Law

Title 41 Water

Wyoming · 41 · statute

Ask the law about thisMore laws of WyomingFor machines: Markdown

Open at the publisher →

The publisher does not state since when this version applies. Read on 2026-11-07.

Copy read on 2026-11-07. The page it was read from

sha256 7d23e54d8a94227974f95660d8ba954130941b6355df27c211abe2ed5fea8215

Contents: 814 provisions
  1. 41-1-101. Permit for construction of Glendo Reservoir and
  2. 41-1-102. Repealed By Laws 2005, ch. 8, § 1.
  3. 41-1-103. Repealed By Laws 2005, ch. 8, § 1.
  4. 41-1-104. Repealed By Laws 2005, ch. 8, § 1.
  5. 41-1-105. Use of underground water in adjoining state; adjudication by board of control.
  6. 41-1-106. Water and related land resources planning; commission's responsibility.
  7. 41-1-107. Water and related land resources planning; authority of commission.
  8. 41-1-108. Water and related land resources planning; dispositions of monies and commission offices.
  9. 41-1-109. Interference with natural flow of thermal springs; authority to correct.
  10. 41-1-110. Interference with natural flow of thermal springs; nonthermal water or mineral development.
  11. 41-1-111. Interference with natural flow of thermal springs; injunctive relief.
  12. 41-1-112. Conducting business electronically.
  13. 41-2-101. Repealed By Laws 1999, ch. 149, § 1.
  14. 41-2-102. Repealed By Laws 1999, ch. 149, § 1.
  15. 41-2-103. Repealed By Laws 1999, ch. 149, § 1.
  16. 41-2-104. Repealed By Laws 1999, ch. 149, § 1.
  17. 41-2-105. Repealed By Laws 1999, ch. 149, § 1.
  18. 41-2-106. Repealed By Laws 1999, ch. 149, § 1.
  19. 41-2-107. Water resources plans; review; submission to commission.
  20. 41-2-108. Water resources plans; powers of commission.
  21. 41-2-109. Water resources plans; contents.
  22. 41-2-110. Water resources plans; duties of commission.
  23. 41-2-111. Suits for enforcement of water rights; appeals
  24. 41-2-112. Wyoming water development program.
  25. 41-2-113. Definitions.
  26. 41-2-114. Development of water projects; rehabilitation of water projects.
  27. 41-2-115. Report; authorization; assignment.
  28. 41-2-116. Water rights.
  29. 41-2-117. Wyoming water development commission; membership; removal; terms.
  30. 41-2-118. Powers, duties, salaries and expenses of commission.
  31. 41-2-119. Groundwater studies.
  32. 41-2-120. Approval of loans, construction or water contracts and agreements.
  33. 41-2-121. Criteria for water development projects; disclosure of personal interests by commission.
  34. 41-2-122. Protection and rights of landowner.
  35. 41-2-123. Project studies generally; hearings;
  36. 41-2-124. Accounts created; unexpended balance.
  37. 41-2-125. Office of water programs created; duties; annual report.
  38. 41-2-201. Renumbered as 99-99-201 by Laws 2009, Ch. 168, § 401.
  39. 41-2-202. Renumbered as 99-99-202 by Laws 2009, Ch. 168, § 401.
  40. 41-2-203. Renumbered as 99-99-203 by Laws 2009, Ch. 168, § 401.
  41. 41-2-204. Renumbered as 99-99-204 by Laws 2009, Ch. 168, § 401.
  42. 41-2-205. Renumbered as 99-99-205 by Laws 2009, Ch. 168, § 401.
  43. 41-2-206. Renumbered as 99-99-206 by Laws 2009, Ch. 168, § 401.
  44. 41-2-207. Repealed by Laws 1986, ch. 113, § 14; Renumbered as 99-99-207 by Laws 2009, Ch. 168, § 401.
  45. 41-2-208. Renumbered as 99-99-208 by Laws 2009, Ch. 168, § 401.
  46. 41-2-209. Renumbered as 99-99-209 by Laws 2009, Ch. 168, § 401.
  47. 41-2-210. Renumbered as 99-99-210 by Laws 2009, Ch. 168, § 401.
  48. 41-2-211. Renumbered as 99-99-211 by Laws 2009, Ch. 168, § 401.
  49. 41-2-212. Repealed by Laws 1982, ch. 60, § 16; Renumbered as 99-99-212 by Laws 2009, Ch. 168, § 401.
  50. 41-2-213. Repealed by Laws 1982, ch. 60, § 16; Renumbered as 99-99-213 by Laws 2009, Ch. 168, § 401.
  51. 41-2-214. Repealed by Laws 1982, ch. 60, § 16; Renumbered as 99-99-214 by Laws 2009, Ch. 168, § 401.
  52. 41-2-215. Repealed by Laws 1982, ch. 60, § 16; Renumbered as 99-99-215 by Laws 2009, Ch. 168, § 401.
  53. 41-2-216. Renumbered as 99-99-216 by Laws 2009, Ch. 168, § 401.
  54. 41-2-217. Renumbered as 99-99-217 by Laws 2009, Ch. 168, § 401.
  55. 41-2-218. Renumbered as 99-99-218 by Laws 2009, Ch. 168, § 401.
  56. 41-2-219. Renumbered as 99-99-219 by Laws 2009, Ch. 168, § 401.
  57. 41-2-220. Renumbered as 99-99-220 by Laws 2009, Ch. 168, § 401.
  58. 41-2-221. Renumbered as 99-99-221 by Laws 2009, Ch. 168, § 401.
  59. 41-2-222. Renumbered as 99-99-222 by Laws 2009, Ch. 168, § 401.
  60. 41-2-301. Renumbered as 99-99-301 by Laws 2009, Ch. 168, § 401.
  61. 41-2-401. Renumbered as 99-99-401 by Laws 2009, Ch. 168, § 401.
  62. 41-2-501. Renumbered as 99-99-501 by Laws 2009, Ch. 168, § 401.
  63. 41-2-502. Renumbered as 99-99-502 by Laws 2009, Ch. 168, § 401.
  64. 41-2-503. Renumbered as 99-99-503 by Laws 2009, Ch. 168, § 401.
  65. 41-2-504. Renumbered as 99-99-504 by Laws 2009, Ch. 168, § 401.
  66. 41-2-505. Renumbered as 99-99-505 by Laws 2009, Ch. 168, § 401.
  67. 41-2-506. Renumbered as 99-99-506 by Laws 2009, Ch. 168, § 401.
  68. 41-2-601. Renumbered as 99-99-601 by Laws 2009, Ch. 168, § 401.
  69. 41-2-701. Renumbered as 99-99-701 by Laws 2009, Ch. 168, § 401.
  70. 41-2-901. Repealed by Laws 1988, ch. 79, § 11.
  71. 41-2-1001. Renumbered as 99-99-1001 by Laws 2009, Ch. 168, § 401.
  72. 41-2-1101. Renumbered as 99-99-1101 by Laws 2009, Ch. 168, § 401.
  73. 41-2-1201. Renumbered as 99-99-1201 by Laws 2009, Ch. 168, § 401.
  74. 41-2-1301. Transfer of water authorized; conditions.
  75. 41-3-101. Nature of water rights and beneficial use.
  76. 41-3-102. Preferred uses; defined; order of preference.
  77. 41-3-103. Preferred uses; procedure for change of use.
  78. 41-3-104. Procedure to change use or place of use.
  79. 41-3-105. Repealed by Laws 1983, ch. 167, § 2.
  80. 41-3-106. Procedure to exchange water; delivery of water
  81. 41-3-107. Submerged lands; petition for change of water rights; conditions; hearing; fees.
  82. 41-3-108. Lands taken out of agricultural production or lands taken by eminent domain; retention of priority.
  83. 41-3-109. Construction of W.S. 41-3-107.
  84. 41-3-110. Right to acquire temporary water rights; application; restrictions; fee.
  85. 41-3-111. Right to acquire temporary water rights for
  86. 41-3-112. Right to acquire temporary water rights for
  87. 41-3-113. Supplemental supply water rights.
  88. 41-3-114. Petition to change point of diversion or means of conveyance.
  89. 41-3-115. Applications for use of water outside the state.
  90. 41-3-116. Permit for watering livestock on federal land.
  91. 41-3-117. Definitions; short title.
  92. 41-3-118. Conservation project applications and approval; sunset.
  93. 41-3-119. Storage of conserved water.
  94. 41-3-201. Definition.
  95. 41-3-202. Right to acquire.
  96. 41-3-203. Transportation in interstate channels.
  97. 41-3-204. Duty to supervise delivery; expense.
  98. 41-3-205. Rights of owner; priority of claims; subject to appropriation and diversion.
  99. 41-3-206. Rights of owner; recording of claim.
  100. 41-3-207. Rights of owner; right to divert and use.
  101. 41-3-208. Diverting from owner prohibited.
  102. 41-3-209. Change of point of diversion; power to petition generally.
  103. 41-3-210. Change of point of diversion; contents of petition.
  104. 41-3-211. Change of point of diversion; endorsement and recording of petition.
  105. 41-3-212. Change of point of diversion; hearing.
  106. 41-3-213. Change of point of diversion; rights of applicant upon approval; certificate of appropriation.
  107. 41-3-214. Change of point of diversion; fees and costs.
  108. 41-3-215. Change of point of diversion; appeal from adverse decision.
  109. 41-3-301. Application for reservoir construction permit; contents; procedure.
  110. 41-3-302. Application for construction permit; conditions; secondary permit; certificate of appropriation.
  111. 41-3-303. Use of stored water.
  112. 41-3-304. Use of bed of stream.
  113. 41-3-305. Direct flow storage.
  114. 41-3-306. Instream stock use.
  115. 41-3-307. Alterations or repairs of dams or diversion systems; definitions.
  116. 41-3-308. Alterations or repairs of dams or diversion
  117. 41-3-309. Alterations or repairs of dams or diversion
  118. 41-3-310. Alterations or repairs of dams or diversion
  119. 41-3-311. Alterations or repairs of dams or diversion systems; periodic inspections.
  120. 41-3-312. Alterations or repairs of dams or diversion
  121. 41-3-313. Alterations or repairs of dams or diversion systems; outlets; maintenance; draining by breaching.
  122. 41-3-314. Alterations or repairs of dams or diversion systems; emergency repairs or breaching.
  123. 41-3-315. Alterations or repairs of dams or diversion systems; enforcement of provisions.
  124. 41-3-316. Alterations or repairs of dams or diversion
  125. 41-3-317. Alterations or repairs of dams or diversion systems; liability of owners.
  126. 41-3-318. Penalties, cancellation of permit, for failure to comply with W.S. 41-3-308 through 41-3-314.
  127. 41-3-319. Owners of ditches and reservoirs; general rights.
  128. 41-3-320. Owners of ditches and reservoirs; sale or lease of impounded water.
  129. 41-3-321. Owners of ditches and reservoirs; priority of right to store or impound.
  130. 41-3-322. Owner's report of persons entitled to use water; superintendent's report of use of water.
  131. 41-3-323. Deeds for water rights; attaching of rights to land; sale, lease, transfer or use.
  132. 41-3-324. Deeds and leases for water rights; execution and recording.
  133. 41-3-325. Excess stored water to be furnished applicants; preferences; rates.
  134. 41-3-326. Applicability of ownership provisions.
  135. 41-3-327. Carey Act lands.
  136. 41-3-328. Witnesses' fees and mileage.
  137. 41-3-329. Change in point of diversion.
  138. 41-3-401. Failure to use water; extension of time; initiation by benefitted or injured user; hearing; appeal.
  139. 41-3-402. Initiation by state engineer; hearing; appeal.
  140. 41-3-501. Water divisions defined.
  141. 41-3-502. Superintendents; appointment; removal; number; qualifications; examination.
  142. 41-3-503. Superintendents; duties generally.
  143. 41-3-504. Superintendents; powers generally.
  144. 41-3-505. Superintendents; compensation and traveling expenses; full time devoted to duties.
  145. 41-3-506. Superintendents; appeal from order or regulations.
  146. 41-3-601. Division of state into districts.
  147. 41-3-602. Commissioners; appointment; term; removal; filling of vacancies; hydrographers.
  148. 41-3-603. Commissioners; general powers and duties; appeals from decisions.
  149. 41-3-604. Commissioners; additional powers and duties; defense by county attorney.
  150. 41-3-605. Commissioners; power to arrest; procedure following arrests.
  151. 41-3-606. Commissioners; performance of duties; requests for regulation.
  152. 41-3-607. Commissioners; salaries and expenses.
  153. 41-3-608. Commissioners; reports.
  154. 41-3-609. Commissioners; disqualification for personal interest or prejudice.
  155. 41-3-610. Commissioners; authority and duties of substitute.
  156. 41-3-611. Commissioners; assistants.
  157. 41-3-612. Rotation among water users; approval of commissioner.
  158. 41-3-613. Headgates, flumes or measuring devices; owners to construct and maintain; failure to comply.
  159. 41-3-614. Well, headgate or waterbox; prohibited acts; penalty for violation.
  160. 41-3-615. Approval of diversion dam plans.
  161. 41-3-616. Penalties for violation of water laws.
  162. 41-3-701. Purpose.
  163. 41-3-702. Short title; definitions.
  164. 41-3-703. Effect of improper notice of judicial proceeding.
  165. 41-3-704. Hearings on validity of districts.
  166. 41-3-705. Liberal construction.
  167. 41-3-720. Power of district court.
  168. 41-3-721. Petition for creation; conditions affecting inclusion of city or city and county.
  169. 41-3-722. Bond for expenses of proceedings.
  170. 41-3-723. Hearing procedure generally.
  171. 41-3-724. Protesting creation.
  172. 41-3-725. Filing of decree and copies of findings.
  173. 41-3-726. Procedure for organizing subdistricts.
  174. 41-3-740. Appointment and qualifications; number; term; election of successors; vacancies; bond.
  175. 41-3-741. Oath; election of officers; seal; records; compensation and expenses.
  176. 41-3-742. Powers generally.
  177. 41-3-743. Duties of secretary and chief engineer; other employees.
  178. 41-3-744. Quorum.
  179. 41-3-745. Acquisition of rights-of-way.
  180. 41-3-746. Contracts for use of water; power of board to sell or lease water; securing of payments generally.
  181. 41-3-747. Contracts for use of water; means of owners meeting annual installment payments.
  182. 41-3-748. Surplus funds.
  183. 41-3-749. Use and distribution of water generally.
  184. 41-3-750. Allotment of water to landowner under disability.
  185. 41-3-751. District boundary changes.
  186. 41-3-752. Petition for exclusion of lands.
  187. 41-3-753. Bonds; authority of board to issue; purpose; terms; execution; tax exemptions.
  188. 41-3-754. Bonds; election prior to issuance generally.
  189. 41-3-755. Bonds; election prior to issuance; publication of resolution.
  190. 41-3-756. Bonds; election prior to issuance; conduct of election; canvassing of returns; declaration of results.
  191. 41-3-757. Bonds; election prior to issuance; approval.
  192. 41-3-758. Judicial examination and determination of board's powers.
  193. 41-3-770. Methods of levying and collecting; classifications generally.
  194. 41-3-771. Methods of levying and collecting; class A.
  195. 41-3-772. Methods of levying and collecting; class B.
  196. 41-3-773. Methods of levying and collecting; class C.
  197. 41-3-774. Method of levying and collecting; class D.
  198. 41-3-775. Considerations affecting annual levies and assessments; deficiencies; additional assessments.
  199. 41-3-776. Objections to assessments.
  200. 41-3-777. Duties of city and county taxing officials.
  201. 41-3-778. Exemptions.
  202. 41-3-779. Nonpayment.
  203. 41-3-801. Petition for establishment; notice of election; qualifications of voters; conduct of election.
  204. 41-3-802. Election of board of directors; number; term;
  205. 41-3-803. Special tax authorized; power of board to enter
  206. 41-3-901. Definitions.
  207. 41-3-902. Spring waters; perfection of right to use; limitation.
  208. 41-3-903. By-product water; definition.
  209. 41-3-904. By-product water; appropriation; conditions and limitation.
  210. 41-3-905. Application; generally; registration of vested
  211. 41-3-906. Application; rights subject to preferences; rights of municipal corporations.
  212. 41-3-907. Application; preferred right of appropriations for stock or domestic use.
  213. 41-3-908. Division advisory committee; appointment; removal; duties; expense allowances.
  214. 41-3-909. State engineer; powers generally.
  215. 41-3-910. State engineer; power to determine area and boundaries of districts.
  216. 41-3-911. Authority to order interfering appropriator to
  217. 41-3-912. Control areas; board member districts;
  218. 41-3-913. Control areas; election of control area advisory board; mileage and expense allowances.
  219. 41-3-914. Adjudication of waters within control area.
  220. 41-3-915. Control areas; hearing to determine adequacy of
  221. 41-3-916. Priority of rights when 1 source of supply.
  222. 41-3-917. Change of location of well without loss of
  223. 41-3-918. Appeals.
  224. 41-3-919. Prohibited acts; penalty for violation.
  225. 41-3-930. Application; who required to file; filing;
  226. 41-3-931. Application; when granted generally; denial
  227. 41-3-932. Public notice of application or petition;
  228. 41-3-933. Express conditions limiting rights of appropriator; additional conditions.
  229. 41-3-934. Time limits to complete construction; extensions; cancellation generally.
  230. 41-3-935. Adjudication procedure.
  231. 41-3-936. Priority of appropriation.
  232. 41-3-937. Cancellation or suspension of permits or certificates.
  233. 41-3-938. Penalty.
  234. 41-3-939. Groundwater study to assess corrective controls within groundwater control areas.
  235. 41-3-1001. Waters stored for instream flows a beneficial
  236. 41-3-1002. Instream flows to be by stream segment; waters
  237. 41-3-1003. Game and fish commission; construction of
  238. 41-3-1004. Water development commission to determine
  239. 41-3-1005. Approval of storage project.
  240. 41-3-1006. Appropriation of unappropriated waters for direct instream flows.
  241. 41-3-1007. Acquisition of existing rights for instream flow purposes.
  242. 41-3-1008. Regulation of streams.
  243. 41-3-1009. Statement regarding condemnation and impairment of existing water rights.
  244. 41-3-1010. Litigation costs.
  245. 41-3-1011. Abandonment.
  246. 41-3-1012. Ingress and egress.
  247. 41-3-1013. Condemnation for municipal water purposes.
  248. 41-3-1014. Interstate compact and United States supreme court decree.
  249. 41-4-101. Legal standard of measurement.
  250. 41-4-102. Copies of records as evidence.
  251. 41-4-103. Cooperation and agreements with Utah; appropriations to Montana.
  252. 41-4-104. Adjudication of rights to water for use in adjoining state.
  253. 41-4-105. Adjudication of rights to water for use in adjoining state; permits issued before February 25, 1939.
  254. 41-4-201. Created; members; location of office; meetings generally; state engineer ex officio president; quorum.
  255. 41-4-202. Ex officio secretary of the board; duties generally.
  256. 41-4-203. Collection of fees generally.
  257. 41-4-204. Collection of fees; disposition generally.
  258. 41-4-205. State board of control; additional fees.
  259. 41-4-206. Duty at first meeting.
  260. 41-4-207. Copies of judgments involving water rights to be sent to board.
  261. 41-4-208. Tabulations and supplements of adjudicated water rights; publication generally; contents; appropriations.
  262. 41-4-209. Tabulations and supplements of adjudicated water rights; adequate copies to be printed; president to direct.
  263. 41-4-210. Tabulations of adjudicated water rights; distribution and sale of copies; disposition of proceeds.
  264. 41-4-211. Authority to administer oaths; rulemaking authorized.
  265. 41-4-301. Streams to be first adjudicated.
  266. 41-4-302. Notice; by publication; contents; taking of testimony; adjournment of hearings generally.
  267. 41-4-303. Notice; by mail to claimants.
  268. 41-4-304. Notice; all claimants to be notified.
  269. 41-4-305. Notice; enclosure of form for statement by claimant; contents.
  270. 41-4-306. Notice; statements to be under oath; administering.
  271. 41-4-307. Notice; payment of printing costs.
  272. 41-4-308. Taking of testimony generally; taking of proof.
  273. 41-4-309. Notice on completion of testimony; inspection of evidence.
  274. 41-4-310. Duty of claimants to appear; failure to comply;
  275. 41-4-311. Others contesting rights of original claimants; when permitted; procedures generally.
  276. 41-4-312. Others contesting rights of original claimants;
  277. 41-4-313. Others contesting rights of original claimants;
  278. 41-4-314. Others contesting rights of original claimants;
  279. 41-4-315. Others contesting rights of original claimants;
  280. 41-4-316. Examination and measurement of capacity of streams and works diverting water; maps or plats.
  281. 41-4-317. Determination of priorities to streams;
  282. 41-4-318. Surplus water; defined.
  283. 41-4-319. Surplus water; regulation and control.
  284. 41-4-320. Surplus water; rights of use generally.
  285. 41-4-321. Surplus water; who may divert.
  286. 41-4-322. Surplus water; limitations on use.
  287. 41-4-323. Surplus water; senior priority.
  288. 41-4-324. Surplus water; construction of W.S. 41-4-317 through 41-4-324.
  289. 41-4-325. Contents of certificate of priority; recording;
  290. 41-4-326. Conclusiveness of final decrees of board.
  291. 41-4-327. Rehearing after final order of board.
  292. 41-4-328. Authority to modify order and correct testimony.
  293. 41-4-329. Excess water; defined.
  294. 41-4-330. Excess water; rights of use generally.
  295. 41-4-331. Excess water; senior priority.
  296. 41-4-401. Rights of appeal to district court.
  297. 41-4-402. Repealed by Laws 1985, ch. 191, § 2.
  298. 41-4-403. Repealed by Laws 1985, ch. 191, § 2.
  299. 41-4-404. Repealed by Laws 1985, ch. 191, § 2.
  300. 41-4-405. Repealed by Laws 1985, ch. 191, § 2.
  301. 41-4-406. Pleadings and practice.
  302. 41-4-407. Procedure after judgment.
  303. 41-4-408. Costs; division of water pending appeal.
  304. 41-4-501. Permit required prior to construction of
  305. 41-4-502. Application for permit to acquire right to
  306. 41-4-503. Recordation; approval or rejection generally.
  307. 41-4-504. Endorsement by state engineer; return to applicant; effect of approval or rejection.
  308. 41-4-505. Additional information before approval or rejection.
  309. 41-4-506. Time limits for completing construction work;
  310. 41-4-507. Maps and plats; when required with application;
  311. 41-4-508. Maps and plats; examination; approval; filing; return of copy.
  312. 41-4-509. Maps and plats; additional information; longitudinal profiles of ditches.
  313. 41-4-510. Maps and plats; additional information; cross
  314. 41-4-511. Final proof of appropriation; procedures generally.
  315. 41-4-512. Final proof of appropriation; date of priority.
  316. 41-4-513. Adjudication of underground water rights.
  317. 41-4-514. Petition for amendment of permits; petition for
  318. 41-4-515. Endorsement of correction on records.
  319. 41-4-516. Rules and regulations authorized for W.S.
  320. 41-4-517. Appeal from action of state engineer or order of board of control.
  321. 41-5-101. Ditches; generally.
  322. 41-5-102. Ditches; jointly owned; action to recover proportionate share of work.
  323. 41-5-103. Ditches; jointly owned; lien for work.
  324. 41-5-104. Ditches; bridge to be built when ditch crosses public roads; costs of construction; failure to comply.
  325. 41-5-105. When capital stock of irrigation companies assessable for maintenance.
  326. 41-5-106. Keeping fish out of irrigation systems.
  327. 41-5-107. Removal or destruction of bridges or flumes.
  328. 41-5-108. Driving or floating logs, timber or lumber on streams.
  329. 41-5-109. Construction of acts.
  330. 41-5-110. Prohibited acts; penalty for violation.
  331. 41-5-111. Irrigation facility modification and maintenance.
  332. 41-5-201. Contractor's bond.
  333. 41-5-202. Statement of mechanic's lien; delivery to owner
  334. 41-5-203. Statement of mechanic's lien; delivery of copy
  335. 41-6-101. Authority to cooperate.
  336. 41-6-102. Election upon request of landowners; procedure generally.
  337. 41-6-103. Certificate of election proceedings to be filed;
  338. 41-6-104. Appeals.
  339. 41-6-105. Withdrawal from joint operations.
  340. 41-6-120. Number of members; qualifications; succession; quorum; voting procedures.
  341. 41-6-121. President.
  342. 41-6-122. Secretary.
  343. 41-6-123. Treasurer.
  344. 41-6-124. Adoption of name.
  345. 41-6-125. Powers generally.
  346. 41-6-126. Duties.
  347. 41-6-127. Purchase of machinery, tools or equipment.
  348. 41-6-201. Repealed by Laws 2023, ch. 24, § 1.
  349. 41-6-202. Repealed by Laws 2023, ch. 24, § 1.
  350. 41-6-203. Repealed by Laws 2023, ch. 24, § 1.
  351. 41-6-204. Repealed by Laws 2023, ch. 24, § 1.
  352. 41-6-205. Repealed by Laws 2023, ch. 24, § 1.
  353. 41-6-206. Repealed by Laws 2023, ch. 24, § 1.
  354. 41-6-207. Repealed by Laws 2023, ch. 24, § 1.
  355. 41-6-208. Repealed by Laws 2023, ch. 24, § 1.
  356. 41-6-209. Repealed by Laws 2023, ch. 24, § 1.
  357. 41-6-301. Disagreements may be referred to water commissioner; action by commissioner; fees.
  358. 41-6-302. Actions for injunctions; notice; hearings; issuance of injunctions or restraining orders; bond.
  359. 41-6-303. Relative interests of joint owners.
  360. 41-6-304. Affidavits of interest; parties joining in; filing; contents.
  361. 41-6-305. Affidavits of interest; as evidence; statute of limitations for civil actions upon.
  362. 41-6-306. Affidavits of interest; transfer of interests after filing.
  363. 41-6-307. Affidavits of interest; perjured statements.
  364. 41-6-308. Action in equity to determine rights of claimants; construction of act.
  365. 41-6-401. Organization.
  366. 41-6-402. Assessments.
  367. 41-6-501. "Land" defined.
  368. 41-6-502. "Person" defined.
  369. 41-6-503. Foreclosure of tax deeds; tax certificates as
  370. 41-6-504. Foreclosure of tax deeds; joinder of defendants; pleading; decree; rights of assignee of tax deed.
  371. 41-6-505. Foreclosure of tax deeds; sale procedures generally; redemption.
  372. 41-6-506. Foreclosure of tax deeds; disposition of sale proceeds.
  373. 41-6-507. Remedy cumulative.
  374. 41-7-101. Waiver of defect of service.
  375. 41-7-102. Construction; generally.
  376. 41-7-103. Construction; formerly organized districts; pending liens, actions.
  377. 41-7-104. Construction; existing water rights.
  378. 41-7-201. Filing of landowners' petition; contents; amendments; multiple petitions.
  379. 41-7-202. Petitioner's affidavit.
  380. 41-7-203. Land that may be included in proposed district.
  381. 41-7-204. Hearings; service of notice generally; contents.
  382. 41-7-205. Hearings; notification of nonresidents; personal service in lieu of posting for all persons.
  383. 41-7-206. Hearings; adjournment to serve persons not served.
  384. 41-7-207. Hearings; contests; grounds; notice of objections to be in writing; filing of objections.
  385. 41-7-208. Hearings; dismissal of petition improperly signed; inclusion or exclusion of land from district.
  386. 41-7-209. Fraudulent deeds for establishment or defeat of petition.
  387. 41-7-210. Court's order.
  388. 41-7-301. To be public officers; presumption in favor of validity of official acts.
  389. 41-7-302. Oath and bond; quorum; term; removal; vacancies.
  390. 41-7-303. Organization as board; officers; powers and
  391. 41-7-304. Financial records and reports; compensation and expenses; suit on bonds.
  392. 41-7-305. Maps and plans of proposed work; reports to court generally.
  393. 41-7-306. Power to alter location of irrigation works; power of court to alter plans proposed by commissioners.
  394. 41-7-307. Exclusion or inclusion of lands in district; review of report by court generally.
  395. 41-7-308. Hearings on commissioners' report; filing of objections; notice generally.
  396. 41-7-309. Hearings on commissioners' report; notice when land situated in more than 1 county.
  397. 41-7-310. Hearings on commissioners' report; procedure when report requires modification.
  398. 41-7-311. Hearings on commissioners' report; confirmation of report.
  399. 41-7-312. Hearings on commissioners' report; revision of confirmation.
  400. 41-7-313. Hearings on commissioners' report; payment of costs when objections dismissed.
  401. 41-7-314. Power to enter land to repair irrigation works; construction of ditches across railway rights-of-way.
  402. 41-7-315. Sale of water rights.
  403. 41-7-316. Election; when held; term of office; exception.
  404. 41-7-317. Election; where held; notice to voters; qualifications of voters; recording vote; proxies.
  405. 41-7-318. Election; validity; qualifications of
  406. 41-7-401. Payment in installments; construction contracts
  407. 41-7-402. Due dates; annual budget of district; hearings
  408. 41-7-403. Preparation of assessment roll; contents; how
  409. 41-7-404. Collection; disposition; enforcement.
  410. 41-7-405. Additional assessments generally.
  411. 41-7-406. Omissions; effect on other lands; duty of commissioner.
  412. 41-7-407. Omissions; procedures generally.
  413. 41-7-408. Borrowing money; bonds as security; indebtedness as lien on assessments.
  414. 41-7-409. Bonds; refunding procedures.
  415. 41-7-410. Bonds; effect of change in assessments.
  416. 41-7-411. Damages to landowners to be paid before entry
  417. 41-7-412. Advertisement for bids.
  418. 41-7-413. Application of provisions; districts organized under federal reclamation projects.
  419. 41-7-414. When assessments to be judgments against land; manner of collection.
  420. 41-7-415. Order approving contract deemed conclusive; appeals.
  421. 41-7-501. Warrants for expense of survey authorized.
  422. 41-7-502. Petition for authority to issue warrants; notice of hearing; objections.
  423. 41-7-503. Petition for authority to issue warrants; hearing generally; decree generally; appeal.
  424. 41-7-504. Effect of decree; reference to be made on warrants.
  425. 41-7-505. Assessment roll when assessments not yet approved or confirmed; equalization of assessments; levy.
  426. 41-7-601. Inclusion of provisions for maintenance and reclamation of injured lands; costs.
  427. 41-7-602. Petition for contract and assessments; hearings generally.
  428. 41-7-603. Order approving contract deemed conclusive; appeal.
  429. 41-7-701. Irrigation districts may undertake power projects.
  430. 41-7-702. Resolution of commissioners.
  431. 41-7-703. Report made to district court.
  432. 41-7-704. Hearing on objections to report.
  433. 41-7-705. Notices; how given and served.
  434. 41-7-706. Notices; contents.
  435. 41-7-707. Order of court authorizing project; procedure commissioners to follow.
  436. 41-7-708. Approved project may proceed as incident to existing system; disposition of excess energy.
  437. 41-7-709. Determination and apportionment of cost of power portion of project.
  438. 41-7-710. Costs of irrigation works and power project separately apportioned.
  439. 41-7-711. Assessments for power project to be determined; reported to court.
  440. 41-7-712. Determination of rate of assessment.
  441. 41-7-713. Provisions governing levying, approving and collecting assessments.
  442. 41-7-714. Plan may be divided; procedure.
  443. 41-7-715. Additions to projects; amended or supplemental petitions.
  444. 41-7-716. Revenue from sale of power to be determined.
  445. 41-7-717. Power revenue to be deducted from assessments.
  446. 41-7-718. Liberal construction; restrictions; regulation by public service commission.
  447. 41-7-801. Declaration of policy.
  448. 41-7-802. Definitions.
  449. 41-7-803. Creation; as corporate entity; district within district.
  450. 41-7-804. Creation; procedures generally.
  451. 41-7-805. Board of directors; election; term; vacancies; bond; removal; conduct of election.
  452. 41-7-806. Board of directors; qualifications; officers;
  453. 41-7-807. Powers; generally.
  454. 41-7-808. Powers; eminent domain; application of provisions.
  455. 41-7-809. Powers; incurring indebtedness; security for loans; limitations; agreements.
  456. 41-7-810. Powers; obtaining federal grants or loans; acceptance of gifts.
  457. 41-7-811. Powers; purchase or conveyance of water rights.
  458. 41-7-812. Powers; taxation generally; liability of district for indebtedness.
  459. 41-7-813. Construction of irrigation works; cost estimates; advertisement for bids; contracts.
  460. 41-7-814. Expenditures.
  461. 41-7-815. Sale or mortgage of irrigation works.
  462. 41-7-816. Keeping funds; fixing prices, rates and charges.
  463. 41-7-817. Dissolution.
  464. 41-7-818. Construction; generally.
  465. 41-7-819. Construction; cities and towns.
  466. 41-7-830. Authority.
  467. 41-7-831. Resolution of board of directors.
  468. 41-7-832. Election; notice.
  469. 41-7-833. Election; procedure.
  470. 41-7-834. Filing of certificate of change.
  471. 41-7-835. Construction.
  472. 41-7-850. Irrigation district may assume status of public power district.
  473. 41-7-851. Resolution of commissioners.
  474. 41-7-852. Report made to district court; contents.
  475. 41-7-853. Hearing on proposal.
  476. 41-7-854. Notice of hearing; publication.
  477. 41-7-855. Notice of hearing; contents.
  478. 41-7-856. Order of court authorizing change.
  479. 41-7-857. Submission of proposal to vote of landowners and entrymen.
  480. 41-7-858. Effect of vote on court.
  481. 41-7-859. Court order vests powers.
  482. 41-7-860. Construction and application of Public Irrigation and Power District Law.
  483. 41-7-861. Irrigation and power funds to be kept in separate accounts.
  484. 41-7-862. Different laws to apply to additions to irrigation works and power works.
  485. 41-7-863. Report of proposed construction to court; apportionment of irrigation and power costs.
  486. 41-7-864. Rights and powers preserved.
  487. 41-7-865. Liberal construction; restrictions; regulation by public service commission.
  488. 41-7-901. "Revenue" defined.
  489. 41-7-902. Revenue bonds of irrigation and irrigation and power districts authorized.
  490. 41-7-903. Designation of revenue from which principal or interest payable.
  491. 41-7-904. Statement on bonds of limitations on payment of principal.
  492. 41-7-905. Statement on bonds and coupons of limitations affecting interest payments.
  493. 41-7-906. Statement on bonds and coupons of limitations
  494. 41-7-907. Designation of revenue releases district and officers from payment otherwise.
  495. 41-7-908. Allocation of designated revenue; resolution.
  496. 41-7-909. Allocation of designated revenue; for bonds payable from revenue or assessments.
  497. 41-7-910. Allocation of designated revenue; application.
  498. 41-7-911. Allocation of designated revenue; bonds benefited by allocation.
  499. 41-7-912. Allocation of designated revenue; irrevocability.
  500. 41-7-913. Allocation of revenue to reserve fund.
  501. 41-7-914. Bonds may be made redeemable before maturity.
  502. 41-7-915. Manner of redeeming.
  503. 41-7-916. Publication of notice of redemption.
  504. 41-7-917. Publication of notice of redemption; time for publication.
  505. 41-7-918. Interest ceases on redemption date.
  506. 41-7-919. When bonds may be sold.
  507. 41-7-920. Resolution as to sale.
  508. 41-7-921. Publication of notice of sale.
  509. 41-7-922. Contents of notice of sale.
  510. 41-7-923. Sale made to highest responsible bidder.
  511. 41-7-924. Certified check to accompany bid; forfeiture.
  512. 41-7-925. Board may reject bids.
  513. 41-7-926. Readvertisement or private sale.
  514. 41-7-927. Approval of private sale required.
  515. 41-7-928. Exchange of construction bonds for property or stock.
  516. 41-7-929. Refunding bonds sold or exchanged for bonds or warrants.
  517. 41-7-930. Immediate cancellation of refunded or exchanged bonds.
  518. 41-7-931. Cancellation of unissued bonds; resolution of board.
  519. 41-7-932. Fixing time for consideration of resolution of cancellation.
  520. 41-7-933. Publication of cancellation resolution and notice of time for consideration.
  521. 41-7-934. No bonds issued after cancellation resolution adopted.
  522. 41-7-935. Destruction of canceled bonds and coupons.
  523. 41-7-1001. Petition of landowners.
  524. 41-7-1002. Election; notice.
  525. 41-7-1003. Election; conduct; certification of result; report of district indebtedness.
  526. 41-7-1004. Order for hearing on results of election; generally.
  527. 41-7-1005. Order for hearing on results of election; publication.
  528. 41-7-1006. Hearings; final settlement.
  529. 41-8-101. Definitions.
  530. 41-8-102. Purposes.
  531. 41-8-103. Formation.
  532. 41-8-104. Area.
  533. 41-8-105. Petition for establishment; filing generally; contents; copy to be furnished conservation commission.
  534. 41-8-106. Petition for establishment; establishment in more than 1 soil and water conservation district.
  535. 41-8-107. Petition for establishment; hearing; notice.
  536. 41-8-108. Referendum prerequisite to establishment; generally.
  537. 41-8-109. Referendum prerequisite to establishment; voting; ballots; right of landowners to vote; proxies.
  538. 41-8-110. Referendum prerequisite to establishment;
  539. 41-8-111. Inclusion of additional land; detaching land; change of boundaries; change of name.
  540. 41-8-112. Board of directors; eligibility; election; terms; officers.
  541. 41-8-113. Board of directors; powers generally.
  542. 41-8-114. Board of directors; issuance of bonds.
  543. 41-8-115. Board of directors; per diem and mileage.
  544. 41-8-116. Hearing on proposed projects.
  545. 41-8-117. Appointment of appraisers and appraisal of benefited property.
  546. 41-8-118. Hearing on report of appraisers.
  547. 41-8-119. Appeal from approval of project or determination of benefits or assessments.
  548. 41-8-120. Assessment of benefits against land of state and its subdivisions.
  549. 41-8-121. Assessments generally.
  550. 41-8-122. Levy, collection and disposition of taxes and special assessments; expenditure of funds.
  551. 41-8-123. Lien of assessment; collection of delinquent assessments.
  552. 41-8-124. Repealed by Laws 1998, ch. 115, § 5.
  553. 41-8-125. Supervision upon discontinuance.
  554. 41-8-126. Existing water rights preserved.
  555. 41-9-101. Petition for organization; when filed; contents; service of notice or petitions generally.
  556. 41-9-102. Petition for organization; amendment; multiple petitions.
  557. 41-9-103. What lands may be included.
  558. 41-9-104. Notice of hearing; service generally; contents.
  559. 41-9-105. Notice of hearing; nonresidents.
  560. 41-9-106. Notice of hearing; proof of service.
  561. 41-9-107. Notice of hearing; effect of personal service.
  562. 41-9-108. Notice of hearing; adjournment of hearings when notice not fully served.
  563. 41-9-109. Notice of hearing; service after adjournment.
  564. 41-9-110. Notice of hearing; defective service generally.
  565. 41-9-111. Hearings; grounds for contesting.
  566. 41-9-112. Hearings; procedure generally.
  567. 41-9-113. Hearings; affidavits of petitioners as evidence.
  568. 41-9-114. Hearings; dismissal of defective petition.
  569. 41-9-115. Fraudulent conveyances to defeat or establish petition.
  570. 41-9-116. District commissioners; number; appointment;
  571. 41-9-117. District commissioners; oath; bond generally; quorum.
  572. 41-9-118. District commissioners; term.
  573. 41-9-119. District commissioners; new appointments.
  574. 41-9-120. District commissioners; vacancies.
  575. 41-9-121. District commissioners; financial records, minutes of meetings to be kept.
  576. 41-9-122. District commissioners; filing of annual financial report.
  577. 41-9-123. District commissioners; compensation and expenses.
  578. 41-9-124. District commissioners; under control and direction of court; failure to obey.
  579. 41-9-125. Suit on bond of commissioners.
  580. 41-9-126. Organization of commission; examination of lands; contents of preliminary report.
  581. 41-9-127. Change of plan proposed in petition.
  582. 41-9-128. Hearings on report; notice generally.
  583. 41-9-129. Hearings on report; notice to owners of added lands.
  584. 41-9-130. Hearings on report; adjournment.
  585. 41-9-131. Hearings on report; remonstrances.
  586. 41-9-132. Hearings on report; trial; when petition for organization dismissed.
  587. 41-9-133. Hearings on report; when report confirmed.
  588. 41-9-134. Hearings on report; findings conclusive; appeal.
  589. 41-9-135. Creation of corporate entity upon confirmation of report.
  590. 41-9-136. Corporate authorities.
  591. 41-9-137. All proceedings deemed necessary.
  592. 41-9-201. Authority of commissioners to enter lands for repairs.
  593. 41-9-202. Power of eminent domain.
  594. 41-9-203. Presumption of validity of acts of commissioners.
  595. 41-9-204. Commissioners under supervision of court; removal; new bonds.
  596. 41-9-205. Waiver of notice.
  597. 41-9-206. Liberal construction.
  598. 41-9-210. Levels, surveys and maps to be made; report to court required.
  599. 41-9-211. Contents; starting points, routes and termini.
  600. 41-9-212. Contents; change of boundaries generally.
  601. 41-9-213. Contents; assessment of damages.
  602. 41-9-214. Contents; assessment of benefits.
  603. 41-9-215. Contents; cost of construction.
  604. 41-9-216. Contents; assessments upon particular tracts, lots and corporations.
  605. 41-9-217. Contents; assessments for construction generally.
  606. 41-9-218. Contents; special benefits to corporations.
  607. 41-9-219. Contents; costs of repairs.
  608. 41-9-220. Contents; maps and plans.
  609. 41-9-221. Commissioners not to be confined to plans in petition.
  610. 41-9-222. Changing boundaries upon application to court; filing of report.
  611. 41-9-223. Notice of hearings on report; contents; order for hearing.
  612. 41-9-224. Notice of hearings on report; publication and service generally.
  613. 41-9-225. Notice of hearings on report; when land situated in several counties.
  614. 41-9-226. Notice of hearings on report; effect of personal service.
  615. 41-9-227. Hearings; modification of report generally.
  616. 41-9-228. Hearings; confirmation order generally; appeal.
  617. 41-9-229. Hearings; modification of combination order.
  618. 41-9-230. Hearings; supplemental report; amending original report.
  619. 41-9-231. Judgment; entry when petition on proceedings dismissed.
  620. 41-9-232. Judgment; filing of statement of costs; hearing.
  621. 41-9-233. Judgment; contributions for payment prorated.
  622. 41-9-240. Payment generally; unpaid assessments as liens; duty of clerk of court; state lands.
  623. 41-9-241. Payment in installments.
  624. 41-9-242. Current expenses; annual budget generally.
  625. 41-9-243. Assessment roll generally.
  626. 41-9-244. Certification procedure.
  627. 41-9-245. Additional assessments; generally.
  628. 41-9-246. Additional assessments; commissioner's petition; hearings; modification of budget.
  629. 41-9-247. Omissions; generally.
  630. 41-9-248. Omissions; agreement between landowner and commissioners.
  631. 41-9-249. Application of state revenue laws; tax sale for delinquent assessments.
  632. 41-9-250. Objections; landowners to show cause; presumption of validity of assessments.
  633. 41-9-251. Objections; statement of owner; default; decrees; appeal; adjournment of hearing; trial.
  634. 41-9-252. Objections; procedure when assessments declared void.
  635. 41-9-253. Assessments as liens generally.
  636. 41-9-254. Assessment as court judgment.
  637. 41-9-255. Conclusiveness of order; appeals generally.
  638. 41-9-256. Notes and bonds generally.
  639. 41-9-257. Refunding of indebtedness.
  640. 41-9-258. Effect of change in assessments upon existing bonds.
  641. 41-9-259. Collection generally.
  642. 41-9-260. Bidding procedure when cost over $500.00.
  643. 41-9-261. Commissioners not to have financial interest in construction contracts.
  644. 41-9-262. Entry of commissioners on land; payment of damages to owner.
  645. 41-9-263. Location of drains.
  646. 41-9-264. Drained lands outside of district; commissioners' report requesting assessments.
  647. 41-9-265. Drained lands outside of district; court order to landowners to show cause.
  648. 41-9-266. Drained lands outside of district; hearings; remonstrances; trial on issues.
  649. 41-9-267. Drained lands outside of district; hearings; findings; annexation to district.
  650. 41-9-268. Drained lands outside of district; effect of court order; appeal.
  651. 41-9-269. Drained lands outside of district; levy of assessments by commissioners.
  652. 41-9-270. Drained lands outside of district; filing of
  653. 41-9-271. Drains across railroad rights-of-way; generally.
  654. 41-9-272. Drains across railroad rights-of-way; liability of district to railroad.
  655. 41-9-273. Drains across railroad rights-of-way; railroads to grant free access; failure to comply.
  656. 41-9-274. Petition for reconstruction, enlargement,
  657. 41-9-275. Petition for construction; filing by landowners in lieu of commissioners.
  658. 41-9-276. Petition; hearing procedures generally.
  659. 41-9-277. Petition; procedure when petition granted.
  660. 41-9-278. Petition; assessments.
  661. 41-9-301. Authorized.
  662. 41-9-302. Contents of petition.
  663. 41-9-303. Order for hearing on petition; notice generally.
  664. 41-9-304. Manner of service.
  665. 41-9-305. Hearing.
  666. 41-9-306. Court order; creation of new district as
  667. 41-9-401. Agreement generally; apportionment of maintenance expenses; municipal assessments generally.
  668. 41-9-402. Assessments for bond principal and interest; levy and collection.
  669. 41-9-403. Mill levy and indebtedness of town not to be affected.
  670. 41-9-501. Qualifications of districts as prerequisites to contracting.
  671. 41-9-502. When district authorized to enter into contract.
  672. 41-9-503. Securing of district indebtedness due to contract.
  673. 41-9-504. Unentered public lands as majority of district;
  674. 41-9-601. Petition of landowners.
  675. 41-9-602. Election; notice.
  676. 41-9-603. Election; conduct; certification of result; report of district indebtedness.
  677. 41-9-604. Order for hearing on results of election; generally.
  678. 41-9-605. Election hearing results; publication.
  679. 41-9-606. Hearing; final settlement.
  680. 41-10-101. Definitions.
  681. 41-10-102. Lands included in district.
  682. 41-10-103. Establishment of districts; jurisdiction of board of county commissioners.
  683. 41-10-104. Organization of districts; information required in the petition.
  684. 41-10-105. Bond or cash deposit required at time of filing
  685. 41-10-106. Repealed by Laws 1998, ch. 115, § 5.
  686. 41-10-107. Election in connection with establishment.
  687. 41-10-108. Copy of resolution establishing district to be
  688. 41-10-109. Members of original board of directors to
  689. 41-10-110. Original board generally.
  690. 41-10-111. Regular and special meetings of board; quorum;
  691. 41-10-112. Subsequent elections of members of board of directors of district.
  692. 41-10-113. Powers of district board.
  693. 41-10-114. Authority of board to levy and collect taxes generally; maximum levy.
  694. 41-10-115. Annual determination by board of amount of
  695. 41-10-116. Matters to be considered in certifying annual levies; additional levies.
  696. 41-10-117. Duty of county officials to levy and collect
  697. 41-10-118. Sale of real and personal property for nonpayment of taxes.
  698. 41-10-119. Authority of board to levy taxes and collect revenue for purpose of creating a reserve fund.
  699. 41-10-120. Change in boundaries of districts; generally.
  700. 41-10-121. Repealed by Laws 1998, ch. 115, § 5.
  701. 41-10-122. Repealed by Laws 1998, ch. 115, § 5.
  702. 41-10-123. Repealed by Laws 1998, ch. 115, § 5.
  703. 41-10-124. Authority of district to borrow money; types of
  704. 41-10-125. Borrowing money without election in
  705. 41-10-126. Resolution and election prerequisite to issuance of general obligation bonds.
  706. 41-10-127. Maximum aggregate amount of bonds or other evidences of indebtedness.
  707. 41-10-128. Borrowing money and issuing bonds for purpose
  708. 41-10-129. Power to create local improvement districts vested in board.
  709. 41-10-130. Submission of question of creating indebtedness
  710. 41-10-131. Principal and interest to be paid solely from
  711. 41-10-132. Bonds not to be debt of district; exception as
  712. 41-10-133. Resolution may provide that bonds shall recite
  713. 41-10-134. Date of bonds; maturity; payment and rate of
  714. 41-10-135. Execution of bonds; signature by chairman of
  715. 41-10-136. Sale of bonds at public or private sale; price;
  716. 41-10-137. Moneys received from issuance of bonds to be
  717. 41-10-138. Covenants in resolution authorizing issuance of bonds.
  718. 41-10-139. Rights and powers of holders of bonds.
  719. 41-10-140. Publication of resolution or other proceedings
  720. 41-10-141. Payment of preliminary expenses incurred in
  721. 41-10-142. Refunding bonds.
  722. 41-10-143. Duty of board to impose tolls, fees and charges
  723. 41-10-144. Exemption of property and bonds from taxation.
  724. 41-10-145. Authority of municipalities, counties and
  725. 41-10-146. Questions of validity to be given preference on court docket.
  726. 41-10-147. Effect of failure to give notice; board of
  727. 41-10-148. Reorganization of sanitary and improvement districts as sewer district or water and sewer district.
  728. 41-10-149. Full authority for authorization and issuance of bonds; effect on other statutes.
  729. 41-10-150. Liberal construction.
  730. 41-10-151. Finances administered according to the Uniform Municipal Fiscal Procedures Act.
  731. 41-10-152. City or town may annex areas within sewer or water district.
  732. 41-10-153. Obligations and authority remain with district.
  733. 41-10-154. Administration may be transferred to city or town by agreement.
  734. 41-10-155. Obligation to provide services remains with district; limitation.
  735. 41-10-156. Bonding authority of city or town to acquire
  736. 41-10-157. Application.
  737. 41-11-101. Duties of attorney general.
  738. 41-11-201. Appointment of commissioners to serve on joint
  739. 41-11-202. Designation of commissioners to represent state
  740. 41-11-203. Authority of commissioners; investigations.
  741. 41-11-204. Assistant commissioners.
  742. 41-11-205. Mileage, per diem and compensation for commissioners and assistant commissioners.
  743. 41-11-206. Depository of records relating to interstate streams and water compacts.
  744. 41-11-301. Short title.
  745. 41-11-302. Wyoming Colorado River advisory committee; purpose; membership.
  746. 41-11-303. State engineer duties; dissemination of information.
  747. 41-11-304. Applicability of public meetings act.
  748. 41-12-101. Generally.
  749. 41-12-102. When binding; notice of ratification.
  750. 41-12-201. Purpose.
  751. 41-12-202. Definitions.
  752. 41-12-203. Administration.
  753. 41-12-204. Water gauging stations.
  754. 41-12-205. Allocation of waters.
  755. 41-12-206. Acquisition of property in another state.
  756. 41-12-207. Construction and use of dams; claims for storage or diversion; appropriations.
  757. 41-12-208. Water for stock water use in South Dakota.
  758. 41-12-209. Size of reservoirs.
  759. 41-12-210. Duration of compact.
  760. 41-12-211. Termination of compact.
  761. 41-12-212. Rights of action preserved.
  762. 41-12-213. Application of compact.
  763. 41-12-214. When compact becomes operative.
  764. 41-12-215. Severability of provisions.
  765. 41-12-301. Generally.
  766. 41-12-302. When binding; notice of ratification.
  767. 41-12-401. Generally.
  768. 41-12-402. When binding; notice of ratification.
  769. 41-12-501. Generally.
  770. 41-12-502. When binding; notice of ratification.
  771. 41-12-601. Generally.
  772. 41-12-602. When binding; notice of ratification.
  773. 41-12-603. Diversions from the Yellowstone River Basin; definitions.
  774. 41-12-604. Diversions from the Yellowstone River Basin; authority to approve.
  775. 41-12-605. Diversions from the Yellowstone River Basin; application; notice.
  776. 41-12-606. Diversions from the Yellowstone River Basin; objections; public hearing.
  777. 41-12-607. Diversions from the Yellowstone River Basin; criteria for approval; terms.
  778. 41-12-701. Generally.
  779. 41-12-702. When binding; notice of ratification.
  780. 41-12-801. Studies authorized for waters allocated by certain compacts.
  781. 41-13-101. Definitions; classification of motorboats.
  782. 41-13-102. Motorboat certificate of number required.
  783. 41-13-103. Motorboats to be numbered; exempt motorboats.
  784. 41-13-104. Application for certificate; issuance of
  785. 41-13-105. Watercraft accidents or collisions; duty to
  786. 41-13-106. Accident report information to federal government.
  787. 41-13-107. Political subdivisions not to number watercraft.
  788. 41-13-108. Publication and distribution of regulations.
  789. 41-13-109. Motorboat registration fee.
  790. 41-13-110. Disposition of registration fees.
  791. 41-13-111. Prohibited acts; penalties.
  792. 41-13-201. Repealed by Laws 1979, ch. 112, § 2.
  793. 41-13-202. Provisions applicable to all watercraft in state; supplemental to federal laws and regulations.
  794. 41-13-203. Careless operation defined.
  795. 41-13-204. Reckless operation defined.
  796. 41-13-205. Repealed by Laws 1982, ch. 75, § 5; 1983 ch.
  797. 41-13-206. Operation of watercraft by intoxicated or drugged person prohibited.
  798. 41-13-207. Operation of watercraft by person under disability prohibited.
  799. 41-13-208. Overloading prohibited.
  800. 41-13-209. Overpowered watercraft prohibited; horsepower rating plates; mufflers required.
  801. 41-13-210. Riding on gunwales or bow decking prohibited; exceptions.
  802. 41-13-211. Buoys and markers; operation in marked restricted areas prohibited; exceptions.
  803. 41-13-212. Motorboat pulling skier to be occupied by at
  804. 41-13-213. Safety equipment required.
  805. 41-13-214. Repealed by Laws 1979, ch. 112, § 2.
  806. 41-13-215. Enforcement.
  807. 41-13-216. Penalties for violations; suspension of privilege to operate; operating while privilege suspended.
  808. 41-13-217. Races or regattas.
  809. 41-13-218. Regulations.
  810. 41-13-219. Age of operator of motorboat.
  811. 41-13-220. Eluding an officer; emergency watercraft equipment restricted.
  812. 41-14-101. Definitions.
  813. 41-14-102. Contracts with United States for acquisition of
  814. 41-14-103. Issuance of bonds; purchase of bonds by state

Proposed changes to this act

No one has proposed a change to this act yet.

814 provisions

41-3-778. Exemptions.

All property of whatever kind and nature owned by the state and by towns, cities, school districts, drainage districts, irrigation districts, park districts, water districts, or any other governmental agency or agencies within the said district, shall be exempt from assessment and levy by the board as provided in this act for the purposes herein contained.

Propose a change

41-3-779. Nonpayment.

If the taxes and/or assessments levied are not paid as herein provided, then the real property shall be sold at the regular tax sale for the payment of such taxes and assessments, interest and penalties, in the manner provided by the statutes of the state of Wyoming for selling property for nonpayment of general taxes. If there are no bids at said tax sale for the property so offered under class A and class B, said property shall be struck off to the county, and the county shall account to the district in the same manner as provided by law for accounting for school, town and city taxes. And if there are no bids for the property so offered under class C and class D, said property shall be struck off to the district and the tax certificate shall be issued in the name of the district and the board shall have the same power with reference to sale of said tax certificate, as now vested in county commissioners and county treasurer when property is struck off to the counties.

Propose a change

41-3-801. Petition for establishment; notice of election; qualifications of voters; conduct of election.

A flood control district may be established under the procedures for petitioning, hearing and election of special districts, and subsequent elections shall be held, as set forth in the Special District Elections Act of 1994. The petition and notice of publication shall describe by metes and bounds, following as nearly as possible established school district boundaries, the lands to be included in said district.

Propose a change

41-3-802. Election of board of directors; number; term;

quorum; bond; powers and duties generally; election of officers. (a) If the formation of the district is approved the board of county commissioners shall enter a finding to that effect upon its records after which the district shall be considered to be established and shall be empowered through its governing board of directors to acquire personal property and equipment for control purposes by gift, devise, bequest, donation, or purchase and to enter into contracts for the acquisition by purchase or lease, or otherwise, of personal property and equipment; to convey, lease and otherwise dispose of its property for flood control purposes and to establish sinking funds for the replacement of worn out or obsolete equipment; and upon the vote of a majority of the voters of the district voting at an election held as provided by W.S. 22-21-101 through 22-21-112, the district shall be empowered to issue bonds for the purpose of purchasing equipment and supplies and for the operational expense of the district. (b) A district established under this act shall acquire and hold property in the name of ".... Flood Control District of .... County", state of Wyoming, and the name and a record thereof shall be entered upon the board of county commissioners' records of said county of the establishment of said district, such name to be selected by the board of directors of the district, and said district as established shall have power to sue and be sued by such name. (c) The election of officers shall be held at the same time as the election for formation of the district. At the election a board of six (6) directors shall be elected by written ballot, who shall serve without compensation to govern the affairs of the district until the first subsequent director election pursuant to W.S. 22-29-112. At that election two (2) members of the board shall be elected for one (1) year, two (2) for two (2) years, and two (2) for three (3) years, so that each succeeding year the term of two (2) members will expire and two (2) members will be elected for a three (3) year term. Each year the board shall elect one (1) of its members secretary-treasurer. Before the secretary-treasurer enters on the discharge of his duties, he shall execute to the state of Wyoming, a bond with an approved corporate surety or three (3) or more sufficient sureties, to be approved by the district board of directors and in such penal sum as they may direct, which bond with the approval of the board endorsed thereon by their president, shall be filed in the office of the county clerk. It is further directed that four (4) members of this board shall constitute a quorum and that no business shall transpire without a quorum in attendance. Any expenditure of funds shall be made only by signed vouchers bearing the signatures of both president and secretary-treasurer. (d) At least thirty (30) days prior to the time for annual levy of general taxes by the board of county commissioners of the county wherein any such district is situated, the board of directors of such district shall certify to the board of county commissioners the amount of special mill levy, provided for in W.S. 41-3-803, which said district board considers necessary for district operations during the following year.

Propose a change

41-3-803. Special tax authorized; power of board to enter

into cooperative agreements; authority to make rules and hire employees. (a) The board of county commissioners of the county wherein each district is situated shall, at the time of the annual levy of general taxes, levy an additional special tax upon the real property in the amount certified to it by the district board of directors under W.S. 41-3-802, but not to exceed twelve (12) mills on each dollar of assessed valuation on all real property in the respective districts for the equipping and operational expenses of such district and for the payment of the bonded indebtedness of the same. The district board may receive voluntary donations and appropriations of money from any other source, and such donation hereinafter provided, by the county treasurer upon request of the district board. Nothing in this act shall be construed to prohibit boards of county commissioners from appropriating funds, paying any money or cooperating with any district so established under this act for the purpose of controlling or eradicating floods and all aforementioned moneys shall be turned over to the county treasurer to be kept in a fund designated as ".... Flood Control District of .... County Fund". Authority for such appropriations, payments or cooperation by boards of county commissioners is hereby authorized. (b) Districts created under this act are authorized to enter into cooperative agreements with any federal, state, local, or private agency for the control and eradication of floods on highways, rights-of-way, rivers, streams, canals or ditches. Flood control district boards are hereby authorized and empowered to make and adopt rules and regulations necessary for carrying out the purposes and provisions of this act and to enforce such rules and regulations and shall file those rules with the county clerk for each county in which the district is located. The boards are hereby empowered to appoint employees and assistants as may be necessary and to fix their compensation.

Propose a change

41-3-901. Definitions.

(a) As used in this act, unless the context plainly otherwise requires: (i) "Person" means a natural person, partnership, association, corporation, municipality, irrigation district, the state of Wyoming, any agency or political subdivision thereof, and the United States or any agency thereof; (ii) "Underground water" means any water, including hot water and geothermal steam, under the surface of the land or the bed of any stream, lake, reservoir, or other body of surface water, including water that has been exposed to the surface by an excavation such as a pit; (iii) "Aquifer" means any underground geological structure or formation having boundaries that may be ascertained or reasonably inferred, in which water stands, flows or percolates; (iv) "Well" means any artificial opening or excavation in the ground, however made, by which underground water is sought or through which it flows under natural pressure or is artificially withdrawn, and a series of wells developed as a unit and pumped collectively by a single pumping unit shall be considered as one (1) well; (v) "Construction" of a well includes boring, drilling, jetting, digging or excavating, and installing casing, pump and other devices for withdrawing or facilitating the withdrawal of underground water, or measuring the depth to the water table or the flow of the well; (vi) "Pollution" of underground water means any impairment of the natural quality of such water, however caused, including impairment by salines, minerals, industrial wastes, domestic wastes or sewage, whether indrafted directly or through infiltration into the underground water supply; (vii) "Additional supply" means underground water for irrigation use which is appurtenant to lands that have a direct flow supply of surface water or have an original supply from another underground water source. The limit of use of additional supply is beneficial use; (viii) "Hydrothermal system" means a groundwater system, including cold water recharge and transmission and warm and hot water discharge; (ix) "Hydrothermal feature" means a surface manifestation of a hydrothermal system, including, but not limited to, hot springs, geysers, mud pots and fumaroles.

Propose a change

41-3-902. Spring waters; perfection of right to use; limitation.

All springs and spring waters where the yield does not exceed twenty-five (25) gallons per minute and where the use is for domestic or stock purposes only, shall be considered as groundwater. Perfection of the right to use spring water up to twenty-five (25) gallons per minute for domestic or stock use shall be made in accordance with the laws pertaining to groundwater.

Propose a change

41-3-903. By-product water; definition.

By-product water is water which has not been put to prior beneficial use, and which is a by-product of some nonwater-related economic activity and has been developed only as a result of such activity. By-product water includes, but is not limited to, water resulting from the operation of oil well separator systems or mining activities such as dewatering of mines.

Propose a change

41-3-904. By-product water; appropriation; conditions and limitation.

(a) Any person intending to appropriate by-product water for beneficial use shall file an application with the state engineer on the forms and in the manner prescribed for groundwater applications. By-product water shall be considered as being in the same class as groundwater for the purposes of administration and control. An application may be filed only if both the following conditions exist: (i) The by-product water is intercepted while it is readily identifiable and before it has commingled with the waters of any live stream, lake, reservoir or other surface watercourse, or part of any groundwater aquifer; and (ii) The developer of the water is the applicant, or an agreement is filed in the office of the state engineer wherein the developer of the water gives the applicant permission to use the water as proposed in the application. The agreement must be signed by the developer of the water, and may contain provisions for reservation of the water to the use of the developer-grantor, and if so stipulated, the reservation can be superior in right and title to any use by the applicant-grantee. (b) In all other cases, an application to appropriate by-product water shall be governed by the laws pertaining to surface water, and by-product water shall be considered as part of the surface supply, subject to use by existing priority rights.

Propose a change

41-3-905. Application; generally; registration of vested

rights; permit to construct well; registration of formerly exempted wells. Nothing herein contained shall be construed so as to interfere with the right of any person to use water from any existing well where such water is economically and beneficially used for irrigation or for municipal, railway, industrial or other beneficial use, to the extent only that such continued right does not injuriously affect existing adjudicated surface rights not heretofore abandoned, and such use is hereby declared to constitute a vested right, provided, that the owner of any such right acquired before April 1, 1947, must have filed with the state engineer the statement required by W.S. 41-3-901 through 41-3-938, on or before December 31, 1957, and the owner of any right acquired on or after April 1, 1947, must have registered his well with the state engineer as required by W.S. 41-3-901 through 41-3-938, prior to the effective date of this act, and provided further, that the right to take underground water from any well exempted from the provisions of W.S. 41-3-901 through 41-3-938, that is not exempted from the provisions of this act, and that shall be registered with the state engineer prior to the effective date of this act, shall also constitute a vested right in the use of water with priority as of the time of completion of the well. No well shall be constructed after the effective date of this act unless a permit has been obtained from the state engineer. All existing stock and domestic wells formerly exempted may be registered with the state engineer prior to December 31, 1972. The state engineer shall make appropriate forms for such registration available with each county clerk and at such other places as he deems feasible.

Propose a change

41-3-906. Application; rights subject to preferences; rights of municipal corporations.

Rights to underground water shall be subject to the same preferences as provided by law for surface waters, and rights not preferred may be condemned and changed to a preferred use in the manner provided by law for surface waters. Nothing herein contained shall be construed to impair the rights of municipal corporations to acquire any underground water or underground water rights for a necessary public purpose by eminent domain or condemnation proceedings.

Propose a change

41-3-907. Application; preferred right of appropriations for stock or domestic use.

Appropriations of underground water for stock or domestic use, the latter being defined as household use and the watering of lawns and gardens for noncommercial family use where the area to be irrigated does not exceed one (1) acre, where the yield or flow does not exceed .056 cubic feet per second or twenty-five (25) gallons per minute, shall have a preferred right over rights for all other uses, regardless of their dates of priority, subject to the provisions of W.S. 41-3-911, as amended, if an appropriation is for two (2) or more uses, and includes one (1) of the above preferred uses, the preferred use shall be limited to .056 cubic feet per second or twenty-five (25) gallons per minute, and the application shall specify one (1) acre upon which such preferred uses shall be made. Such preferred use shall not include municipal use by any person of water appropriated by a municipality or company, or any instance where water is purchased or held out for sale.

Propose a change

41-3-908. Division advisory committee; appointment; removal; duties; expense allowances.

(a) In each of the water divisions of the state, as defined in W.S. 41-3-501, there shall be established a division advisory committee on underground water. Each committee shall consist of three (3) persons, appointed by the governor, who shall in making such appointments, select persons who, in his opinion, will adequately represent the landowners and water users of the division, the geographical areas of the division and the public interest. The first committee in each division shall consist of one (1) member appointed for a term of two (2) years, one (1) member appointed for a term of four (4) years, and one (1) member appointed for a term of six (6) years. Their successors shall each be appointed for a term of six (6) years. The governor may remove any member of any advisory committee as provided in W.S. 9-1-202. (b) The duties of the division advisory committee on underground water are: (i) To call and supervise the election of the members of control area advisory boards; (ii) To assist and advise the state engineer and the board regarding policies that affect the underground water of this state, such assistance and advice to consider both the interests of underground water users and the interests of the general public; (iii) To provide advice and assistance to the state engineer and superintendents in arriving at solutions to underground water problems as they arise within the water division; (iv) To provide advice and assistance to control area advisory boards, particularly in the development of control measures which are recommended to the state engineer for adoption; (v) To provide underground water users within the division with information relative to the policies and procedures of the state engineer and board which affect the use of underground water. (c) The members of each of the division advisory committees shall receive the same per diem, mileage and expense allowances while attending and traveling to and from control area board meetings and other official business of the committee in the same manner and amount as employees of the state.

Propose a change

41-3-909. State engineer; powers generally.

(a) In the administration and enforcement of this act and in the effectuation of the policy of the state to conserve its underground water resources, the state engineer is authorized and empowered on advice and consent of the board of control: (i) To prescribe such rules and regulations as may be necessary or desirable to enable him to efficiently administer this act; (ii) To require such reports from well drillers as may be necessary or desirable; (iii) To require such annual reports from underground water users as may be necessary or desirable; (iv) To make such investigations as may be necessary or desirable, and to cooperate in such investigations with agencies of the United States, agencies of this state or any other state, political subdivision of this state, any public or private corporation, or any association or individual; (v) To make regulations concerning the spacing, distribution and location of wells in critical areas; (vi) To establish standards for the construction of wells, to work with the division advisory board, governmental subdivisions, and water user organizations to encourage the adoption of local standards of beneficial use and methods of conveyance and application of water designed to conserve and prevent waste of supplies; (vii) To require, whenever practical, all flowing wells to be so capped or equipped that the flow of water can be stopped when the wells are not in use, and to require both flowing and nonflowing wells to be so constructed and maintained as to prevent the waste of underground water either above or below the land surface; (viii) To require the abatement of any condition, or the sealing of any well, responsible for the admission of polluting materials into an underground water supply; (ix) To delegate any of the duties and powers imposed or granted by this act, to the deputy state engineer or to an assistant state engineer, or other qualified member of his staff; (x) To bring suit to enjoin the construction of illegal wells or the withdrawal or use of water therefrom, or to enforce any of the provisions of this act or of orders issued thereunder, and to intervene in any action or proceeding when it appears that the determination of such action or proceeding may result in the depletion of underground water resources of the state contrary to the policy expressed in this act.

Propose a change

41-3-910. State engineer; power to determine area and boundaries of districts.

The state engineer is authorized and directed to determine the area and boundaries of districts overlying the various aquifers yielding underground waters in this state and to assign to each district a distinctive name or number. He may establish subdistricts when parts of an aquifer require or may require separate regulations from the rest. He may alter the boundaries of such districts and subdistricts at any time. He may establish different districts for different aquifers that overlie each other in whole or in part.

Propose a change

41-3-911. Authority to order interfering appropriator to

cease withdrawals of water; hearing complaints by appropriators. (a) Whenever a well withdrawing water for beneficial purposes shall interfere unreasonably with an adequate well developed solely for domestic or stock uses as defined in W.S. 41-3-907, whether in a control area or not, the state engineer may, on complaint of the operator of the stock or domestic well, order the interfering appropriator to cease or reduce withdrawals of underground water, unless such appropriator shall furnish at his own expense, sufficient water at the former place of use to meet the need for domestic or stock use. In case of interference between two (2) wells utilizing water for stock or domestic use as defined in W.S. 41-3-907, the appropriation with the earliest priority shall have the better right. (b) Any appropriator of either surface or underground water may file a written complaint alleging interference with his water right by a junior right. Complaints are to be filed with the state engineer and are to be accompanied by a fee of one hundred dollars ($100.00) to help defray costs of investigation. This section is not applicable to interference between two (2) surface water rights. Upon receiving the complaint and fee, the state engineer shall undertake an investigation to determine if the alleged interference does exist. Following the investigation, the state engineer shall issue a report to all interested parties stating his findings. The report may suggest various means of stopping, rectifying or ameliorating the interference or damage caused thereby. (c) Any interested appropriator who is dissatisfied with the results of the foregoing procedure may proceed under the applicable provisions of the Wyoming Administrative Procedure Act. If a hearing is to be held, it shall be held before the appropriate water division superintendent. The superintendent shall report to the board of control at its next meeting. The board shall issue its order to include findings of fact and conclusions of law.

Propose a change

41-3-912. Control areas; board member districts;

designation; redesignation; duty of state engineer; hearings. (a) "Control area" means any underground water district or subdistrict that has been so designated by the board of control. The board of control may designate a control area for the following reasons: (i) The use of underground water is approaching a use equal to the current recharge rate; (ii) Ground water levels are declining or have declined excessively; (iii) Conflicts between users are occurring or are foreseeable; (iv) The waste of water is occurring or may occur; or (v) Other conditions exist or may arise that require regulation for the protection of the public interest. (b) Whenever the engineer has information leading him to believe that any underground water district or subdistrict should become a control area, he shall immediately report in writing to the board of control all information known by him with reference to said area. (c) The board of control shall fix a time and place to consider the information supplied by the state engineer and hear any other evidence presented at the time of the hearing. At the conclusion of the hearing, the board of control shall issue an order declaring that the area in question is or is not to be a control area. If the board determines that a control area needs to be created, it shall define the area geographically and stratigraphically. The board of control may designate five (5) board member districts for the purpose of the election of the control area advisory board. (d) On the petition of five (5) persons owning or entitled by public land filing to the possession of land within the control area, or upon the recommendation of the state engineer, the board of control may consider the redesignation of the geographic or stratigraphic boundaries of a control area. If redesignation is considered, the board shall fix a time and place to hear the information supplied by the petitioners, the state engineer or other interested persons. Within ninety (90) days of the hearing, the board shall issue its order. If a control area is redesignated geographically, the board shall determine whether to divide the area into board member districts pursuant to subsection (c) of this section. (e) On the petition of five (5) persons owning or entitled by public land filing to the possession of land within the control area, the control area advisory board shall consider the designation or redesignation of board member districts. If the control area advisory board determines that board member districts should be designated or redesignated, it shall submit its recommendation to the board of control for approval. (f) The action of the board of control in denying at any time a petition or recommendation for redesignation is final and not subject to review. (g) Whenever a control area has been designated or redesignated the state engineer may, without hearings or other proceedings, refuse to grant permits for the drilling of any wells within the control area.

Propose a change

41-3-913. Control areas; election of control area advisory board; mileage and expense allowances.

(a) When an underground water district or subdistrict is declared to be a control area, when the board of control geographically redesignates a control area or when the board of control approves the recommendation of a control area advisory board that board member districts be designated or redesignated, a control area advisory board shall be created in the manner provided herein. The control area advisory board shall consist of five (5) adults who own land or underground water rights, or who are the officers, officials or members of the board of a corporation which owns land or underground water rights within the control area. The board shall represent the entire control area. (b) The state engineer shall notify the division advisory committee of the division in which the control area is located, of the designation or redesignation of the control area. Within twenty (20) days of notification, the division advisory committee shall select a nominating committee of not less than three (3) persons entitled to vote in the election of the control area advisory board. The nominating committee shall nominate not less than five (5) persons for election to the control area advisory board or, if board member districts have been established, it shall nominate at least one (1) person for election in each district. Within thirty (30) days of its selection, the nominating committee shall report its nominations to the division advisory committee. The division advisory committee shall call an election of members of the control area advisory board, to be held within forty (40) days from the date of the report. The call of the election shall state the time, the place within the control area, the purpose of the election, and the names of persons nominated for election. It shall be published for two (2) consecutive weeks at least twenty (20) days prior to the election in a newspaper of general circulation in each county in which a part of the control area or board member district lies. (c) Every person or corporation owning or, by virtue of public land filing, entitled to possession of land which is a part of the control area is entitled to cast for each member to be elected one (1) vote for each acre of such land as assessed upon the last annual assessment roll of the county in which the land is located, or as shown by the public land filing. A person owning a tract of land of less than one (1) acre is entitled to cast one (1) vote for each member to be elected. The grantee or assignee of the water in or under any described land is entitled to vote, as prescribed herein, in the place of the person or corporation owning or entitled to the possession of the land. However, if board member districts are established, only the votes which derive from within each district shall be cast in the election of the district board member. (d) At the hour and place of the election the division advisory committee shall call the roll of those entitled to vote, and the number of votes each is entitled to. They shall make a record of the qualified voters present, receive all proxies and prescribe the method of canvassing the votes. All proxies shall be in writing and signed by the person entitled to vote. The five (5) persons receiving the highest number of votes, or the person receiving the highest number of votes within each board member district, shall be declared to be elected, regardless of whether or not they have received a majority of votes cast. No election shall be invalid because a majority of the acreage of the control area or board member district was not represented at the election. Two (2) of the members so elected shall serve until one (1) year from the third Tuesday in July of the year following the election, and three (3) of the members so elected shall serve until two (2) years following such date. The division advisory committee shall decide by lot which members shall serve for these terms. (e) During the first fifteen (15) days of July next preceding the expiration of the term of any member an election shall be held to elect members of the control area advisory board. The control area advisory board shall call and conduct the election in the same manner prescribed for the first election. Members elected at any election after the first election shall serve for a term of four (4) years. Whenever the office of any member becomes vacant for any cause, a person to fill the vacancy of the unexpired term shall be appointed by the remaining members. The costs of elections shall be paid by the state engineer's office. (f) Each member of the control area advisory board shall receive the same per diem, mileage and expense allowances while attending and traveling to and from meetings of the board and other official business of the board in the same manner and amount as employees of the state. No person shall represent more than one (1) board member district during any term of office, and no person shall serve on a control area advisory board for more than two (2) consecutive terms.

Propose a change

41-3-914. Adjudication of waters within control area.

(a) After the boundaries of any control area have been determined by the board, the appropriate superintendent shall proceed with the adjudication of unadjudicated wells within the control area. After completing the adjudication, the superintendent shall hold evidence of the adjudication open for inspection by the public at a time and place to be fixed by the superintendent, and notice thereof shall be published in two (2) issues of a newspaper of general circulation in the county or counties where the control area is situated. (b) If any well owner, lessee or user within a control area refuses to adjudicate a well, or supply the necessary information to permit adjudication of any well, the superintendent may tag and lock the pump or well to prevent use of water therefrom. The penalty for interfering with the tag or lock on a well is as provided in W.S. 41-3-616. The use of water from a well so tagged and locked is prima facie evidence that the well owner, lessee or user has violated the provisions of this section. (c) The taking of proof, filing objections or contests, giving notices, conducting of hearings, making adjudications of water rights, determining of priorities as between appropriators, issuing of certificate of appropriation, and taking appeals shall, insofar as applicable, and not in conflict with the provisions of this act be governed by the provisions of W.S. 41-4-101 through 41-4-207 and 41-4-211 through 41-4-517. (d) At the first regular meeting of the board after completion of such proof and advertisement, the board shall cause to be entered in the records of its office an order showing the priorities of right to the use of water in the control area, the amount of appropriation of the parties claiming water therefrom, the character and kind of use for which the appropriation is made, and the places or points of use. The secretary of the board shall issue to each person represented in the determination, a certificate of appropriation signed by the president of the board and attested under seal of the secretary of the board which shall state the name and post-office address of the appropriator, the priority date of the appropriation, the amount of water appropriated, the use to which the water has been applied and, if the appropriation is for irrigation, a description of the legal subdivision of land to which the water is applied, or the place of use if the appropriation is not being used for irrigation. The certificate shall be transmitted by certified mail to the county clerk of the county in which the appropriation has been made and the county clerk shall, upon receipt of the proper fee, record the same and thereupon immediately transmit the certificate to the appropriator. At the time of the submission of final proof of appropriation before the state engineer or superintendent of a water division, a fee not to exceed one hundred dollars ($100.00) shall be collected, which shall be used for advertising the proof of appropriation and recording the certificate. The priority of appropriation shall be the determining factor in adjudicating underground water; the person first making the appropriation being first entitled to the use of the underground water, except as modified by W.S. 41-3-933.

Propose a change

41-3-915. Control areas; hearing to determine adequacy of

water for all appropriators; corrective controls generally; agreements in lieu of controls. (a) After designation of an area as a control area by the board, the state engineer may temporarily adopt any of the corrective controls provided for by this section, where it appears that immediate regulation is required. After the well adjudication procedure has been completed, the state engineer may, on his own motion, and shall on the petition of twenty (20) appropriators or of one-tenth of the appropriators of water from a control area, cause a hearing to be held before the state engineer and the control area advisory board to determine whether the underground water in the area is adequate for the needs of all appropriators of underground water in such area. Public notice of the time and place of the hearing shall be published once in a newspaper circulated in the area not more than thirty (30) days before the time set for the meeting. If the state engineer finds after the hearing, and after receiving the advice of the control area advisory board, that the underground water in the control area is insufficient for all of the appropriators, he may by order adopt one (1) or more of the following corrective controls: (i) He may close the controlled area to any further appropriation of underground water, in which event he shall thereafter refuse to grant any applications for a permit to appropriate underground water in that area, provided, that such area may be reopened to appropriations at any time the state engineer shall find on the basis of additional evidence that there is unappropriated water in the area, in which event the state engineer shall reconsider all applications for permits refused on the grounds of the order closing the area; (ii) He may determine the permissible total withdrawal of underground water in the control area for each day, month or year, and, insofar as may be reasonably done, he shall apportion such permissible total withdrawal among the appropriators holding valid rights to the underground water in the control area in accordance with the relative dates of priority of such rights; (iii) If he finds that withdrawals by junior appropriators have a material and adverse effect upon the supply available for and needed by senior appropriators, he may order such junior appropriators to cease or reduce withdrawals forthwith; (iv) If he finds that cessation or reduction of withdrawals by junior appropriators will not result in proportionate benefits to senior appropriators, he may require and specify a system of rotation of use of underground water in the controlled area; (v) He may institute well spacing requirements if permits are granted to develop new wells. (b) The state engineer shall cause a copy of any such order to be served upon each person affected thereby in the manner provided for service of process in civil actions. (c) Appropriators of underground water from a control area may agree to any method or scheme of control of withdrawals, well spacing, apportionment, rotation or proration of the common supply of underground water. The state engineer shall encourage and promote such agreements and supply the parties with information and advice. When the state engineer, with the advice of the control area advisory board, shall find that any such agreement, executed in writing and filed in his office, is consistent with the intent, purposes and requirements of this act, and would not be detrimental to the public interest or to the rights of other persons not parties to the agreement, he shall approve the agreement, and thereafter such agreement shall control, until terminated as hereinafter provided, in lieu of any order issued pursuant to subsection (a) of this section. (d) Any agreement approved by the state engineer may be terminated by the terms of the agreement, by the consent of the parties, or by order of the state engineer if he finds, after investigation and a public hearing before the control area advisory board, held at least two (2) weeks after one (1) published notice in a newspaper of general circulation in each county in which a part of the control area lies, that the agreement is not being substantially complied with by the parties, or that changed conditions have made the agreement inequitable, or that the continuance of the agreement is no longer consistent with the intent, purpose and requirements of this act, or is a detriment to the public interest or to the rights of other persons not parties to the agreement.

Propose a change

41-3-916. Priority of rights when 1 source of supply.

Where underground waters in different aquifers are so interconnected as to constitute in fact one source of supply, or where underground waters and the waters of surface streams are so interconnected as to constitute in fact one source of supply, priorities of rights to the use of all such interconnected waters shall be correlated and such single schedule of priorities shall relate to the whole common water supply. The state engineer may by order adopt any of the corrective controls specified in W.S. 41-3-915.

Propose a change

41-3-917. Change of location of well without loss of

priority; appeal from action of state board of control or state engineer. (a) An appropriator of underground water may change the location of his well to a point within the same aquifer in the vicinity of the original location, without loss of priority, by securing approval of the state board of control if the groundwater right has been adjudicated or if the groundwater right has not been adjudicated but the water has been applied to beneficial use. In cases involving domestic or stock water wells which are not adjudicated but the water has been applied to beneficial use, the state engineer may approve a change of location. If the right is not adjudicated and the water has not been applied to beneficial use, approval for the change in location may be granted by the state engineer. No petition shall be granted if the rights of other appropriators shall be injuriously affected thereby. No petition granted shall increase the total amount of the appropriation of water set forth in the original permit. The state board of control and the state engineer may make such regulations as may be necessary to carry out the provisions of this section. The state engineer may approve a change of well location even if water has not been applied to a beneficial use. (b) A decision by the state engineer granting or denying a petition to change the location of an unadjudicated right under this section may be appealed to the board of control. An appeal may be taken to the district court pursuant to W.S. 16-3-101 through 16-3-115 from an order of the board of control: (i) Affirming or reversing a decision of the state engineer appealed to the board under this subsection; or (ii) Granting or denying a petition to change the location of an adjudicated right under this section.

Propose a change

41-3-918. Appeals.

Any person aggrieved by an order of the board or of the state engineer concerning underground water, or by their or his failure to act, may appeal in the manner provided by W.S. 41-4-517, and the Wyoming Administrative Procedure Act.

Propose a change

41-3-919. Prohibited acts; penalty for violation.

Any person who withdraws underground water or who fails to stop or reduce the flow of underground water in violation of any order of the state engineer made pursuant to this act, or any person who does not have a permit, certificate or vested right to appropriate underground water who shall withdraw underground water from any well other than a well for stock or domestic purposes as defined in W.S. 41-3-907, is guilty of a misdemeanor and upon conviction shall be punished under W.S. 41-3-616.

Propose a change

41-3-930. Application; who required to file; filing;

contents; use of water from existing well; statement of claim. (a) Any person who intends to acquire the right to beneficial use of any underground water in the state of Wyoming, shall, before commencing construction of any well or other means of obtaining underground water or performing any work in connection with construction or proposed appropriation of underground water or any manner utilizing the water for beneficial purposes, file with the state engineer an application for a permit to make the appropriation and shall not proceed with any construction or work until a permit is granted by the state engineer, provided, that whenever a bore hole constructed for mineral exploration, oil and gas exploration, stratigraphic information or any other purpose not related to groundwater development shall be found to be suitable for the withdrawal of underground water, application shall be filed with and approved by the state engineer before water from the bore hole is beneficially utilized. The state engineer may authorize the construction and use of multiple wells for industrial purposes for in situ mining, dewatering or use for pollution control or remediation with a single permit if the groundwater to be developed by the proposed appropriation is to be used for a specific purpose within the department of environmental quality permitted boundary and served from a single source of supply. The application shall contain the name and post-office address of applicant or applicants, a detailed description of the proposed use, the location by legal subdivision of the proposed well or other means of obtaining underground water, the estimated depth of the proposed well, the quantity of water proposed to be withdrawn and beneficially utilized in gallons per minute and acre-feet per calendar year, the location by legal subdivision of the area or point of use shall be provided, and such other information as the state engineer may require. (b) In addition to providing the information required in subsection (a) of this section, applications for permits to appropriate groundwater, geothermal or otherwise, located within fifteen (15) miles of the boundary of Yellowstone National Park shall be accompanied by a written report prepared by a qualified professional and containing such geologic, hydrologic and other information necessary to show that the proposed development will not impair or produce an injurious effect on the hydrothermal system or hydrothermal features located within the boundaries of Yellowstone National Park. The state engineer shall consider all the information provided by the applicant and any other information available to him or necessary to make an informed decision before acting on the application. If upon review of the submitted information or other records available to him, the state engineer determines that the applicant has not shown that the proposed development will not impair or produce an injurious effect upon the hydrothermal features located within the boundaries of Yellowstone National Park, the state engineer shall deny the application for permit. Wells for domestic and stock purposes as defined in W.S. 41-3-907 will be exempt from the requirements of this section. (c) Nothing in this section shall be construed so as to interfere with the right of any person to use water from any existing well constructed prior to May 24, 1969 where the water is economically and beneficially used for stock or domestic use as provided by W.S. 41-3-907, and the uses from the well are hereby declared to constitute a vested right, provided, that the owner of the water right must have registered the right prior to December 31, 1972. If the water right was not registered prior to December 31, 1972 an application shall be filed in accordance with the provisions of this section to obtain a water right and the applicant shall receive, as the water right priority date, the date the application is received by the state engineer.

Propose a change

41-3-931. Application; when granted generally; denial

subject to review; defects and corrections generally; cancellation. An application for a permit for a well in any areas not designated as a critical area shall be granted as a matter of course, if the proposed use is beneficial and, if the state engineer finds that the proposed means of diversion and construction are adequate. If the state engineer finds that to grant the application as a matter of course, would not be in public's water interest, then he may deny the application subject to review at the next meeting of the state board of control. If the state engineer shall find that the proposed means of diversion or construction are inadequate, or if the application is otherwise defective, he may return the application for correction. If such correction is not made within ninety (90) days, the state engineer may cancel the application.

Propose a change

41-3-932. Public notice of application or petition;

hearing before state engineer and control area advisory board; cost. (a) Upon the filing of a petition to amend an existing water right or an application to appropriate underground water for any use other than domestic, stockwatering or miscellaneous purposes where the quantity of water to be appropriated is twenty-five (25) gallons of water per minute or less, from an area designated as a control area by the state board of control, the state engineer shall cause to be published, at applicant's expense, in a newspaper of general circulation in the county wherein the proposed well or requested change will be located, for at least once a week for three (3) consecutive weeks, a notice of the filing of the application or requested changes and that objections to the granting thereof may be filed within ten (10) days after the last publication of the notice, on the grounds that there is no unappropriated water in the proposed source of supply or that the granting of the application would be detrimental to the public interest. If objections are filed within the time specified in the notice, the state engineer shall set a date for a hearing on the application or requested changes and the objections thereto and shall notify the applicant or petitioner and the objectors thereof. If the applicant or petitioner questions the standing of the objector, the state engineer shall make written findings of fact on the issue and may overrule the objection on that basis. The hearing shall be before the control area advisory board and the state engineer, and shall be held in an appropriate place within the county in which the proposed well or requested change is to be located. The state engineer, for good cause, may impose costs of the hearing proportionally upon the applicant or petitioner and the objectors. The hearing under this subsection shall be a contested case hearing conducted in conformance with and subject to the provisions of the Wyoming Administrative Procedure Act. A decision by the state engineer granting or denying an application or petition under this subsection may be appealed to the board of control within thirty (30) days of the date of receipt of notice of the decision. Upon appeal and based on the contested case record and upon additional evidence, if any, taken at the direction of the board, the board may affirm, modify or reverse the findings of the state engineer. An appeal from an order of the board of control may be taken to the district court pursuant to the Wyoming Administrative Procedure Act. (b) If no objections are filed against the application or petition under subsection (a) of this section but the state engineer is of the opinion that the application or petition may be detrimental to the public interest, or desires to obtain the recommendations of the control area advisory board, he shall set a date for a public hearing on the application or petition and shall notify the applicant or petitioner of the time and place thereof. Not less than fifteen (15) days prior to the hearing the state engineer shall cause notice of the hearing to be published, at the expense of the applicant or petitioner, in at least one (1) newspaper having general circulation in the county in which the proposed well or requested change is to be located. The state engineer shall notify the applicant or petitioner of the time and place of the hearing. The public hearing shall be held before the control area advisory board and the state engineer in an appropriate place in the county in which the proposed well or requested change is to be located. In making any determination required by this section, the state engineer may rely upon records and information on file in his office or in the office of the board of control. In the event a hearing is held he shall make known the records and information upon which he relies at least fifteen (15) days before the hearing. A decision by the state engineer under this subsection may be appealed by the applicant or petitioner to the board of control within thirty (30) days of the date of receipt of notice of the decision. Upon appeal the board of control shall conduct a contested case hearing in accordance with its rules and regulations and the Wyoming Administrative Procedure Act. An appeal from an order of the board of control may be taken to the district court pursuant to the Wyoming Administrative Procedure Act. (c) The application or petition shall be granted and the permit issued only if the state engineer finds, after receiving the advice of the control area advisory board, that there are unappropriated waters in the proposed source, that the proposed means of diversion or construction is adequate, that the location of the proposed well or other work does not conflict with any well spacing or well distribution regulation and that the proposed use would not be detrimental to the public interest. In any contested case hearing conducted under this section, the applicant or petitioner shall bear the burden of proof. If the state engineer finds that the application or petition is incomplete or otherwise defective, he shall return the application or petition for correction. If the correction is not made within ninety (90) days, the application or petition shall be rejected. (d) Repealed By Laws 2014, Ch. 90, § 2. (e) A petition to amend an existing water right which originated with the board of control may be subject to additional action by the board of control. Any petition to amend an existing water right granted by the state engineer pursuant to this section, if that decision is not appealed, shall be returned to the board of control for any additional action that may be required by law.

Propose a change

41-3-933. Express conditions limiting rights of appropriator; additional conditions.

It is an express condition of each underground water permit that the right of the appropriator does not include the right to have the water level or artesian pressure at the appropriator's point of diversion maintained at any level or pressure higher than that required for maximum beneficial use of the water in the source of supply. The state engineer may issue any permits subject to such conditions as he may find to be in the public interest.

Propose a change

41-3-934. Time limits to complete construction; extensions; cancellation generally.

If the permit is granted, the applicant shall complete the construction and apply the water to beneficial use before the date specified in the conditions of approval, which shall not be more than three (3) years after the date of approval. The state engineer may extend the period or cancel the permit in accordance with the procedures set forth in W.S. 41-4-506.

Propose a change

41-3-935. Adjudication procedure.

(a) Any person constructing any well under a permit shall, within thirty (30) days after the completion or abandonment of such work, report to the state engineer the data required relating to such well, on forms furnished by the state engineer. A well shall be considered complete when it is possible to install a pump and pump water. In the case of an artesian well, completion is the time when the drill rig is moved off of the drilling site. (b) Adjudication of all ground water rights except stock watering and domestic uses of ground water referenced in W.S. 41-3-907 shall proceed upon completion of the work according to the terms of the permit and the recording on forms furnished by the state engineer of such information as is deemed necessary concerning the works, and the filing of a map signed by a Wyoming licensed professional engineer or land surveyor, showing the location of the well and the point or points of use. The state engineer or his authorized representative shall inspect the works, the lands irrigated or other uses being made of the water upon receipt of the map. The adjudication of stock watering and domestic uses of ground water referenced in W.S. 41-3-907 may be initiated by the state engineer or the appropriator of record and will not require the filing of a map signed by a Wyoming licensed professional engineer or land surveyor, showing the location of the well and the points and areas of use or require the inspection by the state engineer or his authorized representative of the works, the lands irrigated or other uses being made of the water unless, in the discretion of the state engineer, such procedures are deemed necessary and appropriate. At this time the board may consider for adjudication the ground water rights upon proof of beneficial use being submitted by the appropriator. (c) Adjudication shall proceed in the same manner prescribed for the adjudication of surface water appropriations once the state engineer or his authorized representative has reported his findings to the board. A ground water appropriation attaches to the land for irrigation, or for such other purposes or object for which it was acquired. (d) In the interest of an orderly adjudication procedure for ground water, the state engineer, with the concurrence of the board, may order adjudication of any ground water appropriations in the state. Upon one (1) year notice, any appropriator whose appropriation is to be adjudicated shall furnish the state engineer all of the documents mentioned in subsection (b) of this section. If any appropriator refuses to supply any of this information, the superintendent may tag and lock the well. Any appropriator that interferes with the tag or lock is subject to the same penalty as provided in W.S. 41-3-938. Use of water well so tagged or locked is prima facie evidence of such interference.

Propose a change

41-3-936. Priority of appropriation.

The priority of appropriation of underground water obtained prior to April 1, 1947, shall date from time of completion of the well. The priority of appropriation of underground water obtained subsequent to April 1, 1947, and prior to March 1, 1958, shall date from the filing of registration in the state engineer's office. The priority of appropriation of underground water obtained on or subsequent to March 1, 1958, shall date from the filing of the application for permit in the state engineer's office. Priority of appropriation of underground water for stock or domestic purposes, as defined in W.S. 41-3-907, shall date from the time of completion of the well if properly registered with the state engineer prior to December 31, 1972. If registered with the state engineer subsequent to December 31, 1972, the priority shall date from the filing or registration in the state engineer's office.

Propose a change

41-3-937. Cancellation or suspension of permits or certificates.

Whenever, after notice to and opportunity to be heard, the state engineer finds that the holder of any permit is willfully violating or has willfully violated any provision of such permit or any provision of this act or of any order issued pursuant to this act, the state engineer may cancel or suspend such permit or impose conditions on the future use thereof to prevent such violation, pursuant to W.S. 41-3-616(c). Whenever, after notice to and opportunity to be heard, the board of control finds that the holder of any certificate of registration or certificate of appropriation is willfully violating or has willfully violated any provision of such certificate or any provision of this act or of any order issued pursuant to this act, the board of control may cancel or suspend such certificate or impose conditions on the future use thereof to prevent such violation, pursuant to W.S. 41-3-616(d).

Propose a change

41-3-938. Penalty.

Any person who drills, digs or constructs any works for the securing of underground water without having obtained a permit is guilty of a misdemeanor and upon conviction shall be punished under W.S. 41-3-616.

Propose a change

41-3-939. Groundwater study to assess corrective controls within groundwater control areas.

Subject to available funding, not less than once every ten (10) years the state engineer shall conduct a groundwater study in each county that has a control area designated by the board of control under W.S. 41-3-912 and where the state engineer has ordered one (1) or more corrective controls under W.S. 41-3-915. The study under this section shall assess the effect of the ordered corrective controls, assess recharge of the aquifer compared to water consumption from that aquifer and assess the impact of future development on the aquifer. The study under this section may include mapping, modeling and the drilling of monitoring wells. The state engineer may conduct a study under this section in counties without a control area if deemed necessary by the state engineer. The results of each study conducted under this section shall be made public by the state engineer and shall be reported to the joint agriculture, state and public lands and water resources interim committee not later than sixty (60) days after the study is completed.

Propose a change

41-3-1001. Waters stored for instream flows a beneficial

use of water; natural stream flows allowed for instream flows. (a) The storage of water in any drainage in Wyoming for the purpose of providing a recreational pool or the release of water for instream flows to establish or maintain new or existing fisheries is a beneficial use of water subject to normal stream loss. (b) Unappropriated water flowing in any stream or drainage in Wyoming may be appropriated for instream flows to maintain or improve existing fisheries and declared a beneficial use of water on a case by case basis by the state engineer if such use does not impair or diminish the rights of any other appropriator in Wyoming. (c) Waters used for the purpose of providing instream flows under subsection (a) of this section shall be the minimum flow necessary to establish or maintain fisheries. (d) Waters used for the purpose of providing instream flows under subsection (b) of this section shall be the minimum flow necessary to maintain or improve existing fisheries.

Propose a change

41-3-1002. Instream flows to be by stream segment; waters

for instream flows may be sold, transferred or otherwise conveyed under certain restrictions; ownership restricted. (a) All waters used for the purpose of providing instream flows shall be applied only to that segment of the stream for which they are granted. The stream segment and the determination of a minimum amount of water required for instream flow purposes shall be defined specifically. (b) After waters allowed for instream flows have passed through the specific stream segment, all rights to those instream flow waters are relinquished, and the water shall be available for reappropriation, diversion and beneficial use. (c) Storage water appropriated for the purpose of providing instream flows in specified stream segments or existing water rights which are converted to instream flow under provisions of W.S. 41-3-1007 of this act may later be sold, transferred or otherwise conveyed to any other purpose pursuant to the requirements of W.S. 41-3-104, except that the board of control shall require that an advertised public hearing be held. (d) Any person may divert and appropriate, as provided by law, instream flow waters for any beneficial use other than for instream flows at the following places: (i) Within one (1) mile upstream from any point where the instream flows cross the Wyoming state line; (ii) Within one (1) mile upstream from any point where the instream flows enter the main stem of the North Platte River; (iii) Within one (1) mile upstream from any point where the instream flows enter the Big Horn Lake; (iv) Within one (1) mile upstream from any point where the instream flows enter the Flaming Gorge Reservoir; (v) Within one (1) mile upstream from any point where the instream flows enter the Palisades Reservoir. (e) No person other than the state of Wyoming shall own any instream flow water right.

Propose a change

41-3-1003. Game and fish commission; construction of

measuring devices; recommendations; permits; fees and costs. (a) The game and fish commission shall construct any measuring device the state engineer considers necessary for the administration of an instream flow right. (b) The state game and fish commission may report to the water development commission annually those specific segments of stream which the game and fish commission considers to have the most critical need for instream flows. The game and fish commission shall identify the points on the stream at which the need for instream flows begins and ends, the time of year when the flows are most critical and a detailed description of the minimum amount of water necessary to provide adequate instream flows. (c) The water development commission shall file applications in the name of the state of Wyoming for permits to appropriate water for instream flows in those segments of stream recommended by the game and fish commission. The state engineer shall not grant any permits to appropriate or store water for instream flows prior to the completion of the study provided by W.S. 41-3-1004 or prior to the hearing required by W.S. 41-3-1006. Fees and costs of the commission associated with permit applications and adjudication of water rights shall be borne by the game and fish commission.

Propose a change

41-3-1004. Water development commission to determine

storage feasibility; report to the game and fish commission and the legislature. (a) Immediately after permits have been applied for under W.S. 41-3-1003(c), the water development commission shall determine the feasibility of providing instream flows for the recommended segments of streams from unappropriated direct flows or from existing storage facilities or from new facilities. The feasibility study shall include a determination of water necessary to maintain or improve existing fisheries for water rights under W.S. 41-3-1001(b) or of water necessary to provide fisheries for water rights under W.S. 41-3-1001(a). The feasibility study shall also include the availability of storage sites, the estimated cost of providing any required storage and such other findings and conclusions as the water development commission deems appropriate. The cost of any consultant and any associated costs that the water development commission determines are necessary to complete a feasibility study under this section shall be borne by the game and fish commission. The water development commission shall consult with the game and fish commission prior to entering into any contract related to a feasibility study under this section. (b) The water development commission shall make a report to the game and fish commission and the legislature outlining their findings. (c) Repealed by Laws 1987, ch. 50, § 2.

Propose a change

41-3-1005. Approval of storage project.

If the water development commission determines that storage of water to provide instream flows is feasible and in the interest of the state of Wyoming, it shall request authority from the legislature to proceed with the design and construction of storage facilities and the storage of sufficient water for such purposes. The costs of the project may be shared with other water users benefiting therefrom, or paid solely from funds appropriated from the water development account, or otherwise as the legislature directs.

Propose a change

41-3-1006. Appropriation of unappropriated waters for direct instream flows.

(a) Any application for a permit to appropriate direct flow waters for the purpose of providing instream flows shall be by stream segment, as defined in W.S. 41-3-1002. (b) If the water development commission, under W.S. 41-3-1004, determines that storage of water for the purpose of providing instream flows is not feasible but that appropriation of direct flow water appears feasible, the state engineer shall act on applications for permits to appropriate water filed under W.S. 41-3-1003(c) in the name of the state of Wyoming. (c) Subsequent to submission of an application for an instream flow appropriation, the game and fish commission shall conduct relevant studies on the proposal. (d) The applicant for an instream flow water right shall publish a notice of the application and hearing in a newspaper of general circulation in the area near the proposed reservoir site or stream segment, once each week for at least two (2) consecutive weeks prior to the hearing provided by subsection (e) of this section which notice shall briefly describe the application. (e) Prior to granting or denying the application, the state engineer shall conduct any studies as are deemed necessary to evaluate the proposed instream flow and the necessary amount of water to maintain existing fisheries and shall hold a public hearing. At the public hearing, the game and fish commission shall present its studies and any other interested parties shall present views on the proposed instream flow appropriation. The state engineer may place a condition on the permit, if one is granted, requiring a review of the continuation of the permit as an instream flow appropriation. (f) If an application for an instream flow appropriation is approved by the state engineer, it shall be deemed that work has been commenced and completed and beneficial use made thirty (30) days after the date of approval for purposes of W.S. 41-4-506 and proof of appropriation shall not be submitted until three (3) years thereafter. (g) The state engineer shall not issue an instream flow permit where the instream flow right would be included as a portion of the consumptive share of water allocated to the state of Wyoming under any interstate compact or United States supreme court decree. (h) The amount of water appropriated for instream flow in each river basin in Wyoming shall not result in more water leaving the state than the amount of water that is allocated by interstate compact or United States supreme court decree for downstream uses outside of Wyoming.

Propose a change

← Find another law