Law

The Offshore Installations (Safety Zones) Order 2025

United Kingdom · regulation

Ask the law about thisMore laws of United KingdomFor machines: Markdown

Open at the publisher →

In force since 2025-03-04, as the publisher states.

Copy read on 2026-11-10. The page it was read from

Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.

sha256 52ec5821e003382676b23dfbff6144d76281be019f8f7c5f0db5cbee31f5efb2

Contents: 4 provisions
  1. Title and introductory text
  2. 1 Citation and commencement
  3. 2 Establishment of safety zones
  4. Schedule Installations

Proposed changes to this act

No one has proposed a change to this act yet.

4 provisions

Title and introductory text

2025 No. 257 OFFSHORE INSTALLATIONS The Offshore Installations (Safety Zones) Order 2025 Made 4th March 2025 Coming into force in accordance with article 1(2) The Secretary of State makes this Order— in exercise of the powers conferred by section 22 of the Petroleum Act 1987; and for the purpose of giving effect to proposals submitted by the Health and Safety Executive under section 24(2A) of that Act.

Propose a change

1 Citation and commencement

(1) This Order may be cited as the Offshore Installations (Safety Zones) Order 2025. (2) This Order comes into force 21 days after the day on which it is made (“the general coming into force date”), except for article 2(2) which comes into force as provided in article 2(3).

Propose a change

2 Establishment of safety zones

(1) A safety zone is established around each installation specified in column 1 of the table in Part 1 of the Schedule (being an installation stationed in waters to which subsection (7) of section 21 of the Petroleum Act 1987 applies) having a radius of 500 metres, as respects that installation, from the point which has the co-ordinates of latitude and longitude according to the World Geodetic System 1984 specified in columns 2 and 3 of the table in Part 1 of the Schedule. (2) A safety zone is established around each installation specified in column 1 of the table in Part 2 of the Schedule (being an installation to be stationed in waters to which subsection (7) of section 21 of the Petroleum Act 1987 applies) having a radius of 500 metres, as respects that installation, from the point which has the co-ordinates of latitude and longitude according to the World Geodetic System 1984 specified in columns 2 and 3 of the table in Part 2 of the Schedule. (3) Paragraph (2) comes into force, as respects each installation— (a) on the general coming into force date, where the installation arrives at its station before that date; and (b) when the installation arrives at its station, in any other case.

Propose a change

Schedule Installations

Article 2 Part 1 Installations stationed at the time this Order is made (1) Name or other designation | (2) Latitude | (3) Longitude Teal West Development, Teal West Field, Block 21/24d | 57° 16.48’N | 0° 46.38’E Victory PLEM (North), Victory Field, Block 207/1a | 60° 58.07’N | 01° 54.61’W Victory PLEM (South), Victory Field, Block 207/1b | 60° 50.11’N | 01° 48.19’W Part 2 Installations not stationed at the time this Order is made (1) Name or other designation | (2) Latitude | (3) Longitude Belinda Wellhead, Belinda Field, Block 21/30f | 57° 03.11’N | 0° 56.63’E Gryphon Alpha, Gryphon Field, Block 9/18 | 59° 21.62’N | 01° 34.16’E

Propose a change

← Find another law