Law

Town and Country Planning (Scotland) Act 1972 (repealed 27.5.1997)

United Kingdom · statute

Ask the law about thisMore laws of United KingdomFor machines: Markdown

Open at the publisher →

In force since 2014-06-30, as the publisher states.

Copy read on 2026-11-08. The page it was read from

Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.

sha256 374b67f6628cc4ed51d06b441d1c946ea931baf7961d270d2d9ec2dcd597270a

Contents: 377 provisions
  1. Title and introductory text
  2. 1 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
  3. 4 Survey of planning districts.
  4. 4A Structure plans.
  5. 5 Preparation of structure plans.
  6. 6 Publicity in connection with preparation of structure plans.
  7. 6A Consultation with other planning authorities.
  8. 7 Approval or rejection of structure plan by Secretary of State.
  9. 8 Alteration of structure plans.
  10. 9 Preparation of local plans.
  11. 10 Publicity in connection with preparation of local plans.
  12. 11 Inquiries, etc. with respect to local plans.
  13. 12 Adoption and approval of local plans.
  14. 13 Alteration of local plans.
  15. 14 Disregarding of representations with respect to development authorised by or under other enactments.
  16. 15 Default powers of Secretary of State.
  17. 16 Supplementary provisions as to structure and local plans.
  18. 17 Meaning of “development plan”.
  19. 18 Commencement of Part II and interim provisions.
  20. 18A Status of development plans.
  21. 19 Meaning of “development” and “new development”.
  22. 20 Development requiring planning permission.
  23. 21 Development orders.
  24. 21A Simplified planning zones.
  25. 21B Simplified planning zone schemes: conditions and limitations on planning permission.
  26. 21C Duration of simplified planning zone scheme.
  27. 21D Alteration of simplified planning scheme.
  28. 21E Exclusion of certain descriptions of land or development.
  29. 22 Form and content of applications.
  30. 23 Publication of notices of applications.
  31. 24 Notice etc. of applications to owners and agricultural tenants.
  32. 25 Publicity for applications affecting conservation areas.
  33. 26 Determination of applications.
  34. 26A Power of planning authority to decline to determine applications.
  35. 26B Assessment of environmental effects.
  36. 27 Conditional grant of planning permission.
  37. 27A Aftercare conditions on permission for winning and working of minerals.
  38. 28 Directions, etc. as to method of dealing with applications.
  39. 28A Permission to develop land without compliance with conditions previously attached.
  40. 29 Planning permission for development already carried out.
  41. 30 Provisions as to effect of planning permission.
  42. 30A Date of planning permission.
  43. 31 Information regarding, and registers of, applications and decisions.
  44. 31A Power of planning authorities to vary planning permission.
  45. 32 Reference of applications to Secretary of State.
  46. 33 Appeals against planning decisions.
  47. 34 Appeal in default of planning decision.
  48. 35 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
  49. 36 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
  50. 37 Development by local authorities and statutory undertakers with sanction of government department.
  51. 38 Limit of duration of planning permission.
  52. 39 Outline planning permission.
  53. 40 Provisions supplementary to ss. 38 and 39.
  54. 41 Termination of planning permission by reference to time limit.
  55. 41A Limit of duration of planning permission for winning and working of minerals.
  56. 42 Power to revoke or modify planning permission.
  57. 43 Unopposed revocation or modification.
  58. 44 Constitution of Planning Inquiry Commission.
  59. 45 References to a Planning Inquiry Commission.
  60. 46 Procedure on reference to a Planning Inquiry Commission.
  61. 47 Commissions to inquire into planning matters affecting Scotland and England.
  62. 48 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
  63. 49 Orders requiring discontinuance of use or alteration or removal of buildings or works.
  64. 49A Prohibition of resumption of winning and working of minerals.
  65. 49B Orders after suspension of winning and working of minerals.
  66. 49C Confirmation and coming into operation of suspension orders.
  67. 49D Registration of suspension orders.
  68. 49E Reviews of suspension orders.
  69. 49F Resumption of winning and working of minerals after suspension order.
  70. 49G . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
  71. 49H Old mining permissions.
  72. 50 Agreements regulating development or use of land.
  73. 51 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
  74. 52 Lists of buildings of special architectural or historic interest.
  75. 53 Control of works for demolition, alteration or extension of listed buildings
  76. 54 Provisions supplementary to s. 53.
  77. 54A Limit on duration of listed building consent.
  78. 54B [Date of listed building consent.
  79. 54C Intimation of notices etc. affecting listed buildings.
  80. 54D Application for variation or discharge of conditions.
  81. 55 Acts causing or likely to result in damage to listed buildings.
  82. 56 Building preservation notice in respect of building not listed.
  83. 56AA Power to restrict exemption of certain ecclesiastical buildings.
  84. 56A [Hazardous substances.
  85. 56B . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
  86. 56C Requirement of hazardous substances consent.
  87. 56D Applications for hazardous substances consent.
  88. 56DA Fees.
  89. 56E Determination of applications for hazardous substances consent.
  90. 56F References to regional planning authority and Secretary of State and appeals.
  91. 56G Deemed hazardous substances consent by virtue of authorisation of government department.
  92. 56H Grants of hazardous substances consent without compliance with conditions previously attached.
  93. 56J Power to revoke or modify hazardous substance consent.
  94. 56K Provisions as to effect of hazardous substances consent and change of control of land.
  95. 56L Offences.
  96. 56M Emergencies.
  97. 56N Registers, etc.
  98. 56O Health and safety requirements.
  99. 57 Planning permission to include appropriate provision for preservation and planting of trees.
  100. 58 Tree preservation orders.
  101. 59 Provisional tree preservation orders.
  102. 59A Trees in conservation areas.
  103. 60 Replacement of trees.
  104. 61 Control of advertisements.
  105. 62 Application for planning permission not needed for advertisements complying with regulations.
  106. 63 Proper maintenance of waste land.
  107. 63A Appeals against waste land notices.
  108. 64 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
  109. 83A Expressions used in connection with enforcement.
  110. 83B Time limits.
  111. 83C Power to require information about activities on land.
  112. 83D Penalties for non-compliance with planning contravention notice.
  113. 84 Issue of enforcement notice.
  114. 84AA Contents and effect of notice.
  115. 84AB Variation and withdrawal of enforcement notices.
  116. 84A . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
  117. 85 Appeal against enforcement notice.
  118. 86 Offence where enforcement notice not complied with.
  119. 87 Stop Notices.
  120. 87AA Enforcement of conditions.
  121. 87A Register of waste land, enforcement and stop notices.
  122. 88 Execution and cost of works required by enforcement notice.
  123. 89 Enforcement notice to have effect against subsequent development.
  124. 89A Effect of planning permission, etc., on enforcement or breach of condition notice.
  125. 90 Certificate of lawfulness of existing use or development.
  126. 90A Certificate of lawfulness of proposed use or development.
  127. 90B Certificates under sections 90 and 90A: supplementary provisions.
  128. 90C Offences.
  129. 91 Grant of certificate by Secretary of State on referred application or appeal against refusal.
  130. 91A Right to enter without warrant.
  131. 91B Right to enter under warrant.
  132. 91C Rights of entry: supplementary provisions.
  133. 92 Power to serve listed building enforcement notice.
  134. 93 Appeal against listed building enforcement notice.
  135. 94 Offence where listed building enforcement notice not complied with.
  136. 95 Execution and cost of works required by listed building enforcement notice.
  137. 95A Effect of listed building consent on listed building enforcement
  138. 96 Enforcement by, or by direction of, the Secretary of State.
  139. 97 Urgent works to preserve building.
  140. 97A Recovery of expenses of works under s. 97.
  141. 97AB Further provision as to rights of entry in relation to listed buildings.
  142. 97AC Rights of entry in relation to listed buildings: supplementary provisions.
  143. 97B Power to issue hazardous substances contravention notice.
  144. 97BA Variation of hazardous substances contravention notices.
  145. 97BB Further provision as to rights of entry in relation to hazardous substances control.
  146. 97BC Rights of entry in relation to hazardous substances control: supplementary provisions.
  147. 98 Penalties for non-compliance with tree preservation order.
  148. 99 Enforcement of duties as to replacement of trees.
  149. 99A Rights to enter without warrant.
  150. 99B Right to enter under warrant.
  151. 99C Rights of entry: supplementary provisions.
  152. 100 Enforcement of orders under sections 49, 49A and 49B.
  153. 101 Enforcement of control as to advertisements.
  154. 101A Power to remove or obliterate placards and posters.
  155. 102 Compulsory acquisition of land in connection with development and for other planning purposes.
  156. 103 Compulsory acquisition of land by Secretary of State for the Environment.
  157. 104 Compulsory acquisition of listed building in need of repair.
  158. 105 Repairs notice as preliminary to compulsory acquisition under s. 104.
  159. 106 Compensation on compulsory acquisition of listed building.
  160. 107 Minimum compensation in case of listed building deliberately left derelict.
  161. 108 Extinguishment of rights over land compulsorily acquired.
  162. 109 Acquisition of land by agreement.
  163. 110 Acquisition of land for purposes of exchange.
  164. 111 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
  165. 112 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
  166. 113 Disposal of land held for planning purposes.
  167. 114 Development of land held for planning purposes.
  168. 115 Special provisions as to features and buildings of architectural and historic interest.
  169. 116 Management etc. of listed buildings acquired by. . . planning authority or Secretary of State.
  170. 117 Power to override servitudes and other rights.
  171. 118 Provisions as to churches and burial grounds.
  172. 119 Use and development of land for open spaces.
  173. 120 Displacement of persons from land acquired or appropriated.
  174. 121 Modification of incorporated enactments for purposes of Part VI.
  175. 122 Interpretation of Part VI.
  176. 123 . . ..
  177. 124 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
  178. 125 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
  179. 126 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
  180. 127 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
  181. 128 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
  182. 129 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
  183. 130 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
  184. 131 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
  185. 132 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
  186. 133 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
  187. 134 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
  188. 135 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
  189. 136 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
  190. 137 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
  191. 138 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
  192. 139 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
  193. 140 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
  194. 141 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
  195. 142 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
  196. 143 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
  197. 144 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
  198. 145 Determination of claims.
  199. 146 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
  200. 147 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
  201. 148 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
  202. 149 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
  203. 150 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
  204. 151 .
  205. 152 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
  206. 153 Compensation where planning permission revoked or modified.
  207. 153A . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
  208. 154 Application of s. 153 to special cases of refusal or conditional grant of planning permission.
  209. 155 Recording and apportionment of compensation for depreciation.
  210. 156 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
  211. 156A Recovery of compensation on subsequent development.
  212. 156B Amount recoverable, and provisions for payment or remission thereof.
  213. 157 Recovery, on subsequent development, of compensation under s. 153.
  214. 158 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
  215. 159 Compensation in respect of orders under s. 49.
  216. 159A . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
  217. 159B . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
  218. 160 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
  219. 161 Compensation where listed building consent revoked or modified.
  220. 162 Compensation for loss or damage caused by service of building preservation notice.
  221. 163 Compensation in respect of tree preservation orders.
  222. 164 Compensation in respect of requirement as to replanting of trees.
  223. 165 Compensation for restrictions on advertising.
  224. 166 Compensation for loss due to stop notice.
  225. 167 General provisions as to compensation for depreciation under Part VIII.
  226. 167A Regulations as to compensation in respect of orders relating to mineral working.
  227. 167B . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
  228. 167C . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
  229. 168 Determination of claims for compensation.
  230. 169 Purchase notice on refusal or conditional grant of planning permission.
  231. 170 Action by. . . planning authority on whom purchase notice is served.
  232. 171 Procedure on reference of purchase notice to Secretary of State.
  233. 172 Action by Secretary of State in relation to purchase notice.
  234. 173 Power to refuse to confirm purchase notice where land has restricted use by virtue of previous planning permission.
  235. 174 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
  236. 175 Effect of Secretary of State’s action in relation to purchase notice.
  237. 176 Special provisions as to compensation where purchase notice served.
  238. 177 Purchase notice in respect of order revoking or modifying planning permission.
  239. 178 Purchase notice in respect of order requiring discontinuance of use or alteration or removal of buildings or works.
  240. 179 Purchase notice on refusal or conditional grant of listed building consent.
  241. 180 Purchase notices in other cases.
  242. 180A Public telecommunications operators.
  243. 181 Scope of these provisions.
  244. 182 Power to serve blight notice.
  245. 183 Objection to blight notice.
  246. 184 Reference of objection to Lands Tribunal.
  247. 185 Effect of valid blight notice.
  248. 186 Compensation for compulsory purchase of historic buildings and of land in clearance areas.
  249. 187 Withdrawal of blight notice.
  250. 188 Effect on powers of compulsory acquisition of counter-notice disclaiming intention to acquire.
  251. 189 Death of claimant after service of blight notice.
  252. 190 Power of heritable creditor to serve blight notice.
  253. 191 Saving for claimant’s right to sell whole hereditament, etc.
  254. 192 Meaning of “owner-occupier” and “resident owner-occupier”.
  255. 193 Special provisions as to partnerships.
  256. 194 “Appropriate authority” for purposes of these provisions.
  257. 195 “Appropriate enactment” for purposes of these provisions.
  258. 196 General interpretation of these provisions.
  259. 197 No withdrawal of constructive notice to treat.
  260. 198 Highways affected by development: orders by Secretary of State.
  261. 198A Highways affected by development: orders by planning authorities.
  262. 199 Footpaths and bridleways affected by development: orders by local planning authorities.
  263. 200 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
  264. 201 Order extinguishing right to use vehicles on highway.
  265. 202 Provision of amenity for highway reserved to pedestrians.
  266. 203 Extinguishment of public rights of way over land held for planning purposes.
  267. 204 Procedure for making of orders by Secretary of State.
  268. 205 Procedure in anticipation of planning permission, etc.
  269. 205A Further procedure in anticipation of planning permission etc.
  270. 206 Confirmation of orders made by other authorities.
  271. 207 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
  272. 208 Concurrent proceedings in connection with highways.
  273. 209
  274. 210 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
  275. 210A Recovery of costs of making orders relating to roads, paths etc.
  276. 211 Meaning of “operational land”.
  277. 212 Cases in which land is to be treated as not being operational land.
  278. 213 Meaning of “the appropriate Minister”.
  279. 214 Applications for planning permission by statutory undertakers.
  280. 215 Development requiring sanction of government department.
  281. 216 Revocation or modification of permission to develop operational land.
  282. 217 Order requiring discontinuance of use etc. of operational land.
  283. 218 Acquisition of land of statutory undertakers.
  284. 219 Extinguishment of rights of way, and rights as to apparatus, of statutory undertakers.
  285. 220 Orders under s. 219.
  286. 221 Notice for same purposes as s. 219 but given by statutory undertakers to developing authority.
  287. 222 Extension or modification of functions of statutory undertakers.
  288. 223 Procedure in relation to orders under s. 222.
  289. 224 Relief of statutory undertakers from obligations rendered impracticable.
  290. 225 Objections to orders under ss. 222 and 224.
  291. 226 Right to compensation in respect of certain decisions and orders.
  292. 227 Measure of compensation to statutory undertakers.
  293. 228 Exclusion of s. 227 at option of statutory undertakers.
  294. 229 Procedure for assessing compensation where s. 227 applies.
  295. 229A . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
  296. 230 Special provisions as to display of advertisements on operational land.
  297. 231 Validity of development plans and certain orders, decisions and directions.
  298. 232 Proceedings for questioning validity of structure plans, etc.
  299. 233 Proceedings for questioning validity of other orders, decisions and directions.
  300. 234 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
  301. 235 Special provisions as to decisions relating to statutory undertakers.
  302. 236 Special provisions as to orders subject to special parliamentary procedure.
  303. 237 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
  304. 240 Grants for research and education.
  305. 241 Contributions by Ministers towards compensation paid by local authorities.
  306. 242 Contributions by local authorities and statutory undertakers.
  307. 243 Assistance for acquisition of property where objection made to blight notice in certain cases.
  308. 244 Recovery from acquiring authorities of sums paid by way of compensation.
  309. 245 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
  310. 246 Sums recoverable from acquiring authorities reckonable for purposes of grant.
  311. 247 Expenses of government departments.
  312. 248 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
  313. 249 General provision as to receipts of Secretary of State.
  314. 250 Expenses of, and borrowing by, local authorities.
  315. 251 Power to modify Act in relation to minerals.
  316. 251A . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
  317. 252 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
  318. 253 Exercise of powers in relation to Crown land.
  319. 254 Agreements relating to Crown land.
  320. 255 Supplementary provisions as to Crown interest.
  321. 256 Application to. . . planning authorities of provisions as to planning control and enforcement.
  322. 257 Application to. . . planning authorities of provisions as to listed buildings.
  323. 257A Application to planning authorities of provisions as to hazardous substances control.
  324. 258 Special provisions as to statutory undertakers who are. . . planning authorities.
  325. 259 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
  326. 260 Default powers of Secretary of State.
  327. 260A Interdicts restraining breaches of planning control.
  328. 261 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
  329. 262 Designation of conservation areas.
  330. 262A [Control of demolition in conservation areas.
  331. 262B [Formulation and publication of proposals for preservation and enhancement of conservation areas.
  332. 262C National Scenic Areas.
  333. 263 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
  334. 264 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
  335. 265 Rights of entry.
  336. 266 Supplementary provisions as to rights of entry.
  337. 267 Local inquiries.
  338. 267A Orders as to expenses of parties where no local inquiry held.
  339. 267B Procedure on certain appeals and applications.
  340. 268 Inquiries under Private Legislation Procedure (Scotland) Act 1936.
  341. 269 Service of notices.
  342. 270 Power to require information as to interests in land.
  343. 271 Offences by corporations.
  344. 272 Combined applications.
  345. 273 Regulations and orders.
  346. 274 Act not excluded by special enactments.
  347. 275 Interpretation.
  348. 276 Consequential amendments.
  349. 277 Transitional provisions, savings and repeals.
  350. 278 General vesting declarations.
  351. 279 Commencement of certain provisions.
  352. 280 Commencement.
  353. 281 Citations and extent.
  354. SCHEDULES 1 AND 2
  355. SCHEDULES 3 AND 4
  356. SCHEDULE 5 Development Plans: Transition from Schedule 3 to Part II of this Act
  357. SCHEDULE 6 Development not Constituting New Development
  358. SCHEDULE 6A Simplified Planning Zone Schemes
  359. SCHEDULE 7 Determination of Certain Appeals by Person Appointed by Secretary of State
  360. SCHEDULE 8 Construction of References in Sections 45 and 46 to “The Responsible Minister or Ministers”
  361. SCHEDULE 9 Joint Planning Inquiry Commissions
  362. SCHEDULE 10 Control of Works for Demolition, Alteration or Extension of Listed Buildings
  363. Schedule 10a Registration of old mining permissions
  364. SCHEDULE 11
  365. [SCHEDULE 12 Provisions as to Established use Certificates]
  366. SCHEDULE 13 Adjustment of Claim Holdings
  367. SCHEDULE 14
  368. SCHEDULE 15
  369. SCHEDULE 16 Condition Treated as Applicable to Rebuilding and Alterations
  370. SCHEDULE 17 Proceedings on Listed Building Purchase Notice
  371. SCHEDULE 18 Procedure in connection with Orders relating to Footpaths and Bridleways
  372. SCHEDULE 19 Provisions of this Act referred to in Sections 250, 251, 256, 257 and 259 and Paragraphs 70 and 71 of Schedule 22
  373. SCHEDULE 20 Enactments Exempted from Section 273(6) of this Act
  374. SCHEDULE 21 Consequential Amendments
  375. SCHEDULE 22 Transitional Provisions and Savings
  376. SCHEDULE 23 Repeals
  377. SCHEDULE 24 General Vesting Declarations

Proposed changes to this act

No one has proposed a change to this act yet.

377 provisions

30 Provisions as to effect of planning permission.

(1) Without prejudice to the provisions of this Part of this Act as to the duration, revocation or modification of planning permission, any grant of planning permission to develop land shall (except in so far as the permission otherwise provides) enure for the benefit of the land and of all persons for the time being interested therein. (2) Where planning permission is granted for the erection of a building, the grant of permission may specify the purposes for which the building may be used; and if no purpose is so specified, the permission shall be construed as including permission to use the building for the purpose for which it is designed.

Propose a change

30A Date of planning permission.

The date of the granting or of the refusal of any such application as is mentioned in section 23(2) of this Act shall be the date on which the notice of the planning authority’s decision bears to have been signed on behalf of the authority.

Propose a change

31 Information regarding, and registers of, applications and decisions.

(1) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . (2) Every. . . planning authority shall keep, in such manner as may be prescribed by such regulations or the order, a register containing such information as may be so prescribed with respect to applications for planning permission made to that authority, including information as to the manner in which such applications have been dealt with. . . and also containing such information as may be so prescribed with respect to simplified planning zone schemes relating to zones in the authority’s area. (2A) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . (3) Regulations under this Act or a development order make provision for the register to be kept in two or more parts, each part containing such information relating to applications for planning permission made to the authority as may be prescribed by such regulations or the order, and may also make provision— (a) for a specified part of the register to contain copies of applications and of any plans or drawings submitted therewith; and (b) for the entry relating to any application, and every thing relating thereto, to be removed from that part of the register when the application (including any appeal arising out of it) has been finally disposed of, without prejudice to the inclusion of any different entry relating thereto in another part of the register. (4) Every register kept under this section shall be available for inspection by the public at all reasonable hours. (5) The provisions of this section shall apply in relation to applications for an approval required by such regulations or the order as they apply in relation to applications for planning permission.

Propose a change

31A Power of planning authorities to vary planning permission.

Notwithstanding any other provision of this Part of this Act, a planning authority may, at the request of the grantee or of a person acting with his consent, vary any planning permission granted by them, if it appears to them that the variation sought is not material.

Propose a change

32 Reference of applications to Secretary of State.

(1) The Secretary of State may give directions requiring, any such application as is mentioned in section 23(2) of this Act, to be referred to him instead of being dealt with by. . . planning authorities. (2) a direction under this section— (a) may be given either to a particular. . . planning authority or to. . . planning authorities generally; and (b) may relate either to a particular application or to applications of a class specified in the direction. (3) Any application in respect of which a direction under this section has effect shall be referred to the Secretary of State accordingly. (4) Subject to subsection (5) of this section, where an application. . . is referred to the Secretary of State under this section, the following provisions of this Act, that is to say, sections 26(1) to (3A),, 27(1), 27A, 28A and 29 shall apply, with any necessary modifications, as they apply to an application. . . which falls to be determined by the. . . planning authority and regulations under this Act or a development order may apply, with or without modifications, to an application so referred any requirements imposed by such regulations or such an order by virtue of section 23 or 24 of this Act.. (5) Before determining an application referred to him under this section, other than an application for planning permission referred to a Planning Inquiry Commission under section 45 of this Act, the Secretary of State shall, if either the applicant or the. . . planning authority so desire, afford to each of them an opportunity of appearing before, and being heard by, a person appointed by the Secretary of State for the purpose. (6) The decision of the Secretary of State on any application referred to him under this section shall be final. (7) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Propose a change

33 Appeals against planning decisions.

(1) Where an application is made to a. . . planning authority (a) for planning permission to develop land; (b) for an approval of that authority required under a development order; or (c) for any consent, agreement or approval of that authority required by a condition imposed on a grant of planning permission, and that permission, consent, agreement or approval is refused by that authority or is granted by them subject to conditions, the applicant, if he is aggrieved by their decision, may by notice under this section appeal to the Secretary of State. (2) Any notice under this section shall be served within such time (not being less than twenty-eight days from the date of notification of the decision to which it relates) and in such manner as may be prescribed by regulations under this Act or a development order. (3) Where an appeal is brought under this section from a decision of a. . . planning authority, the Secretary of State, subject to the following provisions of this section, may allow or dismiss the appeal, or may reverse or vary any part of the decision of the. . . planning authority, whether the appeal relates to that part thereof or not, and may deal with the application as if it had been made to him in the first instance. Provided that where the Secretary of State proposes to reverse or vary any part of the decision of the. . . planning authority to which the appeal does not relate, he shall give notice of his intention to the. . . planning authority and to the applicant and shall afford to them an opportunity to make representations in regard thereto. (4) Before determining an appeal under this section, other than an appeal referred to a Planning Inquiry Commission under section 45 of this Act, the Secretary of State shall, if either the applicant or the. . . planning authority so desire, afford to each of them an opportunity of appearing before, and being heard by, a person appointed by the Secretary of State for the purpose. (5) Subject to subsection (4) of this section, the following provisions of this Act, that is to say, sections . . . 26(1) to (3A), 27(1) 27A and 28A, 27A and 29 shall apply, with any necessary modifications, in relation to an appeal to the Secretary of State under this section as they apply in relation to an application for planning permission which falls to be determined by the. . . planning authority and regulations under this Act or a development order may apply, with or without modifications, to such an appeal any requirements imposed by regulations or such an order by virtue of section 23 or 24 of this Act. (6) The decision of the Secretary of State on any appeal under this section shall be final. (7) If before or during the determination of an appeal under this section in respect of an application for planning permission to develop land, the Secretary of State forms the opinion that, having regard to the provisions of sections 26(1), and 27(1) of this Act ,any regulations made under this Act in that regard and of any development order and to any directions given under such regulations or such order, planning permission for that development— (a) could not have been granted by the. . . planning authority; or (b) could not have been granted by them otherwise than subject to the conditions imposed by them, he may decline to determine the appeal or to proceed with the determination. (7A) If at any time before or during the determination of an appeal under this section it appears to the Secretary of State that the appellant is responsible for undue delay in the progress of the appeal, he may— (a) give the appellant notice that the appeal will be dismissed unless the appellant takes, within the period specified in the notice, such steps as are specified in the notice for the expedition of the appeal; and (b) if the appellant fails to take those steps within that period, dismiss the appeal accordingly. (8) Subject to section 279 of this Act, Schedule 7 to this Act applies to appeals under this section, including appeals under this section as applied by or under any other provision of this Act.

Propose a change

34 Appeal in default of planning decision.

Where any such application as is mentioned in section 33(1) of this Act is made to a planning authority, then unless within such period as may be prescribed by regulations under this Act or a development order, or within such extended period as may at any time be agreed upon in writing between the applicant and the. . . planning authority, the. . . planning authority . . . — (a) give notice to the applicant of their decision on the application; or (ab) give notice to the applicant that they have exercised their power under section 26A of this Act to decline to determine the application; or (b) give notice to him that the application has been referred to the Secretary of State in accordance with directions given under section 32 of this Act, the provisions of section 33 of this Act shall apply in relation to the application as if the permission or approval to which it relates had been refused by the. . . planning authority, and as if notification of their decision had been received by the applicant at the end of the period prescribed by regulations under this Act or a development order, or at the end of the said extended period, as the case may be.

Propose a change

35 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Propose a change

36 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Propose a change

37 Development by local authorities and statutory undertakers with sanction of government department.

(1) Where the sanction of a government department. . . is required by virtue of an enactment in respect of development to be carried out by a local authority, or by statutory undertakers not being a local authority, that department may, on granting that sanction, direct that planning permission for that development shall be deemed to be granted, subject to such conditions (if any) as may be specified in the directions. (2) The provisions of this Act (except Part XII thereof) shall apply in relation to any planning permission deemed to be granted by virtue of directions under this section as if it had been granted by the Secretary of State on an application referred to him under section 32 of this Act. (3) For the purposes of this section development shall be taken to be sanctioned by a government department if— (a) any consent, authority or approval to or for the development is granted by the department in pursuance of an enactment; (b) a compulsory purchase order is confirmed by the department authorising the purchase of land for the purpose of the development; (c) consent is granted by the department to the appropriation of land for the purpose of the development or the acquisition of land by agreement for that purpose; (d) authority is given by the department for the borrowing of money for the purpose of the development, or for the application for that purpose of any money not otherwise so applicable; or (e) any undertaking is given by the department to pay a grant in respect of the development in accordance with an enactment authorising the payment of such grants, and references in this section to the sanction of a government department shall be construed accordingly.

Propose a change

38 Limit of duration of planning permission.

(1) Subject to the provisions of this section, every planning permission granted or deemed to be granted shall be granted or, as the case may be, be deemed to be granted, subject to the condition that the development to which it relates must be begun not later than the expiration of— (a) five years beginning with the date on which the permission is granted or, as the case may be, deemed to be granted; or (b) such other period (whether longer or shorter) beginning with the said date as the authority concerned with the terms of the planning permission may direct, being a period which the authority considers appropriate having regard to the provisions of the development plan and to any other material considerations. (2) If planning permission is granted without the condition required by subsection (1) of this section, it shall be deemed to have been granted subject to the condition that the development to which it relates must be begun not later than the expiration of five years beginning with the date of the grant. (3) Nothing in this section applies— (a) to any planning permission granted by a development order; (aa) to any planning permission granted by an enterprise zone scheme; (ab) to any planning permission granted by a simplified planning zone scheme; (b) to any planning permission granted for a limited period; (bb) to any planning permission for development consisting of the winning and working of minerals or involving the depositing of mineral waste which is granted (or deemed to be granted) subject to a condition that the development to which it relates must be begun before the expiration of a specified period after— (i) the completion of other development consisting of the winning and working of minerals already being carried out by the applicant for the planning permission; or (ii) the cessation of depositing of mineral waste already being carried out by the applicant for the planning permission; (c) to any planning permission for any development carried out before the grant of planning permission (d) to any outline planning permission, as defined by section 39 of this Act.

Propose a change

39 Outline planning permission.

(1) In this section and section 38 of this Act “outline planning permission” means planning permission granted, in accordance with the provisions of regulations under this Act ora development order, with the reservation for subsequent approval by the. . . planning authority or the Secretary of State of matters (referred to in this section as “reserved matters”) not particularised in the application. (2) Subject to the provisions of this section, where outline planning permission is granted for development consisting in or including the carrying out of building or other operations, it shall be granted subject to conditions to the following effect— (a) that, in the case of any reserved matter, application for approval must be made before— (i) the expiration of 3 years from the date of the grant of outline planning permission; or (ii) the expiration of 6 months from the date on which an earlier application for such approval was refused; or (iii) the expiration of 6 months from the date on which an appeal against such refusal was dismissed, whichever is the latest: Provided that only one such application may be made in the case after the expiration of the 3 year period mentioned in sub-paragraph (i) above; and (b) that the development to which the permission relates must be begun not later than whichever is the later of the following dates— (i) the expiration of five years from the date of the grant of outline planning permission; or (ii) the expiration of two years from the final approval of the reserved matters or, in the case of approval on different dates, the final approval of the last such matter to be approved. (3) If outline planning permission is granted without the conditions required by subsection (2) of this section, it shall be deemed to have been granted subject to those conditions. (4) The authority concerned with the terms of an outline planning permission may, in applying subsection (2) of this section, substitute, or direct that there be substituted, for the periods of three years, five years or two years referred to in that subsection such other periods respectively (whether longer or shorter) as they consider appropriate. (5) The said authority may, in applying the said subsection, specify, or direct that there be specified, separate periods under paragraph (a) of the subsection in relation to separate parts of the development to which the planning permission relates; and, if they do so, the condition required by paragraph (b) of the subsection shall then be framed correspondingly by reference to those parts, instead of by reference to the development as a whole. (6) In considering whether to exercise their powers under subsections (4) and (5) of this section, the said authority shall have regard to the provisions of the development plan and to any other material considerations.

Propose a change

40 Provisions supplementary to ss. 38 and 39.

(1) For the purposes of sections 38 and 39 of this Act, development shall be taken to be begun on the earliest date on which any specified operation comprised in the development begins to be carried out. (2) In subsection (1) of this section “specified operation” means any of the following, that is to say— (a) any work of construction in the course of the erection of a building; (aa) any work of demolition of a building; (b) the digging of a trench which is to contain the foundations, or part of the foundations, of a building; (c) the laying of any underground main or pipe to the foundations, or part of the foundations, of a building or to any such trench as is mentioned in the last preceding paragraph; (d) any operation in the course of laying out or constructing a road or part of a road; (e) any change in the use of any land, where that change constitutes material development. (3) In subsection (2)(e) of this section “material development” means any development other than— (a) development for which planning permission is granted by a general development order for the time being in force and which is carried out so as to comply with any condition or limitation subject to which planning permission is so granted; (b) development of a class specified in paragraph 1 or 2 of Schedule 6 to this Act; (c) development of any class prescribed for the purposes of this subsection; and in this subsection “general development order” means a development order made as a general order applicable (subject to such exceptions as may be specified therein) to all land in Scotland. (4) The authority referred to in sections 38(1)(b) and 39(4) of this Act is the. . . planning authority or the Secretary of State, in the case of planning permission granted by them, and— (a) in the case of planning permission under section 37 of this Act is the department on whose direction planning permission is deemed to be granted; and (b) in the case of planning permission granted on an appeal determined, under paragraph 1 or 4 of Schedule 7 to this Act, by a person appointed by the Secretary of State to determine the appeal, is that person. (5) For the purposes of section 39 of this Act, a reserved matter shall be treated as finally approved when an application for approval is granted or, in a case where the application is made to the. . . planning authority and there is an appeal to the Secretary of State against the authority’s decision on the application and the Secretary of State or a person appointed by him under paragraph 1 or 4 of Schedule 7 to this Act to determine the appeal grants the approval, on the date of the determination of the appeal by the Secretary of State or that person. (6) Where a. . . planning authority grant planning permission, the fact that any of the conditions of the permission are required by the provisions of sections 38 or 39 of this Act to be imposed, or are deemed by those provisions to be imposed, shall not prevent the conditions being the subject of an appeal under section 33 of this Act against the decision of the authority. (7) In the case of planning permission (whether outline or other) having conditions attached to it by or under section 38 or 39 of this Act— (a) development carried out after the date by which the conditions of the permission require it to be carried out shall be treated as not authorised by the permission; and (b) an application for approval of a reserved matter, if it is made after the date by which the conditions require it to be made, shall be treated as not made in accordance with the terms of the permission.

Propose a change

41 Termination of planning permission by reference to time limit.

(1) The following provisions of this section shall have effect where, by virtue of section 38 or 39 of this Act, a planning permission is subject to a condition that the development to which the permission relates must be begun before the expiration of a particular period and that development has been begun within that period but the period has elapsed without the development having been completed. (2) If the. . . planning authority are of opinion that the development will not be completed within a reasonable period, they may serve a notice (in this section referred to as a “completion notice”) stating that the planning permission will cease to have effect at the expiration of a further period specified in the notice, being a period of not less than twelve months after the notice takes effect. (3) a completion notice— (a) shall be served on the owner and on the occupier of the land and on any other person who in the opinion of the. . . planning authority will be affected by the notice; and (b) shall take effect only if and when it is confirmed by the Secretary of State, who may in confirming it substitute some longer period for that specified in the notice as the period at the expiration of which the planning permission is to cease to have effect. (4) If, within such period as may be specified in a completion notice (not being less than twenty-eight days from the service thereof) any person on whom the notice is served so requires, the Secretary of State, before confirming the notice, shall afford to that person and to the. . . planning authority an opportunity of appearing before, and being heard by, a person appointed by the Secretary of State for the purpose. (5) If a completion notice takes effect, the planning permission therein referred to shall at the expiration of the period specified in the notice, whether the original period specified under subsection (2) of this section or a longer period substituted by the Secretary of State under subsection (3) of this section, be invalid except so far as it authorises any development carried out thereunder up to the end of that period. (6) The. . . planning authority may withdraw a completion notice at any time before the expiration of the period specified therein as the period at the expiration of which the planning permission is to cease to have effect; and if they do so they shall forthwith give notice of the withdrawal to every person who was served with the completion notice.

Propose a change

41A Limit of duration of planning permission for winning and working of minerals.

(1) Every planning permission for development — (a) consisting of the winning and working of minerals; or (b) involving the depositing of mineral waste, shall be subject to a condition as to the duration of the development. (2) Except where a condition is specified under subsection (3) of this section the condition in the case of planning permission granted or deemed to be granted after the date of the commencement of section 24 of the Town and Country Planning (Minerals) Act 1981 is that the winning and working of minerals or the depositing of mineral waste must cease not later than the expiration of the period of sixty years beginning with the date of the permission. (3) An authority granting planning permission after the date of the commencement of the said section 24 or directing after that date that planning permission shall be deemed to be granted may specify a longer or shorter period than sixty years, and if they do so, the condition is that the winning and working of minerals or the depositing of mineral waste must cease not later than the expiration of a period of the specified length beginning with the date of the permission. (4) A longer or shorter period than sixty years may be prescribed for the purposes of subsections (2) and (3) of this section. (5) The condition in the case of planning permission granted or the commencement of section 24 of the Town and Country Planning (Minerals) Act 1981 is that the winning and working of minerals or the depositing of mineral waste must cease not later than the expiration of the period of sixty years beginning with the date of the commencement of that section. (6) A condition to which planning permission for development . . . is subject by virtue of this section is not to be regarded for the purposes of this Act as a condition such as is mentioned in subsection (1)(b) of section 27 of this Act. (7) Where planning permission for development . . . is granted by the planning authority, any condition to which it is subject by virtue of this section is to be regarded for the purposes of section 33 of this Act as a condition imposed by a decision of the planning authority, and may accordingly be the subject of an appeal under that section.

Propose a change

42 Power to revoke or modify planning permission.

(1) If it appears to the. . . planning authority, having regard to the development plan and to any other material considerations, that it is expedient to revoke or modify any permission to develop land granted on an application made under this Part of this Act, the authority, subject to the following provisions of this section, may by order revoke or modify the permission to such extent as (having regard to those matters) they consider expedient. (2) Except as provided in section 43 of this Act, an order under this section shall not take effect unless it is confirmed by the Secretary of State; and the Secretary of State may confirm any such order submitted to him either without modification or subject to such modifications as he considers expedient. (3) Where a. . . planning authority submit an order to the Secretary of State for his confirmation under this section, the authority shall serve notice on the owner, on the lessee and on the occupier of the land affected and on any other person who in their opinion will be affected by the order; and if within such period as may be specified in that notice (not being less than twenty-eight days from the service thereof) any person on whom the notice is served so requires, the Secretary of State, before confirming the order, shall afford to that person and to the. . . planning authority an opportunity of appearing before, and being heard by, a person appointed by the Secretary of State for the purpose. (4) The power conferred by this section to revoke or modify permission to develop land may be exercised— (a) where the permission relates to the carrying out of building or other operations, at any time before those operations have been completed; (b) where the permission relates to a change of the use of any land, at any time before the change has taken place: Provided that the revocation or modification of permission for the carrying out of building or other operations shall not affect so much of those operations as has been carried out before the date on which the order was confirmed as aforesaid. (5) An order under this section may include any such aftercare condition as the planning authority think fit if— (a) it also includes a restoration condition; or (b) a restoration condition has previously been imposed in relation to the land by virtue of any provision of this Act. (6) Subsections (3) to (19) of section 27A of this Act shall apply in relation to an aftercare condition so imposed as they apply in relation to such a condition imposed under that section.

Propose a change

43 Unopposed revocation or modification.

(1) The following provisions shall have effect where the. . . planning authority have made an order under section 42 of this Act but have not submitted the order to the Secretary of State for confirmation by him, and— (a) the owner, the lessee and the occupier of the land and all persons who in the authority’s opinion will be affected by the order have notified the authority in writing that they do not object to the order;. . . . (2) The authority shall advertise in the prescribed manner the fact that the order has been made, and the advertisement shall specify— (a) the period (not being less than twenty-eight days from the date on which the advertisement first appears) within which persons affected by the order may give notice to the Secretary of State that they wish for an opportunity of appearing before, and being heard by, a person appointed by the Secretary of State for the purpose; and (b) the period (not being less than fourteen days from the expiration of the period referred to in paragraph (a) of this subsection) at the expiration of which, if no such notice is given to the Secretary of State, the order may take effect by virtue of this section and without being confirmed by the Secretary of State. (3) The authority shall also serve notice to the same effect on the persons mentioned in subsection (1)(a) of this section,. . . . (4) The authority shall send a copy of any advertisement published under subsection (2) of this section to the Secretary of State, not more than three days after the publication. (5) If within the period referred to in subsection (2)(a) of this section no person claiming to be affected by the order has given notice to the Secretary of State as aforesaid, and the Secretary of State has not directed that the order be submitted to him for confirmation, the order shall, at the expiration of the period referred to in subsection (2)(b) of this section, take effect by virtue of this section and without being confirmed by the Secretary of State as required by section 42(2) of this Act. (6) This section does not apply to an order revoking or modifying a planning permission granted or deemed to have been granted by the Secretary of State under this Part of this Act or under Part IV or V thereof; nor does it apply to an order modifying any conditions to which a planning permission is subject by virtue of section 38 or 39 of this Act.

Propose a change

44 Constitution of Planning Inquiry Commission.

(1) The Secretary of State may constitute a Planning Inquiry Commission to inquire into and report on any matter referred to them under section 45 of this Act. (2) Any such commission shall consist of a chairman and not less than two nor more than four other members appointed by the Secretary of State. (3) The Secretary of State may pay to the members of any such commission such remuneration and allowances as he may with the consent of the Treasury determine, and may provide for each such commission such officers or servants, and such accommodation, as appears to him expedient to provide for the purpose of assisting the commission in the discharge of their functions. (4) The validity of any proceedings of any such commission shall not be affected by any vacancy among the members of the commission or by any defect in the appointment of any member. (5) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Propose a change

45 References to a Planning Inquiry Commission.

(1) The following matters may, in the circumstances mentioned in subsection (2) of this section, be referred to a Planning Inquiry Commission, that is to say— (a) an application for planning permission which the Secretary of State has under section 32 of this Act directed to be referred to him instead of being dealt with by a. . . planning authority; (b) an appeal under section 33 of this Act (including that section as applied by or under any other provision of this Act); (c) a proposal that a government department should give a direction under section 37 of this Act that planning permission shall be deemed to be granted for development by a local authority or by statutory undertakers which is required by any enactment to be authorised by that department; (d) a proposal that development should be carried out by or on behalf of a government department. (2) Any of the matters mentioned in subsection (1) of this section may be referred to any such commission under this section if it appears expedient to the responsible Minister or Ministers that the question whether the proposed development should be permitted to be carried out should be the subject of a special inquiry on either or both of the following grounds— (a) there are considerations of national or regional importance which are relevant to the determination of that question and require evaluation, but a proper evaluation thereof cannot be made unless there is a special inquiry for the purpose; (b) the technical or scientific aspects of the proposed development are of so unfamiliar a character as to jeopardise a proper determination of that question unless there is a special inquiry for the purpose. (3) Two or more of the matters mentioned in subsection (1) of this section may be referred to the same commission under this section if it appears to the responsible Minister or Ministers that they relate to proposals to carry out development for similar purposes on different sites. (4) Where a matter referred to a commission under this section relates to a proposal to carry out development for any purpose at a particular site, the responsible Minister or Ministers may also refer to the commission the question whether development for that purpose should instead be carried out at an alternative site. (5) The responsible Minister or Ministers shall, on referring a matter to a commission under this section, state in the reference the reasons therefor and may draw the attention of the commission to any points which seem to him or them to be relevant to their inquiry. (6) a commission inquiring into a matter referred to them under this section shall— (a) identify and investigate the considerations relevant to, or the technical or scientific aspects of, that matter which in their opinion are relevant to the question whether the proposed development should be permitted to be carried out and assess the importance to be attached to those considerations or aspects; (b) thereafter, if the applicant, in the case of a matter mentioned in subsection (1)(a), (b) or (c) of this section, or the. . . planning authority in any case so desire, afford to each of them, and, in the case of an application or appeal mentioned in the said subsection (1)(a) or (b), to any person who has made representations relating to the subject matter of the application or appeal which the authority are required to take into account under section 26(2) or (3) of this Act, an opportunity of appearing before and being heard by one or more members of the commission; (c) report to the responsible Minister or Ministers on the matter referred to them. (7) Any such commission may, with the approval of the Secretary of State and at his expense, arrange for the carrying out (whether by the commission themselves or by others) of research of any kind appearing to them to be relevant to a matter referred to them for inquiry and report. (8) Schedule 8 to this Act shall have effect for the construction of references in this section and in section 46 of this Act to “the responsible Minister or Ministers”.

Propose a change

46 Procedure on reference to a Planning Inquiry Commission.

(1) A reference to a Planning Inquiry Commission of a proposal that development should be carried out by or on behalf of a government department may be made at any time and a reference of any other matter mentioned in section 45 of this Act may be made at any time before, but not after, the determination of the relevant application referred under section 32 of this Act or the relevant appeal under section 33 of this Act or, as the case may be, the giving of the relevant direction under section 37 of this Act, notwithstanding that an inquiry or other hearing has been held into the proposal by a person appointed by any Minister for the purpose. (2) Notice of the making of a reference to any such commission shall be published in the prescribed manner, and a copy of the notice shall be served on the. . . planning authority for the area in which it is proposed that the relevant development shall be carried out, and— (a) in the case of an application for planning permission referred under section 32 of this Act or an appeal under section 33 of this Act, on the applicant and any person who has made representations relating to the subject matter of the application or appeal which the authority are required to take into account under section 26(2) or (3) of this Act; (b) in the case of a proposal that a direction should be given under section 37 of this Act with respect to any development, on the local authority or statutory undertakers applying for sanction to carry out that development. (3) A Planning Inquiry Commission shall, for the purpose of complying with section 45(6)(b) of this Act, hold a local inquiry; and they may hold such an inquiry, if they think it necessary for the proper discharge of their functions, notwithstanding that neither the applicant nor the. . . planning authority desire an opportunity of appearing and being heard. (4) Where a Planning Inquiry Commission are to hold a local inquiry under subsection (3) of this section in connection with a matter referred to them, and it appears to the responsible Minister or Ministers, in the case of some other matter falling to be determined by a Minister of the Crown and required or authorised by an enactment other than this section to be the subject of a local inquiry, that the two matters are so far cognate that they should be considered together, he or, as the case may be, they may direct that the two inquiries be held concurrently or combined as one inquiry. (5) An inquiry held by such a commission under this section shall be treated for the purposes of the Tribunals and Inquiries Act 1992 as one held by a Minister in pursuance of a duty imposed by a statutory provision. (6) Subsections (4) to (9) of section 267 of this Act (power to summon and examine witnesses, and expenses at inquiries) shall apply to an inquiry held under subsection (3) of this section as they apply to an inquiry held under that section. (7) Subject to the provisions of this section and to any directions given to them by the responsible Minister or Ministers, a Planning Inquiry Commission shall have power to regulate their own procedure.

Propose a change

47 Commissions to inquire into planning matters affecting Scotland and England.

(1) The Ministers may constitute a Joint Planning Inquiry Commission to inquire into and report on any matter referred to them under this section; and the matters which may be so referred are those which may, under section 45 of this Act or section 101 of the Town and Country Planning Act 1990, be referred to a Planning Inquiry Commission but which appear to the Ministers to involve considerations affecting both Scotland and England. (2) a Joint Planning Inquiry Commission shall consist of a chairman and not less than two nor more than four other members appointed by the Ministers. (3) The Ministers may pay to the members of any such commission such remuneration and allowances as they may with the consent of the Treasury determine, and may provide for each such commission such officers or servants, and such accommodation, as appears to them expedient to provide for the purpose of assisting the commission in the discharge of their functions. (4) The validity of any proceedings of any such commission shall not be affected by any vacancy among the members of the commission or by any defect in the appointment of any member. (5) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . (6) In this section “the Ministers” means the Secretaries of State for the time being having general responsibility in planning matters in relation to Scotland and in relation to England acting jointly; but their functions under subsection (3) of this section may, by arrangements made between them, be exercised by either acting on behalf of both. (7) Schedule 9 to this Act shall have effect with respect to the Joint Planning Inquiry Commissions and references to them under this section, and with respect to the proceedings of a commission on any such reference.

Propose a change

48 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Propose a change

49 Orders requiring discontinuance of use or alteration or removal of buildings or works.

(1) If it appears to a. . . planning authority that it is expedient in the interests of the proper planning of their area (including the interests of amenity), regard being had to the development plan and to any other material considerations— (a) that any use of land should be discontinued, or that any conditions should be imposed on the continuance of a use of land; or (b) that any buildings or works should be altered or removed, the. . . planning authority may by order require the dicontinuance of that use, or impose such conditions as may be specified in the order on the continuance thereof, or require such steps as may be so specified to be taken for the alteration or removal of the buildings or works, as the case may be. (1A) For the purposes of this section development consisting of the winning and working of minerals or involving the deposit of refuse or waste materials in, on or under any land is to be treated as a use of that land. (1B) Subsection (1) of this section shall have effect as if— (a) the words or (c) that any plant or machinery used for the winning and working or depositingshould be altered or removed, were added at the end of paragraph (b); and (b) the words “or plant or machinery” were inserted after the words “buildings or works”, in the second place where those words occur. (1C) Where development consisting of the winning and working of minerals or involving the deposit of refuse or waste materials is being carried out in, on or under any land, the conditions which an order under this section may impose include a restoration condition. (1D) An order under this section may include any such aftercare condition as the planning authority think fit if— (a) it also includes a restoration condition; or (b) a restoration condition has previously been imposed in relation to the land by virtue of any provision of this Act. (1E) An order under this section may grant planning permission for any development of the land to which the order relates, subject to such conditions as may be— (a) required by section 41A of this Act; or (b) specified in the order. (1F) In a case where— (a) the use specified is a use for agriculture; and (b) the land was in use for agriculture immediately before the development began or had previously been used for agriculture and had not been used for any authorised purpose since its use for agriculture ceased; and (c) the planning authority is aware of or can readily ascertain the physical characteristics of the land when it was last used for agriculture, the land is brought to the required standard when its physical characteristics are restored, so far as it is practicable to do so, to what they were when it was last used for agriculture. (1G) In any other case where the use specified is a use for agriculture the land is brought to the required standard when it is reasonably fit for that use. (2) An order under this section may grant planning permission for any development of the land to which the order relates, subject to such conditions as may be specified in the order; and the provisions of section 42 of this Act shall apply in relation to any planning permission granted by an order under this section as they apply in relation to planning permission granted by the. . . planning authority on an application made under this Part of this Act. (3) The planning permission which may be granted by an order under this section includes planning permission, subject to such conditions as may be specified in the order, for development carried out before the date on which the order was submitted to the Secretary of State under this section. (3A) Planning permission for such development may be granted so as to have effect from— (a) the date on which the development was carried out; or (b) if it was carried out in accordance with planning permission granted for a limited period, the end of that period. (4) An order under this section shall not take effect unless it is confirmed by the Secretary of State, either without modification or subject to such modifications as he considers expedient. (5) Where a. . . planning authority submit an order to the Secretary of State for his confirmation under this section, that authority shall serve notice on the owner, on the lessee and on the occupier of the land affected, and on any other person who in their opinion will be affected by the order; and if within the period specified in that behalf in the notice (not being less than twenty-eight days from the service thereof) any person on whom the notice is served so requires, the Secretary of State, before confirming the order, shall afford to that person and to the. . . planning authority an opportunity of appearing before, and being heard by, a person appointed by the Secretary of State for the purpose. (6) Where an order under this section has been confirmed by the Secretary of State, the. . . planning authority shall serve a copy of the order on the owner, on the lessee and on the occupier of the land to which the order relates. (7) Subject to subsection (7A) of this section,where the requirements of an order under this section will involve the displacement of persons residing in any premises, it shall be the duty of the. . . planning authority, in so far as there is no other residential accommodation suitable to the reasonable requirements of those persons available on reasonable terms, to secure the provision of such accommodation in advance of the displacement. (7A) Subsection (7) of this section does not apply where the order under this section relates to the discontinuance of a use of land consisting of the winning and working of minerals or involving the deposit of refuse or waste materials. (8) In the case of planning permission granted by an order under this section, the authority referred to in sections 38(1)(b) and 39(4) of this Act is the. . . planning authority making the order.

Propose a change

49A Prohibition of resumption of winning and working of minerals.

(1) Where it appears to the planning authority— (a) that development of land— (i) consisting of the winning and working of minerals; or (ii) involving the depositing of mineral waste, has occurred; but (b) the winning and working or depositing has permanently ceased, the planning authority may by order— (i) prohibit the resumption of the winning and working or the depositing; and (ii) impose, in relation to the site, any such requirement as is specified in subsection (3) of this section. (2) The planning authority may assume that the winning and working or the depositing has permanently ceased only when— (a) no winning and working or depositing has occurred, to any substantial extent, at the site for a period of at least two years; and (b) it appears to the planning authority, on the evidence available to them at the time when they make the order, that resumption of the winning and working or the depositing to any substantial extent at the site is unlikely. (3) The requirements mentioned in subsection (1) of this section are— (a) a requirement to alter or remove plant or machinery which was used for the purpose of the winning and working or the depositing or for any purpose ancillary to that purpose; (b) a requirement to take such steps as may be specified in the order, within such period as may be so specified, for the purpose of removing or alleviating any injury to amenity which has been caused by the winning and working or depositing, other than injury due to subsidence caused by underground mining operations; (c) a requirement that any condition subject to which planning permission for the development was granted or which has been imposed by virtue of any provision of this Act shall be complied with; and (d) a restoration condition. (4) An order under this section may include any such aftercare condition as the planning authority think fit if— (a) it also includes a restoration condition; or (b) a restoration condition has previously been imposed in relation to the site by virtue of any provision of this Act. (5) Subsections (3) to (8) and (11) to (19) of section 27A of this Act shall apply in relation to an after-care condition imposed under this section as they apply in relation to such a condition imposed under that section. (6) In a case where— (a) the use specified is a use for agriculture; and (b) the land was in use for agriculture immediately before development consisting of the winning and working of minerals began to be carried out in, on or under it or had previously been used for agriculture and had not been used for any authorised purpose since its use for agriculture ceased; and (c) the planning authority is aware of or can readily ascertain the physical characteristics of the land when it was last used for agriculture, the land is brought to the required standard when its physical characteristics are restored, so far as it is practicable to do so, to what they were when it was last used for agriculture. (7) In any other case where the use specified is a use for agriculture the land is brought to the required standard when it is reasonably fit for that use. (8) An order under this section shall not take effect unless it is confirmed by the Secretary of State, either without modification or subject to such modifications as he considers expedient. (9) Where a planning authority submit an order under this section to the Secretary of State for his confirmation under this section, that authority shall serve notice of the order on any person who is an owner or occupier of any of the land to which the order relates, and on any other person who in their opinion will be affected by the order; and if within the period specified in that behalf in the notice (not being less than twenty-eight days from the service thereof) any person on whom the notice is served so requires, the Secretary of State, before confirming the order, shall afford to that person and to the planning authority an opportunity of appearing before, and being heard by, a person appointed by the Secretary of State for that purpose. (10) Where an order under this section has been confirmed by the Secretary of State, the planning authority shall serve a copy of the order on every person who was entitled to be served with notice under subsection (9) of this section. (11) On an order under this section taking effect any planning permission for the development to which the order relates shall cease to have effect but without prejudice to the power of the planning authority, on revoking the order, to make a further grant of planning permission for development consisting of the winning and working of minerals or involving the depositing of mineral waste.

Propose a change

49B Orders after suspension of winning and working of minerals.

(1) Where it appears to the planning authority— (a) that development of land— (i) consisting of the winning and working of minerals; or (ii) involving the depositing of mineral waste, has occurred; but (b) the winning and working or depositing has been temporarily suspended, the planning authority may by order (in this Act referred to as a “suspension order”) require that steps be taken for the protection of the environment. (2) The planning authority may assume that the winning and working or the depositing has been temporarily suspended only when— (a) no such winning and working or depositing has occurred, to any substantial extent, at the site for a period of at least 12 months; but (b) it appears to the planning authority, on the evidence available to them at the time when they make the order, that a resumption of such winning and working or depositing to a substantial extent is likely. (3) In this Act “steps for the protection of the environment” means steps for the purpose— (a) of preserving the amenities of the area in which the land in, on or under which the development was carried out is situated during the period while the winning and working or the depositing is suspended; (b) of protecting that area from damage during that period; or (c) of preventing any deterioration in the condition of the land during that period. (4) A suspension order shall specify a period, commencing with the date on which it is to take effect, within which any step required for the protection of the environment is to be taken, and may specify different periods for the taking of different steps. (5) At any time when a suspension order is in operation the planning authority may by order (in this Act referred to as a “supplementary suspension order”) direct— (a) that steps for the protection of the environment shall be taken in addition to or in substitution for any of the steps which the suspension order or a previous supplementary suspension order specified as required to be taken; or (b) that the suspension order or any supplementary suspension order shall cease to have effect.

Propose a change

49C Confirmation and coming into operation of suspension orders.

(1) Without prejudice to section 49D of this Act, a suspension order or supplementary suspension order (other than a supplementary suspension order revoking a suspension order or a previous supplementary suspension order and not requiring that any fresh step shall be taken for the protection of the environment) shall not take effect until it is confirmed by the Secretary of State, either without modification or subject to such modifications as he considers expedient (2) Subsection (9) of section 49A of this Act shall have effect in relation to a suspension order or supplementary suspension order submitted to the Secretary of State for his confirmation as it has effect in relation to an order submitted to him for his confirmation under that section. (3) Where a suspension order or supplementary suspension order has been confirmed by the Secretary of State, the planning authority shall serve a copy of the order on every person who was entitled to be served with notice by virtue of subsection (2) of this section.

Propose a change

49D Registration of suspension orders.

No order under section 49A or 49B of this Act shall take effect until it is registered either— (a) in a case where the land affected by the order is registered in that Register, in the Land Register of Scotland, or (b) in any other case, in the appropriate division of the General Register of Sasines.

Propose a change

49E Reviews of suspension orders.

(1) It shall be the duty of a planning authority— (a) to undertake in accordance with the following provisions of this section reviews of suspension orders and supplementary suspension orders which are in operation in their area; and (b) to determine whether they should make, in relation to any land to which a suspension order or supplementary suspension order applies— (i) an order under section 49A of this Act; or (ii) a supplementary suspension order. (2) The first review of a suspension order shall be undertaken not more than five years from the date on which the order takes effect. (3) Each subsequent review shall be undertaken not more than five years after the previous review. (4) If a supplementary suspension order is in operation for any part of the area for which a suspension order is in operation, they shall be reviewed together. (5) If a planning authority have made a supplementary suspension order which requires the taking of steps for the protection of the environment in substitution for all the steps required to be taken by a previous order under section 49B of this Act, the authority shall undertake reviews of the supplementary suspension order in accordance with subsections (6) and (7) of this section. (6) The first review shall be undertaken not more than five years from the date on which the order takes effect. (7) Each subsequent review shall be undertaken not more than five years after the previous review. (8) The duty to undertake reviews imposed by this section is in addition to and not in substitution for the duties imposed by section 251A of this Act.

Propose a change

49F Resumption of winning and working of minerals after suspension order.

(1) Nothing in a suspension order or a supplementary suspension order shall prevent the recommencement of development consisting of the winning and working of minerals or involving the depositing of mineral waste at the site in relation to which the order is in effect; but no person shall recommence such development without first giving the planning authority notice of his intention to do so. (2) A notice under subsection (1) of this section shall specify the date on which the person giving the notice intends to recommence the development. (3) The planning authority shall revoke the order if the winning and working of minerals or the depositing of mineral waste has recommenced to a substantial extent at the site in relation to which the order has effect. (4) If the authority do not revoke the order before the end of the period of two months from the date specified in the notice under subsection (1) of this section, the person who gave that notice may apply to the Secretary of State for the revocation of the order. (5) Notice of an application under subsection (4) of this section shall be given by the applicant to the planning authority. (6) If he is required to do so by the person who gave the notice or by the planning authority, the Secretary of State, before deciding whether or not to revoke the order, shall afford to that person and to the planning authority an opportunity of appearing before, and being heard by, a person appointed by the Secretary of State for the purpose. (7) If the Secretary of State is satisfied that the winning and working of minerals or the depositing of mineral waste has recommenced to a substantial extent at the site in relation to which the order has effect, he shall revoke the order. (8) If the Secretary of State revokes an order by virtue of subsection (7) of this section, he shall give notice of its revocation to the person who applied to him for the revocation and to the planning authority.

Propose a change

49G . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Propose a change

49H Old mining permissions.

(1) In this section and Schedule 10A to this Act, “old mining permission” means any planning permission for development— (a) consisting of the winning and working of minerals, or (b) involving the depositing of mineral waste, which is deemed to have been granted by virtue of paragraph 77 of Schedule 22 to this Act (development authorised under interim development orders after 10th November 1943). (2) An old mining permission shall, if an application under that Schedule to determine the conditions to which the permission is to be subject is finally determined, have effect as from the final determination as if granted on the terms required to be registered. (3) If no such development has, at any time in the period of two years ending with 16th May 1991, been carried out to any substantial extent anywhere in, on or under the land to which an old mining permission relates, that permission shall not authorise any such development to be carried out after the coming into force of this section unless— (a) the permission has effect in accordance with subsection (2) above; and (b) the development is carried out after such an application is finally determined. (4) An old mining permission shall— (a) if no application for the registration of the permission is made under that Schedule, cease to have effect on the day following the last date on which such an application may be made, and (b) if such an application is refused, cease to have effect on the day following the date on which the application is finally determined. (5) An old mining permission shall, if— (a) such an application is granted; but (b) an application under that Schedule to determine the conditions to which the permission is to be subject is required to be served before the end of any period and is not so served, cease to have effect on the day following the last date on which the application to determine those conditions may be served. (6) Subject to subsection (3) above, this section— (a) shall not affect any development carried out under an old mining permission before an application under that Schedule to determine the conditions to which the permission is to be subject is finally determined or, as the case may be, the date on which the permission ceases to have effect; and (b) shall not affect any order made or having effect as if made under section 49 or 49A to 49F of this Act (discontinuance, etc., orders).

Propose a change

50 Agreements regulating development or use of land.

(1) A. . . planning authority may enter into an agreement with any person interested in land in their area (in so far as the interest of that person enables him to bind the land) for the purpose of restricting or regulating the development or use of the land, either permanently or during such period as may be prescribed by the agreement; and any such agreement may contain such incidental and consequential provisions (including provisions of a financial character) as appear to the. . . planning authority to be necessary or expedient for the purposes of the agreement. (2) An agreement made under this section with any person interested in land, may, if the agreement shall have been recorded in the appropriate Register of Sasines or, as the case may be, registered in the Land Register of Scotland,, be enforceable at the instance of the. . . planning authority against persons deriving title to the land from the person with whom the agreement was entered into: Provided that no such agreement shall at any time be enforceable against a third party who shall have in bona fide onerously acquired right (whether completed by infeftment or not) to the land prior to the agreement being recorded as aforesaid or against any person deriving title from such third party. (3) Nothing in this section or in any agreement made thereunder shall be construed— (a) as restricting the exercise, in relation to land which is the subject of any such agreement, of any powers exercisable by any Minister or authority under this Act so long as those powers are exercised in accordance with the provisions of the development plan, or in accordance with any directions which may have been given by the Secretary of State as to the provisions to be included in such a plan; or (b) as requiring the exercise of any such powers otherwise than as mentioned in paragraph (a) of this subsection. (4) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Propose a change

51 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Propose a change

52 Lists of buildings of special architectural or historic interest.

(1) For the purposes of this Act and with a view to the guidance of. . . planning authorities in the performance of their functions under this Act in relation to buildings of special architectural or historic interest, the Secretary of State shall compile lists of such buildings, or approve, with or without modifications, such lists compiled by other persons or bodies of persons, and may amend any list so compiled or approved. (2) In considering whether to include a building in a list compiled or approved under this section, the Secretary of State may take into account not only the building itself but also— (a) any respect in which its exterior contributes to the architectural or historic interest of any group of buildings of which it forms part; and (b) the desirability of preserving, on the ground of its architectural or historic interest, any feature of the building consisting of a man-made object or structure fixed to the building or forming part of the land and comprised within the curtilage of the building. (3) Before compiling or approving, with or without modifications, any list under this section, or amending any list thereunder the Secretary of State shall consult with such persons or bodies of persons as appear to him appropriate as having special knowledge of, or interest in, buildings of architectural or historic interest. (4) As soon as may be after any list has been compiled or approved under this section, or any amendments of such a list have been made, a copy of so much of the list as relates to the district of any . . . planning authority within the meaning of Part IX of the Local Government (Scotland) Act 1973 or the local authority for the purposes of the Housing (Scotland) Acts 1966 to 1969, or of so much of the amendments as relates thereto, as the case may be, certified by or on behalf of the Secretary of State to be a true copy thereof, shall be deposited with the clerk of that authority. (5) As soon as may be after the inclusion of any building in a list under this section, whether on the compilation or approval of the list or by the amendment thereof, or as soon as may be after any such list has been amended by the exclusion of any building therefrom, the. . . planning authority concerned in whose district the building is situated, on being informed of the fact by the Secretary of State, shall serve a notice in the prescribed form on every owner, lessee and occupier of the building, stating that the building has been included in, or excluded from, the list, as the case may be. (6) The Secretary of State shall keep available for public inspection, free of charge at reasonable hours and at a convenient place, copies of all lists and amendments of lists compiled, approved or made by him under this section; and every authority with whose clerk copies of any list or amendments are deposited under this section shall similarly keep available copies of so much of any such list or amendment as relates to buildings within their area. (7) In this Act “listed building” means a building which is for the time being included in a list compiled or approved by the Secretary of State under this section; and, for the purposes of the provisions of this Act relating to listed buildings and building preservation notices, the following shall be treated as part of the building— (a) any object or structure fixed to the building; (b) any object or structure within the curtilage of the building which, although not fixed to the building, forms part of the land and has done so much before 1st July 1948. (8) Every building which immediately before 3rd August 1970 was subject to a building preservation order under section 27 of the Act of 1947 but was not then included in a list compiled or approved under section 28 of that Act, shall be deemed to be a listed building; but the Secretary of State may at any time direct, in the case of any building, that this subsection shall no longer apply to it and the. . . planning authority in whose district the building is situated, on being notified of the Secretary of State’s direction, shall give notice of it to the owner, lessee and occupier of the building. (9) Before giving a direction under subsection (8) of this section in relation to a building, the Secretary of State shall consult with the. . . planning authority and with the owner, lessee and occupier of the building.

Propose a change

53 Control of works for demolition, alteration or extension of listed buildings

(1) Subject to this Part of this Act, if a person executes or causes to be executed any works for the demolition of a listed building or for its alteration or extension in any manner which would affect its character as a building of special architectural or historic interest, and the works are not authorised under subsection (2) of this section, he shall be guilty of an offence. (2) Works for the demolition of a listed building, or for its alteration or extension, are authorised under this Part of this Act . . . if— (a) the. . . planning authority or the Secretary of State have granted written consent . . . for the execution of the works and the works are executed in accordance with the terms of the consent and of any conditions attached to the consent under section 54 of this Act; and (b) in the case of demolition, notice of the proposal to execute the works has been given to the Royal Commission and thereafter either— (i) for a period of at least three months following the grant of listed building consent, and before the commencement of the works, reasonable access to the building has been made available to members or officers of the Commission for the purpose of recording it; or (ii) the Commission have, by their Secretary or other officer of theirs with authority to act on the Commission’s behalf for the purposes of this section, stated in writing that they have completed their recording of the building or that they do not wish to record it. (2A) If written consent is granted by the planning authority or the Secretary of State for the retention of works for the demolition, alteration or extension of a listed building which have been executed without consent under subsection (2) of this section, the works are authorised under this Part of this Act from the grant of the consent under this subsection. (3) In subsection (2) of this section “the Royal Commission” means the Royal Commission on the Ancient and Historical Monuments of Scotland; but the Secretary of State may, by order provide that the said subsection shall, in the case of works executed or to be executed on or after such date as may be specified in the order, have effect with the substitution for the reference to the Royal Commission of a reference to such other body as may be so specified. (3A) Consent under subsection (2) or (2A) of this section is referred to in this Part of this Act as “building consent”. (4) Without prejudice to subsection (1) of this section, if a person executing or causing to be executed any works in relation to a listed building under a listed building consent fails to comply with any condition attached to the consent . . ., he shall be guilty of an offence. (5) A person who is guilty of an offence under this section shall be liable— (a) on summary conviction, to imprisonment for a term not exceeding six months or a fine not exceeding £20,0, or both; or (b) on conviction on indictment, to imprisonment for a term not exceeding two years or a fine, or both; and in determining the amount of any fine to be imposed on a person convicted of an offence under this section, the court shall in particular have regard to any financial benefit which has accrued or appears likely to accrue to him in consequence of the offence. (6) In proceedings for an offence under this section it shall be a defence to prove the following matters— (a) that works to the building were urgently necessary in the interests of safety or health or for the preservation of the building; (b) that it was not practicable to secure safety or health or, as the case may be, the preservation of the building by works of repair or works for affording temporary support or shelter; (c) that the works carried out were limited to the minimum measures immediately necessary, and (d) that notice in writing justifying in detail the carrying out of the works was given to the planning authority as soon as reasonably practicable.

Propose a change

54 Provisions supplementary to s. 53.

(1) Section 53 of this Act shall not apply to works for the demolition, alteration or extension of— (a) an ecclesiastical building which is for the time being used for ecclesiastical purposes or would be so used but for the works; or (b) a building for the time being included in the Schedule of monuments compiled and maintained under section 1 of the Ancient Monuments and Archaeological Areas Act 1979. For the purposes of this subsection, a building used or available for use by a minister of religion wholly or mainly as a residence from which to perform the duties of his office shall be treated as not being an ecclesiastical building. (2) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . (3) In considering whether to grant planning Permission for development which affects a listed building or its setting, and in considering whether to grant listed building consent for any works, the. . . planning authority or the Secretary of State, as the case may be, shall have special regard to the desirability of preserving the building or its setting or any features of special architectural or historic interest which it possesses. (4) Listed building consent may be granted subject to conditions; and, without prejudice to the generality of the foregoing provisions of this subsection, the conditions may include conditions with respect to— (a) the preservation of particular features of the building, either as part of it or after severance therefrom; (b) the making good, after the works are completed, of any damage caused to the building by the works; (c) the reconstruction of the building or any part of it following the execution of any works, with the use of original materials so far as practicable and with such alterations of the interior of the building as may be specified in the conditions. (4A) Listed building consent may be granted subject to a condition reserving specified details of the works (whether or not set out in the application) for subsequent approval by the planning authority or, in the case of consent granted by the Secretary of State, specifying whether the reserved details are to be approved by the planning authority or by him. (5) In granting a listed building consent a planning authority may attach to the consent a condition that no demolition of the listed building shall take place until either or both of the following requirements have been met— (a) an agreement for the regulation of the development of the site of the listed building has been made and recorded under section 50 of this Act; (b) the planning authority are satisfied that contracts have been placed either— (i) for the redevelopment of the site; or (ii) for its conversion to an acceptable open space, in accordance with a current planning permission. (6) Part I of Schedule 10 to this Act shall have effect with respect to applications to. . . planning authorities for listed building consent, the reference of such applications to the Secretary of State and appeals against decisions on such applications; and Part II of that Schedule shall have effect with respect to the revocation of listed building consent by a. . . planning authority or the Secretary of State.

Propose a change

54A Limit on duration of listed building consent.

(1) Any listed building consent granted after the commencement of this section shall be granted subject to a condition that works permitted by that consent shall be commenced within such period as the planning authority may specify in the consent. (2) If no time limit is specified in any grant of listed building consent under subsection (1) above, the grant shall be deemed to have been made subject to a condition that works in terms thereof shall be commenced with 5 years from the date of the grant. (3) Any grant of listed building consent made prior to 1st January 1980 which does not contain such a condition as is mentioned in subsection (1) above shall be deemed to have been granted subject to a condition that works in terms thereof shall be commenced within 3 years of the commencement of this section. (4) Any grant of listed building consent made on or after 1st January 1980 but before the commencement of this section which does not contain such a condition as is mentioned in subsection (1) above shall be deemed to have been made subject to a condition that works in terms thereof shall be commenced within 5 years of the commencement of this section.] (5) Nothing in this section applies to any consent to the retention of works granted under section 53(2A) of this Act.

Propose a change

54B [Date of listed building consent.

The date of the granting or of the refusal of an application for listed building consent shall be the date on which the notice of the planning authority’s decision bears to have been signed on behalf of the authority.

Propose a change

54C Intimation of notices etc. affecting listed buildings.

(1) Subject to subsection (2) below, where a local authority— (a) have, under or by virtue of any enactment, served a notice requiring any person to show cause why a listed building should not conform to the building regulations; or (b) have, under or by virtue of any enactment, served a notice or made an order requiring— (i) the demolition of such a building; or (ii) the carrying out of works affecting such a building; or (c) propose (whether under or by virtue of any enactment or otherwise) to carry out emergency works or demolitions affecting such a building, they shall forthwith give written intimation of the notice, order, or proposal, as the case may be, to the planning authority: Provided that where the building is owned, leased or occupied by the planning authority, the local authority (whether or not they are the planning authority) shall also give such intimation to the Secretary of State. (2) Where the safety of the public requires that any demolition or works be carried out without such delay as would result from compliance with the provisions of subsection (1) above, the intimation (which may, in such a case, initially be oral) shall be given as long before the commencement of the demolition or works as is consistent with that requirement.

Propose a change

54D Application for variation or discharge of conditions.

(1) Any person interested in a listed building with respect to which listed building consent has been granted subject to conditions may apply to the planning authority for the variation or discharge of the conditions. (2) The application shall indicate what variation or discharge of conditions is applied for and the provisions of Part I of Schedule 10 to this Act apply to such an application as they apply to an application for listed building consent. (3) On such an application the planning authority or, as the case may be, the Secretary of State may vary or discharge the conditions attached to the consent, and may add new conditions consequential upon the variation or discharge, as they or he think fit.

Propose a change

← Find another law