the powers conferred by this Order, the undertaker acquires any interest in or possesses temporarily any land in which any apparatus is placed, that apparatus must not be removed under this Part of this Schedule and any right of National Gas to maintain that apparatus in that land must not be extinguished until alternative apparatus has been constructed, and is in operation to the reasonable satisfaction of National Gas in accordance with sub-paragraphs (2) to (5). (2) If, for the purpose of executing any works in, on, under or over any land purchased, held, appropriated or used under this Order, the undertaker requires the removal of any apparatus placed in that land, it must give to National Gas advance written notice of that requirement, together with a plan of the work proposed, and of the proposed position of the alternative apparatus to be provided or constructed and in that case (or if in consequence of the exercise of any of the powers conferred by this Order National Gas reasonably needs to remove any of its apparatus) the undertaker must, subject to sub-paragraph (3), secure any necessary consents for the alternative apparatus and afford to National Gas to its satisfaction (taking into account paragraph 124(1) below) the necessary facilities and rights: (a) for the construction of alternative apparatus in other land of or land secured by the undertaker; and (b) subsequently for the maintenance of that apparatus. (3) If alternative apparatus or any part of such apparatus is to be constructed elsewhere than in other land of or land secured by the undertaker, or the undertaker is unable to afford such facilities and rights as are mentioned in sub-paragraph (2) in the land in which the alternative apparatus or part of such apparatus is to be constructed, National Gas may in its sole discretion, on receipt of a written notice to that effect from the undertaker, take such steps as are reasonable in the circumstances to assist the undertaker to obtain the necessary facilities and rights in the land in which the alternative apparatus is to be constructed save that this obligation shall not extend to the requirement for National Gas to use its compulsory purchase powers to this end unless it elects to so do. (4) Any alternative apparatus to be constructed in land of or land secured by the undertaker under this Part of this Schedule must be constructed in such manner and in such line or situation as may be agreed between National Gas and the undertaker. (5) National Gas must, after the alternative apparatus to be provided or constructed has been agreed, and subject to a written diversion agreement having been entered into between the parties and the grant to National Gas of any such facilities and rights as are referred to in sub-paragraphs (2) or (3), proceed without unnecessary delay to construct and bring into operation the alternative apparatus and subsequently to remove any apparatus required by the undertaker to be removed under the provisions of this Part of this Schedule. (6) The provisions of this paragraph 123 only apply to the extent that the apparatus to be removed by the undertaker forms part of National Gas’ undertaking and has not already been abandoned or decommissioned by National Gas and any existing rights in respect of the abandoned or decommissioned apparatus have been surrendered. Facilities and rights for alternative apparatus 124 (1) Where, in accordance with the provisions of this Part of this Schedule, the undertaker affords to or secures for National Gas facilities and rights in land for the construction, use, maintenance and protection of alternative apparatus in substitution for apparatus to be removed, those facilities and rights must be granted upon such terms and conditions as may be agreed between the undertaker and National Gas and must be no less favourable on the whole to National Gas than the facilities and rights enjoyed by it in respect of the apparatus to be removed unless otherwise agreed by National Gas. (2) If the facilities and rights to be afforded by the undertaker in respect of any alternative apparatus, and the terms and conditions subject to which those facilities and rights are to be granted, are less favourable on the whole to National Gas than the facilities and rights enjoyed by it in respect of the apparatus to be removed and the terms and conditions to which those facilities and rights are subject the matter may be referred to arbitration in accordance with paragraph 131 (arbitration) of this Part of this Schedule and the arbitrator must make such provision for the payment of compensation by the undertaker to National Gas as appears to the arbitrator to be reasonable having regard to all the circumstances of the particular case. Retained apparatus: protection 125 (1) Not less than 56 days before the commencement of any specified works the undertaker must submit to National Gas a plan and, if reasonably required by National Gas, a ground monitoring scheme in respect of those works. (2) In relation to specified works the plan to be submitted to National Gas under sub-paragraph (1) must include a method statement and describe— (a) the exact position of the works; (b) the level at which these are proposed to be constructed or renewed; (c) the manner of their construction or renewal including details of excavation, positioning of plant etc; (d) the position of all apparatus; (e) by way of detailed drawings, every alteration proposed to be made to or close to any such apparatus; and (f) any intended maintenance regimes. (3) The undertaker must not commence any works to which sub-paragraphs (1) and (2) apply until National Gas has given written approval of the plan so submitted. (4) Any approval of National Gas required under sub-paragraph (3)— (a) may be given subject to reasonable conditions for any purpose mentioned in sub-paragraphs (5) or (6); and, (b) must not be unreasonably withheld. (5) In relation to any work to which sub-paragraphs (1) and/or (2) apply, National Gas may require such modifications to be made to the plans as may be reasonably necessary for the purpose of securing its apparatus against interference or risk of damage for the provision of protective works or for the purpose of providing or securing proper and convenient means of access to any apparatus. (6) Works executed under sub-paragraphs (1) or (2) must be executed in accordance with the plan, submitted under sub-paragraph (1) or as relevant sub-paragraph (5), as approved or as amended from time to time by agreement between the undertaker and National Gas and in accordance with such reasonable requirements as may be made in accordance with sub-paragraphs (5) or (7) by National Gas for the alteration or otherwise for the protection of the apparatus, or for securing access to it, and National Gas will be entitled to watch and inspect the execution of those works. (7) Where National Gas requires any protective works to be carried out by itself or by the undertaker (whether of a temporary or permanent nature) such protective works, inclusive of any measures or schemes required and approved as part of the plan approved pursuant to this paragraph, must be carried out to National Gas’ satisfaction prior to the commencement of any specified works for which protective works are required and National Gas must give notice of its requirement for such works within 42 days of the date of submission of a plan pursuant to this paragraph (except in an emergency). (8) If National Gas in accordance with sub-paragraphs (5) or (7) and in consequence of the works proposed by the undertaker, reasonably requires the removal of any apparatus and gives written notice to the undertaker of that requirement, paragraphs 117 to 119 and 122 to 124 apply as if the removal of the apparatus had been required by the undertaker under paragraph 123(2). (9) Nothing in this paragraph precludes the undertaker from submitting at any time or from time to time, but in no case less than 56 days before commencing the execution of the specified works, a new plan, instead of the plan previously submitted, and having done so the provisions of this paragraph will apply to and in respect of the new plan. (10) The undertaker will not be required to comply with sub-paragraph (1) where it needs to carry out emergency works as defined in the 1991 Act but in that case it must give to National Gas notice as soon as is reasonably practicable and a plan of those works and must comply with sub-paragraphs (6), (7) and (8) insofar as is reasonably practicable in the circumstances and comply with sub-paragraph (11) at all times. (11) At all times when carrying out any works authorised under the Order the undertaker must comply with National Gas’s policies for safe working in proximity to gas apparatus“Specification for safe working in the vicinity of National Gas, High pressure Gas pipelines and associated installation requirements for third parties T/SP/SSW22” and HSE’s “HS(~G)47 Avoiding Danger from underground services”. (12) As soon as reasonably practicable after any ground subsidence event attributable to the authorised development the undertaker shall implement an appropriate ground mitigation scheme save that National Gas retains the right to carry out any further necessary protective works for the safeguarding of its apparatus and can recover any such costs in line with paragraph 126. Expenses 126 (1) Save where otherwise agreed in writing between National Gas and the undertaker and subject to the following provisions of this paragraph, the undertaker must pay to National Gas within 30 days of receipt of an itemised VAT invoice or claim from National Gas all charges, costs and expenses reasonably anticipated within the following three months or reasonably and properly incurred by National Gas in, or in connection with, the inspection, removal, relaying or replacing, alteration or protection of any apparatus or the construction of any new or alternative apparatus which may be required in consequence of the execution of any authorised works including without limitation— (a) any costs reasonably incurred by or compensation properly paid by National Gas in connection with the acquisition of rights or the exercise of statutory powers for such apparatus including without limitation all costs incurred by National Gas as a consequence of National Gas: (i) using its own compulsory purchase powers to acquire any necessary rights under paragraph 123(3); or (ii) exercising any compulsory purchase powers in the Order transferred to or benefitting National Gas; (b) in connection with the cost of the carrying out of any diversion work or the provision of any alternative apparatus, where no written diversion agreement is otherwise in place; (c) the cutting off of any apparatus from any other apparatus or the making safe of redundant apparatus; (d) the approval of plans; (e) the carrying out of protective works, plus a capitalised sum to cover the cost of maintaining and renewing permanent protective works; and/or (f) the survey of any land, apparatus or works, the inspection and monitoring of works or the installation or removal of any temporary works reasonably necessary in consequence of the execution of any such works referred to in this Part of this Schedule. (2) There will be deducted from any sum payable under sub-paragraph (1) the value of any apparatus removed under the provisions of this Part of this Schedule and which is not re-used as part of the alternative apparatus, that value being calculated after removal. (3) If in accordance with the provisions of this Part of this Schedule— (a) apparatus of better type, of greater capacity or of greater dimensions is placed in substitution for existing apparatus of worse type, of smaller capacity or of smaller dimensions; or (b) apparatus (whether existing apparatus or apparatus substituted for existing apparatus) is placed at a depth greater than the depth at which the existing apparatus was situated, and the placing of apparatus of that type or capacity or of those dimensions or the placing of apparatus at that depth, as the case may be, is not agreed by the undertaker or, in default of agreement, is not determined by arbitration in accordance with paragraph 131 (arbitration) to be necessary, then, if such placing involves cost in the construction of works under this Part of this Schedule exceeding that which would have been involved if the apparatus placed had been of the existing type, capacity or dimensions, or at the existing depth, as the case may be, the amount which apart from this sub-paragraph would be payable to National Gas by virtue of sub-paragraph (1) will be reduced by the amount of that excess save to the extent that it is not possible in the circumstances to obtain the existing type of apparatus at the same capacity and dimensions or place at the existing depth in which case full costs will be borne by the undertaker. (4) For the purposes of sub-paragraph (3)— (a) an extension of apparatus to a length greater than the length of existing apparatus will not be treated as a placing of apparatus of greater dimensions than those of the existing apparatus; and (b) where the provision of a joint in a pipe or cable is agreed, or is determined to be necessary, the consequential provision of a jointing chamber or of a manhole will be treated as if it also had been agreed or had been so determined. (5) Any amount which apart from this sub-paragraph would be payable to National Gas in respect of works by virtue of sub-paragraph (1) will, if the works include the placing of apparatus provided in substitution for apparatus placed more than 7 years and 6 months earlier so as to confer on National Gas any financial benefit by deferment of the time for renewal of the apparatus in the ordinary course, be reduced by the amount which represents that benefit. Indemnity 127 (1) Subject to sub-paragraphs (2) and (3), if by reason or in consequence of the construction of any works authorised by this Part of this Schedule or in consequence of the construction, use maintenance or failure of any of the authorised works by or on behalf of the undertaker or in consequence of any act or default of the undertaker (or any person employed or authorised by him) in the course of carrying out such works, including without limitation works carried out by the undertaker under this Part of this Schedule or any subsidence resulting from any of these works, any damage is caused to any apparatus or alternative apparatus (other than apparatus the repair of which is not reasonably necessary in view of its intended removal for the purposes of the authorised works) or property of National Gas, or there is any interruption in any service provided, or in the supply of any goods or energy, by National Gas, or National Gas becomes liable to pay any amount to any third party, the undertaker will— (a) bear and pay on demand accompanied by an invoice or claim from National Gas the cost reasonably and properly incurred by National Gas in making good such damage or restoring the supply; and (b) indemnify National Gas for any other expenses, loss, demands, proceedings, damages, claims, penalty or costs incurred by or recovered from National Gas, by reason or in consequence of any such damage or interruption or National Gas becoming liable to any third party and including Network Code Claims other than arising from any default of National Gas. (2) The fact that any act or thing may have been done by National Gas on behalf of the undertaker or in accordance with a plan approved by National Gas or in accordance with any requirement of National Gas or under its supervision will not (unless sub-paragraph (3) applies), excuse the undertaker from liability under the provisions of this sub-paragraph (2) unless National Gas fails to carry out and execute the works properly with due care and attention and in a skilful and workman like manner or in a manner that does not accord with the approved plan. (3) Nothing in sub-paragraph (1) shall impose any liability on the undertaker in respect of— (a) any damage or interruption to the extent that it is attributable to the neglect or default of National Gas, its officers, servants, contractors or agents; (b) any authorised works and/or any other works authorised by this Part of this Schedule carried out by National Gas as an assignee, transferee or lessee of the undertaker with the benefit of the Order pursuant to section 156 of the Planning Act 2008 or article 35 (consent to transfer the benefit of the Order) subject to the proviso that once such works become apparatus (“new apparatus”), any authorised works yet to be executed and not falling within this sub-paragraph 127(3)(b) will be subject to the full terms of this Part of this Schedule including this paragraph 127; and/or (c) any indirect or consequential loss of any third party (including but not limited to loss of use, revenue, profit, contract, production, increased cost of working or business interruption) arising from any such damage or interruption, which is not reasonably foreseeable. (4) National Gas must give the undertaker reasonable notice of any such third party claim or demand and no settlement, admission of liability or compromise must, unless payment is required in connection with a statutory compensation scheme, be made without first consulting the undertaker and considering their representations. (5) National Gas must, in respect of any matter covered by the indemnity given by the undertaker in this paragraph, at all times act reasonably and in the same manner as it would as if settling third party claims on its own behalf from its own funds. (6) National Gas must use its reasonable endeavours to mitigate and to minimise any costs, expenses, loss, demands, and penalties to which the indemnity under this paragraph applies where it is within National Gas’s reasonable ability and control to do so and which expressly excludes any obligation to mitigate liability arising from third parties which is outside of National Gas’s control and if reasonably requested to do so by the undertaker National Gas must provide an explanation of how the claim has been minimised, where relevant. (7) Not to commence construction (and not to permit the commencement of such construction) of the authorised works on any land owned by National Gas or in respect of which National Gas has an easement or wayleave for its apparatus or any other interest or to carry out any works within 15 metres of National Gas’ apparatus until the following conditions are satisfied: (a) unless and until National Gas is satisfied acting reasonably (but subject to all necessary regulatory constraints) that the undertaker has first provided the acceptable security (and provided evidence that it shall maintain such acceptable security for the construction period of the authorised works referred to in sub-paragraph (7) from the proposed date of commencement of construction of those works) and National Gas has confirmed the same to the undertaker in writing; and (b) unless and until National Gas is satisfied acting reasonably (but subject to all necessary regulatory constraints) that the undertaker has procured acceptable insurance (and provided evidence to National Gas that it shall maintain such acceptable insurance for the construction period of the authorised works referred to in sub-paragraph 127(7) from the proposed date of commencement of construction of those works) and National Gas has confirmed the same in writing to the undertaker. (8) In the event that the undertaker fails to comply with paragraph 127(7) of this Part of this Schedule, nothing in this Part of this Schedule shall prevent National Gas from seeking injunctive relief (or any other equitable remedy) in any court of competent jurisdiction. Enactments and agreements 128 Save to the extent provided for to the contrary elsewhere in this Part of this Schedule or by agreement in writing between National Gas and the undertaker, nothing in this Part of this Schedule affects the provisions of any enactment or agreement regulating the relations between the undertaker and National Gas in respect of any apparatus laid or erected in land belonging to the undertaker on the date on which this Order is made. Co-operation 129 (1) Where in consequence of the proposed construction of any part of the authorised works, the undertaker or National Gas requires the removal of apparatus under paragraph 123(2) or National Gas makes requirements for the protection or alteration of apparatus under paragraph 125, the undertaker shall use its best endeavours to co-ordinate the execution of the works in the interests of safety and the efficient and economic execution of the authorised works and taking into account the need to ensure the safe and efficient operation of National Gas’s undertaking and National Gas shall use its best endeavours to co-operate with the undertaker for that purpose. (2) For the avoidance of doubt whenever National Gas’s consent, agreement or approval is required in relation to plans, documents or other information submitted by the undertaker or the taking of action by the undertaker, it must not be unreasonably withheld or delayed. Access 130 If in consequence of the agreement reached in accordance with paragraph 122(1) or the powers granted under this Order the access to any apparatus is materially obstructed, the undertaker must provide such alternative means of access to such apparatus as will enable National Gas to maintain or use the apparatus no less effectively than was possible before such obstruction. Arbitration 131 Save for differences or disputes arising under paragraph 123(2), 123(4), 124(1) and 125 any difference or dispute arising between the undertaker and National Gas under this Part of this Schedule must, unless otherwise agreed in writing between the undertaker and National Gas, be determined by arbitration in accordance with article 42 (arbitration). Notices 132 Notwithstanding article 45 (service of notices), any plans submitted to National Gas by the undertaker pursuant to paragraph 125 must be submitted to https://lsbud.co.uk/ or such other address as National Gas may from time to time appoint instead for that purpose and notify to the undertaker in writing.

Propose a change

SCHEDULE 16 PROCEDURE FOR DISCHARGE OF REQUIREMENTS

Article 46 Interpretation 1 In this Schedule— “requirement consultee” means any body or authority named in a requirement as a body to be consulted by the relevant planning authority in discharging that requirement; “start date” means the date of the notification given by the Secretary of State under paragraph 4(2)(b); and “working day” means any day other than a Saturday, Sunday or English bank or public holiday. Applications made under requirement 2 (1) Where an application has been made to the relevant planning authority for any consent, agreement or approval required by a requirement, the undertaker will also submit a copy of that application to any requirement consultee. (2) Where an application has been made to the relevant planning authority for any consent, agreement or approval required by a requirement the relevant planning authority must give notice to the undertaker of its decision on the application within a period of eight weeks beginning with the later of— (a) the day immediately following that on which the application is received by the authority; (b) the day immediately following that on which further information has been supplied by the undertaker under paragraph 3; or (c) such longer period that is agreed in writing by the undertaker and the relevant planning authority. (3) Subject to paragraph 4, in the event that the relevant planning authority does not determine an application within the period set out in sub-paragraph (2), the relevant planning authority is to be taken to have granted all parts of the application (without any condition or qualification) at the end of that period. (4) Any application made to the relevant planning authority pursuant to sub-paragraph (2) must include a statement to confirm whether it is likely that the subject matter of the application will give rise to any materially new or materially different environmental effects compared to those in the environmental statement and if it will then it must be accompanied by information setting out what those effects are. (5) Where an application has been made to the relevant planning authority for any consent, agreement or approval required by a requirement included in this Order and the relevant planning authority does not determine the application within the period set out in sub-paragraph (2) and is accompanied by a report pursuant to sub-paragraph (4) which states that the subject matter of such application is likely to give rise to any materially new or materially different environmental effects compared to those in the environmental statement then the application is to be taken to have been refused by the relevant planning authority at the end of that period. Further information and consultation 3 (1) In relation to any application to which this Schedule applies, the relevant planning authority may request such reasonable further information from the undertaker as is necessary to enable it to consider the application. (2) In the event that the relevant planning authority considers such further information to be necessary and the provision governing or requiring the application does not specify that consultation with a requirement consultee is required, the relevant planning authority must, within 20 working days of receipt of the application, notify the undertaker in writing specifying the further information required. (3) If the provision governing or requiring the application specifies that consultation with a requirement consultee is required, the relevant planning authority must issue the consultation to the requirement consultee within 10 working days of receipt of the application, and must notify the undertaker in writing specifying any further information the relevant planning authority considers necessary or that is requested by the requirement consultee within 10 working days of receipt of such a request and in any event within 20 working days of receipt of the application (or such other period as is agreed in writing between the undertaker and the relevant planning authority). (4) In the event that the relevant planning authority does not give notification as specified in sub-paragraph (2) or (3) it is deemed to have sufficient information to consider the application and is not thereafter entitled to request further information without the prior agreement of the undertaker. (5) Where further information is requested under this paragraph in relation to part only of an application, that part is to be treated as separate from the remainder of the application for the purposes of calculating time periods in paragraph 2 and paragraph 3. Appeals 4 (1) The undertaker may appeal in the event that— (a) the relevant planning authority refuses an application for any consent, agreement or approval required by a requirement included in this Order or grants it subject to conditions; (b) the relevant planning authority is deemed to have refused an application pursuant to paragraph 2(5); (c) on receipt of a request for further information pursuant to paragraph 3 the undertaker considers that either the whole or part of the specified information requested by the relevant planning authority is not necessary for consideration of the application; or (d) on receipt of any further information requested, the relevant planning authority notifies the undertaker that the information provided is inadequate and requests additional information which the undertaker considers is not necessary for consideration of the application. (2) The steps to be followed in the appeal process are as follows— (a) the undertaker must submit the appeal documentation to the Secretary of State and must on the same day provide copies of the appeal documentation to the relevant planning authority and any requirement consultee; (b) the Secretary of State must appoint a person to determine the appeal as soon as reasonably practicable and must forthwith notify the appeal parties of the identity of the appointed person and the address to which all correspondence for the appointed person’s attention should be sent; (c) the relevant planning authority and any requirement consultee must submit written representations to the appointed person in respect of the appeal within 10 working days of the start date and must ensure that copies of their written representations are sent to each other and to the undertaker on the day on which they are submitted to the appointed person; (d) the undertaker may make any counter-submissions to the appointed person within 10 working days of receipt of written representations pursuant to sub-paragraph (c); (e) the appointed person must make their decision and notify it to the appeal parties, with reasons, as soon as reasonably practicable and in any event within 30 working days of the deadline for the receipt of counter-submissions pursuant to sub-paragraph (d); and (f) the appointment of the person pursuant to sub-paragraph (b) may be undertaken by a person appointed by the Secretary of State for this purpose instead of by the Secretary of State. (3) In the event that the appointed person considers that further information is necessary to enable the appointed person to consider the appeal they must, within five working days of the appointed person’s appointment, notify the appeal parties in writing specifying the further information required. (4) Any further information required pursuant to sub-paragraph (3) must be provided by the relevant party to the appointed person and the other appeal parties on the date specified by the appointed person (the “specified date”), and the appointed person must notify the appeal parties of the revised timetable for the appeal on or before that day. The revised timetable for the appeal must require submission of written representations to the appointed person within 10 working days of the specified date, but otherwise the process and time limits set out in sub-paragraphs (c) to (2)(e) of sub-paragraph (2) apply. (5) The appointed person may— (a) allow or dismiss the appeal; or (b) reverse or vary any part of the decision of the relevant planning authority (whether the appeal relates to that part of it or not), and may deal with the application as if it had been made to them in the first instance. (6) The appointed person may proceed to a decision on an appeal taking into account only such written representations as have been sent within the relevant time limits. (7) The appointed person may proceed to a decision even though no written representations have been made within the relevant time limits, if it appears to them that there is sufficient material to enable a decision to be made on the merits of the case. (8) The decision of the appointed person on an appeal is to be final and binding on the parties, unless proceedings are brought by a claim for judicial review. (9) If an approval is given by the appointed person pursuant to this Schedule, it is to be deemed to be an approval for the purpose of Schedule 2 (requirements) as if it had been given by the relevant planning authority. The relevant planning authority may confirm any determination given by the appointed person in identical form in writing but a failure to give such confirmation (or a failure to give it in identical form) is not to be taken to affect or invalidate the effect of the appointed person’s determination. (10) Save where a direction is given pursuant to sub-paragraph (11) requiring the costs of the appointed person to be paid by the relevant planning authority, the reasonable costs of the appointed person must be met by the undertaker. (11) On application by the relevant planning authority or the undertaker, the appointed person may give directions as to the costs of the appeal parties and as to the parties by whom the costs of the appeal are to be paid. In considering whether to make any such direction and the terms on which it is to be made, the appointed person must have regard to advice on planning appeals and award costs published in Planning Practice Guidance: Appeals (March 2014) or any circular or guidance which may from time to time replace it. Fees 5 (1) Where an application is made to the relevant planning authority for written consent, agreement or approval in respect of a requirement, the fee prescribed under regulation 16(1)(b) of the Town and Country Planning (Fees for Applications, Deemed Applications, Requests and Site Visits) (England) Regulations 2012 (as may be amended or replaced from time to time)) is to apply and must be paid to the relevant planning authority for each application. (2) Any fee paid under this Schedule must be refunded to the undertaker within four weeks of— (a) the application being rejected as invalidly made; or (b) the relevant planning authority failing to determine the application within the relevant period in paragraph 2(2) unless— (i) within that period the undertaker agrees, in writing, that the fee is to be retained by the relevant planning authority and credited in respect of a future application; or (ii) a longer period of time for determining the application has been agreed pursuant to paragraph 2(2) of this Schedule, as applicable.

Propose a change