Contents: 269 provisions
  1. Title and introductory text
  2. 4 Fees
  3. 5 National policy statements
  4. 6 Review
  5. 6ZA Review: supplementary
  6. 6A Interpretation of sections 5(4) and 6(7)
  7. 6B Extension of consideration period under section 5(4A) or 6(7A)
  8. 7 Consultation and publicity
  9. 8 Consultation on publicity requirements
  10. 9 Parliamentary requirements
  11. 10 Sustainable development
  12. 11 Suspension pending review
  13. 12 Pre-commencement statements of policy, consultation etc.
  14. 13 Legal challenges relating to national policy statements
  15. 14 Nationally significant infrastructure projects: general
  16. 15 Generating stations
  17. 16 Electric lines
  18. 17 Underground gas storage facilities
  19. 18 LNG facilities
  20. 19 Gas reception facilities
  21. 20 Gas transporter pipe-lines
  22. 21 Other pipe-lines
  23. 22 Highways
  24. 23 Airports
  25. 24 Harbour facilities
  26. 25 Railways
  27. 26 Rail freight interchanges
  28. 27 Dams and reservoirs
  29. 28 Transfer of water resources
  30. 28A Desalination plants
  31. 29 Waste water treatment plants
  32. 30 Hazardous waste facilities
  33. 30A Radioactive waste geological disposal facilities
  34. 31 When development consent is required
  35. 32 Meaning of “development”
  36. 33 Effect of requirement for development consent on other consent regimes
  37. 34 Welsh offshore generating stations
  38. 35 Directions in relation to projects of national significance
  39. 35ZA Directions under sections 35: procedural matters
  40. 35A Timetable for deciding request for direction under section 35
  41. 35B Directions disapplying requirement for development consent
  42. 35C Directions under section 35B: supplementary
  43. 35D Timetable for deciding request for direction under section 35B
  44. 36 Amendments consequential on development consent regime
  45. 37 Applications for orders granting development consent
  46. 38 Model provisions
  47. 39 Register of applications
  48. 40 Applications by the Crown for orders granting development consent
  49. 41 Chapter applies before application is made
  50. 42 Duty to consult
  51. 43 Local authorities for purposes of section 42(1)(b)
  52. 44 Categories for purposes of section 42(1)(d)
  53. 45 Timetable for consultation under section 42
  54. 46 Duty to notify Secretary of State and others of proposed application
  55. 47 Duty to consult local community
  56. 48 Duty to publicise
  57. 49 Duty to take account of responses to consultation and publicity
  58. 50 Guidance about pre-application steps
  59. 51 Advice for potential applicants and others
  60. 52 Obtaining information about interests in land
  61. 53 Rights of entry
  62. 54 Rights of entry: Crown land
  63. 54A Power to provide for fees for certain services in relation to nationally significant infrastructure projects
  64. 55 Acceptance of applications
  65. 56 Notifying persons of accepted application
  66. 56A Local authorities for the purposes of sections 56(2)(b) and 60(2)(a)
  67. 57 Categories for purposes of section 56(2)(d)
  68. 58 Certifying compliance with section 56
  69. 59 Notice of persons interested in land to which compulsory acquisition request relates
  70. 60 Local impact reports
  71. 61 Initial choice of Panel or single appointed person
  72. 62 Switching from single appointed person to Panel
  73. 63 Delegation of functions by person appointed to chair Commission
  74. 64 Panel for each application to be handled under this Chapter
  75. 65 Appointment of members, and lead member, of Panel
  76. 66 Ceasing to be member, or lead member, of Panel
  77. 67 Panel member continuing though ceasing to be Commissioner
  78. 68 Additional appointments to Panel
  79. 69 Replacement of lead member of Panel
  80. 70 Membership of Panel where application relates to land in Wales
  81. 71 Supplementary provision where Panel replaces single appointed person
  82. 72 Panel ceasing to have any members
  83. 73 Consequences of changes in Panel
  84. 74 Panel to decide, or make recommendation in respect of, application
  85. 75 Decision-making by the Panel
  86. 76 Allocation within Panel of Panel's functions
  87. 77 Exercise of Panel's powers for examining application
  88. 78 Single appointed person to handle application
  89. 79 Appointment of single appointed person
  90. 80 Ceasing to be the single appointed person
  91. 81 Single Commissioner continuing though ceasing to be Commissioner
  92. 82 Appointment of replacement single appointed person
  93. 83 Single appointed person to examine and report on application
  94. 84 Report from single Commissioner to be referred to Council
  95. 85 Decisions made by the Council on the application
  96. 86 Chapter applies to examination by Panel or single appointed person
  97. 87 Examining authority to control examination of application
  98. 88 Initial assessment of issues, and preliminary meeting
  99. 88A Local authorities for the purposes of section 88(3)(d)
  100. 89 Examining authority's decisions about how application is to be examined
  101. 90 Written representations
  102. 91 Hearings about specific issues
  103. 92 Compulsory acquisition hearings
  104. 93 Open-floor hearings
  105. 94 Hearings: general provisions
  106. 95 Hearings: disruption ...
  107. 95A Hearings: defence and national security
  108. 96 Representations not made orally may be made in writing
  109. 96A Representations from public authorities
  110. 96B Costs
  111. 97 Procedure rules
  112. 98 Timetable for examining, and reporting on, application
  113. 99 Completion of Examining authority's examination of application
  114. 100 Assessors
  115. 101 Legal advice and assistance
  116. 102 Interpretation of Chapter 4: “interested party” and other expressions
  117. 102A Persons in certain categories may ask to become interested parties etc
  118. 102B Categories for the purposes of section 102A
  119. 103 Secretary of State is to decide applications
  120. 104 Decisions in cases where national policy statement has effect
  121. 105 Decisions in cases where no national policy statement has effect
  122. 106 Matters that may be disregarded when deciding application
  123. 107 Timetable for decisions
  124. 108 Suspension during review of national policy statement
  125. 114 Grant or refusal of development consent
  126. 115 Development for which development consent may be granted
  127. 116 Reasons for decision to grant or refuse development consent
  128. 117 Orders granting development consent: formalities
  129. 118 Legal challenges relating to applications for orders granting development consent
  130. 119 Correction of errors in development consent decisions
  131. 120 What may be included in order granting development consent
  132. 121 Proposed exercise of powers in relation to legislation
  133. 122 Purpose for which compulsory acquisition may be authorised
  134. 123 Land to which authorisation of compulsory acquisition can relate
  135. 124 Guidance about authorisation of compulsory acquisition
  136. 125 Application of compulsory acquisition provisions
  137. 126 Compensation for compulsory acquisition
  138. 127 Statutory undertakers' land
  139. 128 Local authority and statutory undertakers' land: general
  140. 129 Local authority and statutory undertakers' land: acquisition by public body
  141. 130 National Trust land
  142. 131 Commons, open spaces etc: compulsory acquisition of land
  143. 132 Commons, open spaces etc: compulsory acquisition of rights over land
  144. 133 Rights in connection with underground gas storage facilities
  145. 134 Notice of authorisation of compulsory acquisition
  146. 135 Orders: Crown land
  147. 136 Public rights of way
  148. 137 Public rights of way: statutory undertakers' apparatus etc.
  149. 138 Extinguishment of rights, and removal of apparatus, of statutory undertakers etc.
  150. 139 Common land and rights of common
  151. 140 Operation of generating stations
  152. 141 Keeping electric lines installed above ground
  153. 142 Use of underground gas storage facilities
  154. 143 Diversion of watercourses
  155. 144 Highways
  156. 145 Harbours
  157. 146 Discharge of water
  158. 147 Development of Green Belt land
  159. 148 Deemed consent under section 34 of the Coast Protection Act 1949
  160. 149 Deemed licences under Part 2 of the Food and Environment Protection Act 1985
  161. 149A Deemed consent under a marine licence
  162. 150 Removal of consent requirements
  163. 151 Liability under existing regimes
  164. 152 Compensation in case where no right to claim in nuisance
  165. 153 Changes to, and revocation of, orders granting development consent
  166. 154 Duration of order granting development consent
  167. 155 When development begins
  168. 156 Benefit of order granting development consent
  169. 157 Use of buildings in respect of which development consent granted
  170. 158 Nuisance: statutory authority
  171. 159 Interpretation: land and rights over land
  172. 160 Development without development consent
  173. 161 Breach of terms of order granting development consent
  174. 162 Time limits
  175. 163 Right to enter without warrant
  176. 164 Right to enter under warrant
  177. 165 Rights of entry: supplementary provisions
  178. 166 Rights of entry: Crown land
  179. 167 Power to require information
  180. 168 Offences relating to information notices
  181. 169 Notice of unauthorised development
  182. 170 Execution of works required by notice of unauthorised development
  183. 171 Injunctions
  184. 172 Isles of Scilly
  185. 173 The relevant local planning authority
  186. 174 Planning obligations
  187. 175 Blighted land: England and Wales
  188. 176 Blighted land: Scotland
  189. 177 Grants for advice and assistance: England and Wales
  190. 178 Grants for advice and assistance: Scotland
  191. 179 Delegation of functions of regional planning bodies
  192. 180 Local development documents
  193. 181 Regional spatial strategies: climate change policies
  194. 182 Development plan documents: climate change policies
  195. 183 Good design
  196. 184 Correction of errors in decisions
  197. 185 Power of High Court to remit strategies, plans and documents
  198. 187 Power to decline to determine applications: amendments
  199. 188 Local development orders: removal of requirement to implement policies
  200. 189 Compensation where development order or local development order withdrawn
  201. 190 Power to make non-material changes to planning permission
  202. 191 Validity of orders, decisions and directions
  203. 192 Tree preservation orders
  204. 193 Existing tree preservation orders: transitional provision
  205. 194 Use of land: power to override easements and other rights
  206. 195 Applications and appeals by statutory undertakers
  207. 196 Determination of procedure for certain proceedings
  208. 197 Appeals: miscellaneous amendments
  209. 198 Appeals relating to old mining permissions
  210. 199 Fees for planning applications
  211. 200 Fees for appeals
  212. 201 Meaning of “local authority” in planning Acts
  213. 202 Powers of National Assembly for Wales
  214. 203 Power to make provision in relation to Wales
  215. 204 Wales: transitional provision in relation to blighted land
  216. 205 The levy
  217. 206 The charge
  218. 207 Joint committees
  219. 208 Liability
  220. 209 Liability: interpretation of key terms
  221. 210 Charities
  222. 211 Amount
  223. 212 Charging schedule: examination
  224. 212A Charging schedule: examiner's recommendations
  225. 213 Charging schedule: approval
  226. 214 Charging schedule: effect
  227. 214A Secretary of State: power to require review of certain charging schedules
  228. 215 Appeals
  229. 216 Application
  230. 216A Duty to pass receipts to other persons
  231. 216B Use of CIL in an area to which section 216A(1) duty does not relate
  232. 217 Collection
  233. 218 Enforcement
  234. 219 Compensation
  235. 220 Community Infrastructure Levy: procedure
  236. 221 Secretary of State
  237. 222 Regulations and orders: general
  238. 223 Relationship with other powers
  239. 224 Community Infrastructure Levy: amendments
  240. 225 Community Infrastructure Levy: repeals
  241. 226 The Crown
  242. 227 “Crown land” and “the appropriate Crown authority”
  243. 228 Enforcement in relation to the Crown and Parliament
  244. 229 Service of notices: general
  245. 230 Service of documents to persons interested in or occupying premises
  246. 231 Service of notices on the Crown and Parliament
  247. 232 Orders and regulations
  248. 233 Directions
  249. 234 Abbreviated references to Acts
  250. 235 Interpretation
  251. 236 Application of Act to Scotland: modifications
  252. 237 Supplementary and consequential provision
  253. 237A Variation and replacement of section 33 consents: transitional provision
  254. 238 Repeals
  255. 239 Financial provisions
  256. 240 Extent
  257. 241 Commencement
  258. 242 Short title
  259. SCHEDULE 2 Amendments consequential on development consent regime
  260. SCHEDULE 2A Biodiversity gain
  261. SCHEDULE 4 Correction of errors in development consent decisions
  262. SCHEDULE 5 Provision relating to, or to matters ancillary to, development
  263. SCHEDULE 6 Changes to, and revocation of, orders granting development consent
  264. SCHEDULE 7 Power to decline to determine applications: amendments
  265. SCHEDULE 8 Tree preservation orders: further amendments
  266. SCHEDULE 10 Further provisions as to the procedure for certain proceedings
  267. SCHEDULE 11 Appeals: miscellaneous amendments
  268. SCHEDULE 12 Application of Act to Scotland: modifications
  269. SCHEDULE 13 Repeals

Proposed changes to this act

No one has proposed a change to this act yet.

269 provisions

105 Decisions in cases where no national policy statement has effect

(1) This section applies in relation to an application for an order granting development consent if section 104 does not apply in relation to the application. (2) In deciding the application the Secretary of State must have regard to— (a) any local impact report (within the meaning given by section 60(3)) submitted to the Secretary of State before the deadline specified in a notice under section 60(2), (b) any matters prescribed in relation to development of the description to which the application relates, and (c) any other matters which the Secretary of State thinks are both important and relevant to the Secretary of State's decision. (3) Where there is a biodiversity gain statement under Schedule 2A in relation to development of the description to which the application relates, the Secretary of State may not grant the application unless satisfied that the biodiversity gain objective contained in the statement is met in relation to the development to which the application relates. (4) Subsection (3) does not apply to the extent that the Secretary of State is satisfied that deciding the application in accordance with that subsection would have an effect referred to in section 104(4), (5), (6) or (7).

Propose a change

106 Matters that may be disregarded when deciding application

(1) In deciding an application for an order granting development consent, the Secretary of State may disregard representations if the Secretary of State considers that the representations— (a) are vexatious or frivolous, (b) relate to the merits of policy set out in a national policy statement, or (c) relate to compensation for compulsory acquisition of land or of an interest in or right over land. (2) In this section “representation” includes evidence.

Propose a change

107 Timetable for decisions

(1) The Secretary of State is under a duty to decide an application for an order granting development consent by the end of the period of 3 months beginning with— (a) the deadline under section 98(3), or (b) (if earlier) the end of the day on which the Secretary of State receives a report on the application under section 74(2)(b) or 83(1)(b). (2) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . (3) The Secretary of State may set a date for the deadline under subsection (1) that is later than the date for the time being set. (4) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . (5) The power under subsection (3) may be exercised— (a) more than once in relation to the same deadline; (b) after the date for the time being set for the deadline. (6) Subsection (7) applies where the power under subsection (3) is exercised. (7) The Secretary of State exercising the power must make a statement, to the House of Parliament of which that Secretary of State is a member, announcing the new deadline. (8) A statement under subsection (7) must be published in such form and manner as the Secretary of State considers appropriate. (8A) A statement under subsection (7) may be written or oral.

Propose a change

108 Suspension during review of national policy statement

(1) This section applies where— (a) an application is made for an order granting development consent for development of a description in relation to which a national policy statement has effect, and (b) the Secretary of State thinks that, as a result of a change in circumstances since the national policy statement was first published or (if later) the statement or any part of it was last reviewed, all or part of the statement should be reviewed before the application is decided. (2) The Secretary of State may direct that, until the review has been completed and the Secretary of State has complied with section 6(5) in relation to the review, examination of the application by a Panel under Chapter 2, or a single appointed person under Chapter 3, is suspended (if not already completed).

Propose a change

114 Grant or refusal of development consent

(1) When the Secretary of State has decided an application for an order granting development consent, the Secretary of State must either— (a) make an order granting development consent, or (b) refuse development consent. (2) The Secretary of State may by regulations make provision regulating the procedure to be followed if the Secretary of State proposes to make an order granting development consent on terms which are materially different from those proposed in the application.

Propose a change

115 Development for which development consent may be granted

(1) Development consent may be granted for development which is— (a) development for which development consent is required, or (b) associated development, or (c) related housing development. (2) “Associated development” means development which— (a) is associated with the development within subsection (1)(a) (or any part of it), (b) does not consist of or include the construction or extension of one or more dwellings, and , or (c) is within subsection (3) , (4) or (4A). (3) Development is within this subsection if it is to be carried out wholly in one or more of the following areas— (a) England; (b) waters adjacent to England up to the seaward limits of the territorial sea; (c) in the case of development in the field of energy, a Renewable Energy Zone, except any part of a Renewable Energy Zone in relation to which the Scottish Ministers have functions. (4) Development is within this subsection if— (a) it is to be carried out wholly in Wales, (b) it is the carrying out or construction of surface works, boreholes or pipes, and (c) the development within subsection (1)(a) with which it is associated is development within section 17(3). (4A) Development is within this subsection if the development within subsection (1)(a) with which it is associated is— (a) the construction or extension of a generating station that is or (when constructed or extended) is expected to be within section 15(3A) or (3B), or (b) the installation of an electric line that is or (when installed) is expected to be within section 14(1)(b). (4B) Related housing development” means development which— (a) consists of or includes the construction or extension of one or more dwellings, (b) is on the same site as, or is next to or close to, any part of the development within subsection (1)(a), or is otherwise associated with that development (or any part of it), (c) is to be carried out wholly in England, and (d) meets the condition in subsection (4C). (4C) Development meets the condition in this subsection if the development within subsection (1)(a) to which it is related is to be carried out in one or more of the following areas— (a) England; (b) waters adjacent to England up to the seaward limits of the territorial sea. (5) To the extent that development consent is granted for associated development or related housing development, section 33 applies to the development as it applies to development for which development consent is required. (6) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . (7) The Secretary of State, in deciding an application for an order granting development consent for development that includes related housing development, must take into account any matters set out in guidance published by the Secretary of State.

Propose a change

116 Reasons for decision to grant or refuse development consent

(1) The Secretary of State must prepare a statement of the Secretary of State's reasons for deciding to— (a) make an order granting development consent, or (b) refuse development consent. (2) The Secretary of State must provide a copy of the statement to each person who is an interested party in relation to the application for the purposes of Chapter 4 (see section 102). (3) The Secretary of State must publish the statement in such manner as the Secretary of State thinks appropriate. (4) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Propose a change

117 Orders granting development consent: formalities

(1) This section applies in relation to an order granting development consent. (2) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . (3) Except in a case within subsection (4), the Secretary of State must publish the order in such manner as the Secretary of State thinks appropriate. (4) If the order includes provision— (a) made under section 120(3) for or relating to any of the matters listed in paragraphs 32A and 32B of Schedule 5, or (b) made in the exercise of any of the powers conferred by section 120(5)(a) or (b), the order must be contained in a statutory instrument. (5) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . (6) As soon as practicable after the instrument containing the order is made, the Secretary of State must deposit in the office of the Clerk of the Parliaments a copy of— (a) the instrument, (b) the latest version of any plan supplied by the applicant in connection with the application for the order contained in the instrument, and (c) the statement of reasons prepared under section 116(1). (7) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Propose a change

118 Legal challenges relating to applications for orders granting development consent

(1) A court may entertain proceedings for questioning an order granting development consent only if— (a) the proceedings are brought by a claim for judicial review, and (b) the claim form is filed before the end of the period of 6 weeks beginning with the day after — (i) the day on which the order is published, or (ii) if later, the day on which the statement of reasons for making the order is published. (2) A court may entertain proceedings for questioning a refusal of development consent only if— (a) the proceedings are brought by a claim for judicial review, and (b) the claim form is filed before the end of the period of 6 weeks beginning with the day after the day on which the statement of reasons for the refusal is published. (3) A court may entertain proceedings for questioning a decision of the Secretary of State under section 55 not to accept an application for an order granting development consent only if— (a) the proceedings are brought by a claim for judicial review, and (b) the claim form is filed before the end of the period of 6 weeks beginning with the day after the day on which the Secretary of State provides the copy of the statement of reasons for the decision to the applicant as required by subsection (7)(b) of that section. (4) A court may entertain proceedings for questioning a decision under paragraph 1 of Schedule 4 in relation to an error or omission in a decision document only if— (a) the proceedings are brought by a claim for judicial review, and (b) the claim form is filed before the end of the period of 6 weeks beginning with the day after the day on which a correction notice in respect of the error or omission is issued under paragraph 2 of that Schedule or, if the correction is required to be made by order contained in a statutory instrument, the day after the day on which the order is published. (5) A court may entertain proceedings for questioning a decision under paragraph 2(1) of Schedule 6 to make a change to an order granting development consent only if— (a) the proceedings are brought by a claim for judicial review, and (b) the claim form is filed before the end of the period of 6 weeks beginning with the day after the day on which notice of the change is given under paragraph 2(12)(b) of that Schedule or, if the change to the order is required to be made by order contained in a statutory instrument, the day after the day on which the order making the change is published. (6) A court may entertain proceedings for questioning a decision under paragraph 3(1) of Schedule 6 to make a change to, or revoke, an order granting development consent only if— (a) the proceedings are brought by a claim for judicial review, and (b) the claim form is filed before the end of the period of 6 weeks beginning with the day after the day on which notice of the change or revocation is given under paragraph 4(6) of that Schedule or, if the change or revocation is required to be made by order contained in a statutory instrument, the day after the day on which the order making the change or revocation is published. (7) A court may entertain proceedings for questioning anything else done, or omitted to be done, by the Secretary of State ... in relation to an application for an order granting development consent only if— (a) the proceedings are brought by a claim for judicial review, and (b) the claim form is filed before the end of the period of 6 weeks beginning with the day after the relevant day. (8) “The relevant day”, in relation to an application for an order granting development consent, means the day on which— (a) the application is withdrawn, (b) the order granting development consent is published or (if later) the statement of reasons for making the order is published, or (c) the statement of reasons for the refusal of development consent is published. (9) Subsections (7) and (8) do not apply in relation to— (a) a failure to decide an application for an order granting development consent, or (b) anything which delays (or is likely to delay) the decision on such an application.

Propose a change

119 Correction of errors in development consent decisions

Schedule 4 (correction of errors in development consent decisions) has effect.

Propose a change

120 What may be included in order granting development consent

(1) An order granting development consent may impose requirements in connection with the development for which consent is granted. (2) The requirements may in particular include — (a) requirements corresponding to conditions which could have been imposed on the grant of any permission, consent or authorisation, or the giving of any notice, which (but for section 33(1)) would have been required for the development ; (b) requirements to obtain the approval of the Secretary of State or any other person, so far as not within paragraph (a); (c) requirements designed to secure that— (i) the biodiversity gain objective under Schedule 2A relevant to the development is met; (ii) any proposals included in the application for the order for the purposes of meeting the biodiversity gain objective are implemented. (3) An order granting development consent may make provision relating to, or to matters ancillary to, the development for which consent is granted. (4) The provision that may be made under subsection (3) includes in particular provision for or relating to any of the matters listed in Part 1 of Schedule 5. (5) An order granting development consent may— (a) apply, modify or exclude a statutory provision which relates to any matter for which provision may be made in the order; (b) make such amendments, repeals or revocations of statutory provisions of local application as appear to the Secretary of State to be necessary or expedient in consequence of a provision of the order or in connection with the order; (c) include any provision that appears to the Secretary of State to be necessary or expedient for giving full effect to any other provision of the order; (d) include incidental, consequential, supplementary, transitional or transitory provisions and savings. (6) In subsection (5) “statutory provision” means a provision of an Act or of an instrument made under an Act. (7) Subsections (3) to (6) are subject to subsection (8) and the following provisions of this Chapter. (8) With the exception of provision made under subsection (3) for or relating to any of the matters listed in paragraph 32B of Schedule 5, an order granting development consent may not include— (a) provision creating offences, (b) provision conferring power to create offences, or (c) provision changing an existing power to create offences. (9) To the extent that provision for or relating to a matter may be included in an order granting development consent, none of the following may include any such provision— (a) an order under section 14 or 16 of the Harbours Act 1964 (c. 40) (orders in relation to harbours, docks and wharves); (b) an order under section 4(1) of the Gas Act 1965 (c. 36) (order authorising storage of gas in underground strata); (c) an order under section 1 or 3 of the Transport and Works Act 1992 (c. 42) (orders as to railways, tramways, inland waterways etc.).

Propose a change

121 Proposed exercise of powers in relation to legislation

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Propose a change

122 Purpose for which compulsory acquisition may be authorised

(1) An order granting development consent may include provision authorising the compulsory acquisition of land only if the Secretary of State is satisfied that the conditions in subsections (2) and (3) are met. (2) The condition is that the land— (a) is required for the development to which the development consent relates, (b) is required to facilitate or is incidental to that development, or (c) is replacement land which is to be given in exchange for the order land under section 131 or 132. (3) The condition is that there is a compelling case in the public interest for the land to be acquired compulsorily.

Propose a change

123 Land to which authorisation of compulsory acquisition can relate

(1) An order granting development consent may include provision authorising the compulsory acquisition of land only if the Secretary of State is satisfied that one of the conditions in subsections (2) to (4) is met. (2) The condition is that the application for the order included a request for compulsory acquisition of the land to be authorised. (3) The condition is that all persons with an interest in the land consent to the inclusion of the provision. (4) The condition is that the prescribed procedure has been followed in relation to the land.

Propose a change

124 Guidance about authorisation of compulsory acquisition

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Propose a change

125 Application of compulsory acquisition provisions

(1) This section applies if an order granting development consent includes provision authorising the compulsory acquisition of land. (2) Part 1 of the Compulsory Purchase Act 1965 (c. 56) (procedure for compulsory purchase) applies to the compulsory acquisition of land under the order— (a) as it applies to a compulsory purchase to which Part 2 of the Acquisition of Land Act 1981 (c. 67) applies, and (b) as if the order were a compulsory purchase order under that Act. (3) Part 1 of the Compulsory Purchase Act 1965, as applied by subsection (2), has effect with the omission of the following provisions— (a) section 4 (time limit for exercise of compulsory purchase powers); (b) section 10 (compensation for injurious affection); (c) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . (4) In so far as the order includes provision authorising the compulsory acquisition of land in Scotland— (a) subsections (2) and (3) do not apply, and (b) the Acquisition of Land (Authorisation Procedure) (Scotland) Act 1947 (c. 42) (“the 1947 Act”) applies to the compulsory acquisition of that land under the order as if the order were a compulsory purchase order as defined in section 1(1) of that Act. (5) The 1947 Act, as applied by subsection (4), has effect with the omission of the following provisions— (a) Parts 2 and 3 of the First Schedule (compulsory purchase by Ministers and special provisions as to certain descriptions of land); (b) section 116 of the Lands Clauses Consolidation (Scotland) Act 1845 (c. 19) (time limit for exercise of compulsory purchase powers) (that section being incorporated into the 1947 Act by paragraph 1 of the Second Schedule to the 1947 Act). (6) Subsections (2) to (5) are subject to any contrary provision made by the order granting development consent.

Propose a change

126 Compensation for compulsory acquisition

(1) This section applies in relation to an order granting development consent which includes provision authorising the compulsory acquisition of land. (2) The order may not include provision the effect of which is to modify the application of a compensation provision, except to the extent necessary to apply the provision to the compulsory acquisition of land authorised by the order. (3) The order may not include provision the effect of which is to exclude the application of a compensation provision. (4) A compensation provision is a provision of or made under an Act which relates to compensation for the compulsory acquisition of land.

Propose a change

127 Statutory undertakers' land

(1) This section applies in relation to land (“statutory undertakers' land”) if— (a) the land has been acquired by statutory undertakers for the purposes of their undertaking, (b) a representation has been made about an application for an order granting development consent before the completion of the examination of the application, and the representation has not been withdrawn, and (c) as a result of the representation the Secretary of State is satisfied that— (i) the land is used for the purposes of carrying on the statutory undertakers' undertaking, or (ii) an interest in the land is held for those purposes. (2) An order granting development consent may include provision authorising the compulsory acquisition of statutory undertakers' land only to the extent that the Secretary of State is satisfied of the matters set out in subsection (3). (3) The matters are that the nature and situation of the land are such that— (a) it can be purchased and not replaced without serious detriment to the carrying on of the undertaking, or (b) if purchased it can be replaced by other land belonging to, or available for acquisition by, the undertakers without serious detriment to the carrying on of the undertaking. (4) Subsections (2) and (3) do not apply in a case within subsection (5). (5) An order granting development consent may include provision authorising the compulsory acquisition of a right over statutory undertakers' land by the creation of a new right over land only to the extent that the Secretary of State is satisfied of the matters set out in subsection (6). (6) The matters are that the nature and situation of the land are such that— (a) the right can be purchased without serious detriment to the carrying on of the undertaking, or (b) any detriment to the carrying on of the undertaking, in consequence of the acquisition of the right, can be made good by the undertakers by the use of other land belonging to or available for acquisition by them. (7) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . (8) In this section— “statutory undertakers” has the meaning given by section 8 of the Acquisition of Land Act 1981 (c. 67) and also includes the undertakers— which are deemed to be statutory undertakers for the purposes of that Act, by virtue of another enactment; which are statutory undertakers for the purposes of section 16(1) and (2) of that Act (see section 16(3) of that Act). (9) In the application of this section to a statutory undertaker which is a health service body (as defined in section 60(7) of the National Health Service and Community Care Act 1990 (c. 19)), references to land acquired or available for acquisition by the statutory undertakers are to be construed as references to land acquired or available for acquisition by the Secretary of State for use or occupation by the body.

Propose a change

128 Local authority and statutory undertakers' land: general

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Propose a change

129 Local authority and statutory undertakers' land: acquisition by public body

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Propose a change

130 National Trust land

(1) This section applies to land belonging to the National Trust which is held by the Trust inalienably. (2) An order granting development consent is subject to special parliamentary procedure, to the extent that the order authorises the compulsory acquisition of land to which this section applies, if the condition in subsection (3) is met. (3) The condition is that— (a) a representation has been made by the National Trust about the application for the order granting development consent before the completion of the examination of the application, (aa) the representation contains an objection to the compulsory acquisition of the land, and (b) the objection has not been withdrawn. (3A) In a case to which this section applies and to which section 131 or 132 also applies, special parliamentary procedure— (a) may be required by subsection (2) whether or not also required by section 131(3) or 132(2), and (b) may be required by section 131(3) or 132(2) whether or not also required by subsection (2). (4) In this section “held inalienably”, in relation to land belonging to the National Trust, means that the land is inalienable under section 21 of the National Trust Act 1907 (c. cxxxvi) or section 8 of the National Trust Act 1939 (c. lxxxvi). (5) In this section “the National Trust” means the National Trust for Places of Historic Interest or Natural Beauty incorporated by the National Trust Act 1907 (c. cxxxvi).

Propose a change

131 Commons, open spaces etc: compulsory acquisition of land

(1) This section applies to any land forming part of a common, open space or fuel or field garden allotment. (2) This section does not apply in a case to which section 132 applies. (3) An order granting development consent is subject to special parliamentary procedure, to the extent that the order authorises the compulsory acquisition of land to which this section applies, unless— (a) the Secretary of State is satisfied that one of subsections (4) to (5) applies, and (b) that fact, and the subsection concerned, are recorded in the order or otherwise in the instrument or other document containing the order. (4) This subsection applies if— (a) replacement land has been or will be given in exchange for the order land, and (b) the replacement land has been or will be vested in the prospective seller and subject to the same rights, trusts and incidents as attach to the order land. (4A) This subsection applies if— (a) the order land is, or forms part of, an open space, (b) none of the order land is of any of the other descriptions in subsection (1), (c) either— (i) there is no suitable land available to be given in exchange for the order land, or (ii) any suitable land available to be given in exchange is available only at prohibitive cost, and (d) it is strongly in the public interest for the development for which the order grants consent to be capable of being begun sooner than is likely to be possible if the order were to be subject (to any extent) to special parliamentary procedure. (4B) This subsection applies if— (a) the order land is, or forms part of, an open space, (b) none of the order land is of any of the other descriptions in subsection (1), and (c) the order land is being acquired for a temporary (although possibly long-lived) purpose. (5) This subsection applies if— (a) the order land does not exceed 200 square metres in extent or is required for the widening or drainage of an existing highway or partly for the widening and partly for the drainage of such a highway, and (b) the giving in exchange of other land is unnecessary, whether in the interests of the persons, if any, entitled to rights of common or other rights or in the interests of the public. (6) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . (7) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . (8) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . (9) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . (10) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . (11) If an order granting development consent authorises the compulsory acquisition of land to which this section applies, it may include provision— (a) for vesting replacement land given in exchange as mentioned in subsection (4)(a) in the prospective seller and subject to the rights, trusts and incidents mentioned in subsection (4)(b), and (b) for discharging the order land from all rights, trusts and incidents to which it is subject. (12) In this section — “common”, “fuel or field garden allotment” and “open space” have the same meanings as in section 19 of the Acquisition of Land Act 1981 (c. 67); “the order land” means the land authorised to be compulsorily acquired; “the prospective seller” means the person or persons in whom the order land is vested; “replacement land” means land which is not less in area than the order land and which is no less advantageous to the persons, if any, entitled to rights of common or other rights, and to the public.

Propose a change

132 Commons, open spaces etc: compulsory acquisition of rights over land

(1) This section applies to any land forming part of a common, open space or fuel or field garden allotment. (2) An order granting development consent is subject to special parliamentary procedure, to the extent that the order authorises the compulsory acquisition of a right over land to which this section applies by the creation of a new right over land, unless— (a) the Secretary of State is satisfied that one of subsections (3) to (5) applies, and (b) that fact, and the subsection concerned, are recorded in the order or otherwise in the instrument or other document containing the order. (3) This subsection applies if the order land, when burdened with the order right, will be no less advantageous than it was before to the following persons— (a) the persons in whom it is vested, (b) other persons, if any, entitled to rights of common or other rights, and (c) the public. (4) This subsection applies if— (a) replacement land has been or will be given in exchange for the order right, and (b) the replacement land has been or will be vested in the persons in whom the order land is vested and subject to the same rights, trusts and incidents as attach to the order land (ignoring the order granting development consent). (4A) This subsection applies if— (a) the order land is, or forms part of, an open space, (b) none of the order land is of any of the other descriptions in subsection (1), (c) either— (i) there is no suitable land available to be given in exchange for the order right, or (ii) any suitable land available to be given in exchange is available only at prohibitive cost, and (d) it is strongly in the public interest for the development for which the order grants consent to be capable of being begun sooner than is likely to be possible if the order were to be subject (to any extent) to special parliamentary procedure. (4B) This subsection applies if— (a) the order land is, or forms part of, an open space, (b) none of the order land is of any of the other descriptions in subsection (1), and (c) the order right is being acquired for a temporary (although possibly long-lived) purpose. (5) This subsection applies if— (a) the order land does not exceed 200 square metres in extent or the order right is required in connection with the widening or drainage of an existing highway or in connection partly with the widening and partly with the drainage of such a highway, and (b) the giving of other land in exchange for the order right is unnecessary, whether in the interests of the persons, if any, entitled to rights of common or other rights or in the interests of the public. (6) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . (7) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . (8) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . (9) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . (10) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . (11) If an order granting development consent authorises the compulsory acquisition of a right over land to which this section applies by the creation of a new right over land, it may include provision— (a) for vesting replacement land given in exchange as mentioned in subsection (4)(a) in the persons in whom the order land is vested and subject to the rights, trusts and incidents mentioned in subsection (4)(b), and (b) for discharging the order land from all rights, trusts and incidents to which it has previously been subject so far as their continuance would be inconsistent with the exercise of the order right. (12) In this section — “common”, “fuel or field garden allotment” and “open space” have the same meanings as in section 19 of the Acquisition of Land Act 1981 (c. 67); “the order land” means the land to which this section applies over which the order right is to be exercisable; “the order right” means the right authorised to be compulsorily acquired; “replacement land” means land which will be adequate to compensate the following persons for the disadvantages which result from the compulsory acquisition of the order right— the persons in whom the order land is vested, the persons, if any, entitled to rights of common or other rights over the order land, and the public.

Propose a change

133 Rights in connection with underground gas storage facilities

(1) This section applies if— (a) the development to which an order granting development consent relates is development within section 14(1)(c), and (b) the order authorises the compulsory acquisition of one or more rights within subsection (2). (2) The rights are— (a) a right to store gas in underground gas storage facilities; (b) a right to stop up a well, borehole or shaft, or prevent its use by another person; (c) a right of way over land. (3) If the right within subsection (2) is an existing right to store gas in underground gas storage facilities, this Act has effect in relation to the compulsory acquisition of the right with the omission of section 131. (4) If the order authorises the compulsory acquisition of the right by the creation of a new right within subsection (2), this Act has effect in relation to the compulsory acquisition of the right with the omission of sections 127 to 132.

Propose a change

134 Notice of authorisation of compulsory acquisition

(1) This section applies if— (a) an order is made granting development consent, and (b) the order includes provision authorising the compulsory acquisition of land. (2) In this section — “the order land” means— in a case where the order granting development consent authorises the compulsory acquisition of a right over land by the creation of a new right, the land over which the right is to be exercisable; in any other case where the order granting development consent authorises the compulsory acquisition of land, the land authorised to be compulsorily acquired; “the prospective purchaser” means— in a case where the order granting development consent authorises the compulsory acquisition of a right over land by the creation of a new right, the person for whose benefit the order authorises the creation of the right; in any other case where the order granting development consent authorises the compulsory acquisition of land, the person authorised by the order to compulsorily acquire the land. (3) After the order has been made, the prospective purchaser must— (za) make a copy of the order available, at a place in the vicinity of the land, for inspection by the public at all reasonable hours, (a) serve a compulsory acquisition notice ... on each person to whom subsection (4) applies, and (b) affix a compulsory acquisition notice to a conspicuous object or objects on or near the order land. (4) This subsection applies to any person who, if the order granting development consent were a compulsory purchase order, would be a qualifying person for the purposes of section 12(1) of the Acquisition of Land Act 1981 (c. 67) (notice to owners, lessees and occupiers). (5) A compulsory acquisition notice which is affixed under subsection (3)(b) must— (a) be addressed to persons occupying or having an interest in the order land, and (b) so far as practicable, be kept in place by the prospective purchaser until the end of the period of 6 weeks beginning with the date on which the order is published. (6) The prospective purchaser must also publish a compulsory acquisition notice in one or more local newspapers circulating in the locality in which the order land is situated. (6A) The prospective purchaser must send a compulsory acquisition notice to the Chief Land Registrar and it shall be a local land charge in respect of the land in England or Wales to which it relates. (7) A compulsory acquisition notice is a notice in the prescribed form— (a) describing the order land, (b) in a case where the order granting development consent authorises the compulsory acquisition of a right over land by the creation of a new right, describing the right, (c) stating that the order granting development consent includes provision authorising the compulsory acquisition of a right over the land by the creation of a right over it or (as the case may be) the compulsory acquisition of the land, (cza) in a case where the order applies Parts 2 and 3 of the Compulsory Purchase (Vesting Declarations) Act 1981— (i) containing a prescribed statement about the effect of those Parts, and (ii) inviting any person who would be entitled to claim compensation if a declaration were executed under section 4 of that Act to give the prospective purchaser information about the person’s name, address and interest in land, using a prescribed form, (ca) stating where and when a copy of the order is available for inspection in accordance with subsection (3)(za), and (d) stating that a person aggrieved by the order may challenge the order only in accordance with section 118. (8) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Propose a change

135 Orders: Crown land

(1) An order granting development consent may include provision authorising the compulsory acquisition of an interest in Crown land only if— (a) it is an interest which is for the time being held otherwise than by or on behalf of the Crown, and (b) the appropriate Crown authority consents to the acquisition. (2) An order granting development consent may include any other provision applying in relation to Crown land, or rights benefiting the Crown, only if the appropriate Crown authority consents to the inclusion of the provision. (3) The reference in subsection (2) to rights benefiting the Crown does not include rights which benefit the general public. (4) For the purposes of this section “the Crown” includes— (a) the Duchy of Lancaster; (b) the Duchy of Cornwall; (c) the Speaker of the House of Lords; (d) the Speaker of the House of Commons; (e) the Corporate Officer of the House of Lords; (f) the Corporate Officer of the House of Commons.

Propose a change

136 Public rights of way

(1) An order granting development consent may extinguish a public right of way over land only if the Secretary of State is satisfied that— (a) an alternative right of way has been or will be provided, or (b) the provision of an alternative right of way is not required. (2) The following provisions of this section apply if— (a) an order granting development consent makes provision for the acquisition of land, compulsorily or by agreement, (b) the order extinguishes a public right of way over the land, and (c) the right of way is not a right enjoyable by vehicular traffic. (3) The order granting development consent may not provide for the right of way to be extinguished from a date which is earlier than the date on which the order is published. (4) Subsection (5) applies if— (a) the order granting development consent extinguishes the right of way from a date (“the extinguishment date”) which is earlier than the date on which the acquisition of the land is completed, and (b) at any time after the extinguishment date it appears to the Secretary of State that the proposal to acquire the land has been abandoned. (5) The Secretary of State must by order direct that the right is to revive. (6) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . (7) Nothing in subsection (5) prevents the making of a further order extinguishing the right of way.

Propose a change

137 Public rights of way: statutory undertakers' apparatus etc.

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Propose a change

138 Extinguishment of rights, and removal of apparatus, of statutory undertakers etc.

(1) This section applies if an order granting development consent authorises the acquisition of land (compulsorily or by agreement) and— (a) there subsists over the land a relevant right, or (b) there is on, under or over the land relevant apparatus. (2) “Relevant right” means a right of way, or a right of laying down, erecting, continuing or maintaining apparatus on, under or over the land, which— (a) is vested in or belongs to statutory undertakers for the purpose of the carrying on of their undertaking, or (b) is conferred by or in accordance with the electronic communications code on the operator of an electronic communications code network. (3) “Relevant apparatus” means— (a) apparatus vested in or belonging to statutory undertakers for the purpose of the carrying on of their undertaking, or (b) electronic communications apparatus kept installed for the purposes of an electronic communications code network. (4) The order may include provision for the extinguishment of the relevant right, or the removal of the relevant apparatus, only if the Secretary of State is satisfied that the extinguishment or removal is necessary for the purpose of carrying out the development to which the order relates (4A) In this section “statutory undertakers” means persons who are, or are deemed to be, statutory undertakers for the purpose of any provision of Part 11 of TCPA 1990. (4B) In this section— “electronic communications apparatus” has the meaning given in paragraph 5 of the electronic communications code; “electronic communications code” means the code set out in Schedule 3A to the Communications Act 2003; “operator of an electronic communications code network” has the meaning given in paragraph 1(1) of Schedule 17 to the Communications Act 2003; (5) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . (6) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Propose a change

139 Common land and rights of common

(1) An order granting development consent may not include provision the effect of which is to exclude or modify the application of a provision of or made under the Commons Act 2006, except in accordance with section 131 or 132. (2) For the purposes of section 38(6)(a) of the Commons Act 2006, works carried out under a power conferred by an order granting development consent are not to be taken to be carried out under a power conferred by or under an enactment, except in a case to which section 131 or 132 applies. (3) An order granting development consent may not authorise the suspension of, or extinguishment or interference with, registered rights of common, except in accordance with section 131 or 132. (4) “Registered rights of common” means rights of common registered under— (a) the Commons Act 2006, or (b) the Commons Registration Act 1965.

Propose a change

140 Operation of generating stations

An order granting development consent may include provision authorising the operation of a generating station only if the development to which the order relates is or includes the construction or extension of the generating station.

Propose a change

141 Keeping electric lines installed above ground

An order granting development consent may include provision authorising an electric line to be kept installed above ground only if the development to which the order relates is or includes the installation of the line above ground.

Propose a change

142 Use of underground gas storage facilities

An order granting development consent may include provision authorising the use of underground gas storage facilities only if the development to which the order relates is or includes development within section 17(2), (3) or (5).

Propose a change

143 Diversion of watercourses

(1) An order granting development consent may include provision authorising the diversion of any part of a navigable watercourse only if the condition in subsection (2) is met. (2) The new length of watercourse must be navigable in a reasonably convenient manner by vessels of a kind that are accustomed to using the part of the watercourse which is to be diverted. (3) In deciding whether the condition in subsection (2) is met, the effect of any bridge or tunnel must be ignored if the construction of the bridge or tunnel is part of the development for which consent is granted by the order granting development consent. (4) If an order granting development consent includes provision authorising the diversion of any part of a navigable watercourse, the order is also to be taken to authorise the diversion of any tow path or other way adjacent to that part.

Propose a change

144 Highways

(1) An order granting development consent may include provision authorising the charging of tolls in relation to a highway only if a request to that effect has been included in the application for the order. (2) If an order granting development consent includes provision authorising the charging of tolls in relation to a highway, the order is treated as a toll order for the purposes of sections 7 to 18 of the New Roads and Street Works Act 1991 (c. 22). (2A) Subsection (2) does not apply to an order that includes provision authorising other charges in respect of the use or keeping of motor vehicles on roads. (2B) In subsection (2A)— “motor vehicle” has the meaning given in section 185(1) of the Road Traffic Act 1988, except that section 189 of that Act (exceptions: certain pedestrian controlled vehicles and electrically assisted pedal cycles) applies as it applies for the purposes of the Road Traffic Acts; “road” has the meaning given in section 142(1) of the Road Traffic Regulation Act 1984. (3) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Propose a change

145 Harbours

(1) An order granting development consent may include provision for the creation of a harbour authority only if— (a) the development to which the order relates is or includes the construction or alteration of harbour facilities, and (b) the creation of a harbour authority is necessary or expedient for the purposes of the development. (2) An order granting development consent may include provision changing the powers or duties of a harbour authority only if— (a) the development to which the order relates is or includes the construction or alteration of harbour facilities, and (b) the authority has requested the inclusion of the provision or has consented in writing to its inclusion. (3) An order granting development consent may include provision authorising the transfer of property, rights or liabilities from one harbour authority to another only if— (a) the development to which the order relates is or includes the construction or alteration of harbour facilities, and (b) the order makes provision for the payment of compensation of an amount— (i) determined in accordance with the order, or (ii) agreed between the parties to the transfer. (4) An order granting development consent which includes provision for the creation of a harbour authority, or changing the powers or duties of a harbour authority, may also make other provision in relation to the authority. This is subject to subsection (6). (5) Subject to subsection (6), the provision which may be included in relation to a harbour authority includes in particular— (a) any provision in relation to a harbour authority which could be included in a harbour revision order under section 14 of the Harbours Act 1964 (c. 40) by virtue of any provision of Schedule 2 to that Act; (b) provision conferring power on the authority to change provision made in relation to it (by the order or by virtue of this paragraph), where the provision is about— (i) the procedures (including financial procedures) of the authority; (ii) the power of the authority to impose charges; (iii) the power of the authority to delegate any of its functions; (iv) the welfare of officers and employees of the authority and financial and other provision made for them. (6) The order may not include provision— (a) which, by virtue of any other provision of this Act, is not permitted to be included in an order granting development consent; (b) conferring power on a harbour authority to delegate, or makes changes to its powers so as to permit the delegation of, any of the functions mentioned in paragraphs (a) to (f) of paragraph 9B of Schedule 2 to the Harbours Act 1964.

Propose a change

146 Discharge of water

(1) This section applies if— (a) an order granting development consent includes provision authorising the discharge of water into inland waters or underground strata, and (b) but for the order, the person to whom development consent is granted would have had no power to take water, or to require discharges to be made, from the inland waters or other source from which the discharges authorised by the order are intended to be made. (2) The order does not have the effect of conferring any such power on that person.

Propose a change

147 Development of Green Belt land

(1) This section applies if an order granting development consent includes provision— (a) authorising the acquisition of Green Belt land, compulsorily or by agreement, (b) authorising the sale, exchange or appropriation of Green Belt land, or (c) freeing land from any restriction imposed upon it by or under the Green Belt (London and Home Counties) Act 1938 (c. xciii), or by a covenant or other agreement entered into for the purposes of that Act. (2) The Secretary of State must notify the relevant local authorities of the provision made by the order. (3) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . (4) The relevant local authorities are— (a) each local authority in whose area all or part of the land is situated, (b) any local authority in whom all or part of the land is vested, and (c) each contributing local authority. (5) In this section “local authority” and “contributing local authority” have the same meanings as in the Green Belt (London and Home Counties) Act 1938 (c. xciii) (see section 2(1) of that Act).

Propose a change

148 Deemed consent under section 34 of the Coast Protection Act 1949

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Propose a change

149 Deemed licences under Part 2 of the Food and Environment Protection Act 1985

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .