All property of whatever kind and nature owned by the state and by towns, cities, school districts, drainage districts, irrigation districts, park districts, water districts, or any other governmental agency or agencies within the said district, shall be exempt from assessment and levy by the board as provided in this act for the purposes herein contained.
If the taxes and/or assessments levied are not paid as herein provided, then the real property shall be sold at the regular tax sale for the payment of such taxes and assessments, interest and penalties, in the manner provided by the statutes of the state of Wyoming for selling property for nonpayment of general taxes. If there are no bids at said tax sale for the property so offered under class A and class B, said property shall be struck off to the county, and the county shall account to the district in the same manner as provided by law for accounting for school, town and city taxes. And if there are no bids for the property so offered under class C and class D, said property shall be struck off to the district and the tax certificate shall be issued in the name of the district and the board shall have the same power with reference to sale of said tax certificate, as now vested in county commissioners and county treasurer when property is struck off to the counties.
41-3-801. Petition for establishment; notice of election; qualifications of voters; conduct of election.
A flood control district may be established under the procedures for petitioning, hearing and election of special districts, and subsequent elections shall be held, as set forth in the Special District Elections Act of 1994. The petition and notice of publication shall describe by metes and bounds, following as nearly as possible established school district boundaries, the lands to be included in said district.
41-3-802. Election of board of directors; number; term;
quorum; bond; powers and duties generally; election of officers.
(a) If the formation of the district is approved the board of county commissioners shall enter a finding to that effect upon its records after which the district shall be considered to be established and shall be empowered through its governing board of directors to acquire personal property and equipment for control purposes by gift, devise, bequest, donation, or purchase and to enter into contracts for the acquisition by purchase or lease, or otherwise, of personal property and equipment; to convey, lease and otherwise dispose of its property for flood control purposes and to establish sinking funds for the replacement of worn out or obsolete equipment; and upon the vote of a majority of the voters of the district voting at an election held as provided by W.S. 22-21-101 through 22-21-112, the district shall be empowered to issue bonds for the purpose of purchasing equipment and supplies and for the operational expense of the district.
(b) A district established under this act shall acquire and hold property in the name of ".... Flood Control District of .... County", state of Wyoming, and the name and a record thereof shall be entered upon the board of county commissioners' records of said county of the establishment of said district, such name to be selected by the board of directors of the district, and said district as established shall have power to sue and be sued by such name.
(c) The election of officers shall be held at the same time as the election for formation of the district. At the election a board of six (6) directors shall be elected by written ballot, who shall serve without compensation to govern the affairs of the district until the first subsequent director election pursuant to W.S. 22-29-112. At that election two (2) members of the board shall be elected for one (1) year, two (2) for two (2) years, and two (2) for three (3) years, so that each succeeding year the term of two (2) members will expire and two (2) members will be elected for a three (3) year term. Each year the board shall elect one (1) of its members secretary-treasurer. Before the secretary-treasurer enters on the discharge of his duties, he shall execute to the state of Wyoming, a bond with an approved corporate surety or three (3) or more sufficient sureties, to be approved by the district board of directors and in such penal sum as they may direct, which bond with the approval of the board endorsed thereon by their president, shall be filed in the office of the county clerk. It is further directed that four (4) members of this board shall constitute a quorum and that no business shall transpire without a quorum in attendance. Any expenditure of funds shall be made only by signed vouchers bearing the signatures of both president and secretary-treasurer.
(d) At least thirty (30) days prior to the time for annual levy of general taxes by the board of county commissioners of the county wherein any such district is situated, the board of directors of such district shall certify to the board of county commissioners the amount of special mill levy, provided for in W.S. 41-3-803, which said district board considers necessary for district operations during the following year.
41-3-803. Special tax authorized; power of board to enter
into cooperative agreements; authority to make rules and hire employees.
(a) The board of county commissioners of the county wherein each district is situated shall, at the time of the annual levy of general taxes, levy an additional special tax upon the real property in the amount certified to it by the district board of directors under W.S. 41-3-802, but not to exceed twelve (12) mills on each dollar of assessed valuation on all real property in the respective districts for the equipping and operational expenses of such district and for the payment of the bonded indebtedness of the same. The district board may receive voluntary donations and appropriations of money from any other source, and such donation hereinafter provided, by the county treasurer upon request of the district board. Nothing in this act shall be construed to prohibit boards of county commissioners from appropriating funds, paying any money or cooperating with any district so established under this act for the purpose of controlling or eradicating floods and all aforementioned moneys shall be turned over to the county treasurer to be kept in a fund designated as ".... Flood Control District of .... County Fund". Authority for such appropriations, payments or cooperation by boards of county commissioners is hereby authorized.
(b) Districts created under this act are authorized to enter into cooperative agreements with any federal, state, local, or private agency for the control and eradication of floods on highways, rights-of-way, rivers, streams, canals or ditches. Flood control district boards are hereby authorized and empowered to make and adopt rules and regulations necessary for carrying out the purposes and provisions of this act and to enforce such rules and regulations and shall file those rules with the county clerk for each county in which the district is located. The boards are hereby empowered to appoint employees and assistants as may be necessary and to fix their compensation.
(a) As used in this act, unless the context plainly otherwise requires:
(i) "Person" means a natural person, partnership, association, corporation, municipality, irrigation district, the state of Wyoming, any agency or political subdivision thereof, and the United States or any agency thereof;
(ii) "Underground water" means any water, including hot water and geothermal steam, under the surface of the land or the bed of any stream, lake, reservoir, or other body of surface water, including water that has been exposed to the surface by an excavation such as a pit;
(iii) "Aquifer" means any underground geological structure or formation having boundaries that may be ascertained or reasonably inferred, in which water stands, flows or percolates;
(iv) "Well" means any artificial opening or excavation in the ground, however made, by which underground water is sought or through which it flows under natural pressure or is artificially withdrawn, and a series of wells developed as a unit and pumped collectively by a single pumping unit shall be considered as one (1) well;
(v) "Construction" of a well includes boring, drilling, jetting, digging or excavating, and installing casing, pump and other devices for withdrawing or facilitating the withdrawal of underground water, or measuring the depth to the water table or the flow of the well;
(vi) "Pollution" of underground water means any impairment of the natural quality of such water, however caused, including impairment by salines, minerals, industrial wastes, domestic wastes or sewage, whether indrafted directly or through infiltration into the underground water supply;
(vii) "Additional supply" means underground water for irrigation use which is appurtenant to lands that have a direct flow supply of surface water or have an original supply from another underground water source. The limit of use of additional supply is beneficial use;
(viii) "Hydrothermal system" means a groundwater system, including cold water recharge and transmission and warm and hot water discharge;
(ix) "Hydrothermal feature" means a surface manifestation of a hydrothermal system, including, but not limited to, hot springs, geysers, mud pots and fumaroles.
41-3-902. Spring waters; perfection of right to use; limitation.
All springs and spring waters where the yield does not exceed twenty-five (25) gallons per minute and where the use is for domestic or stock purposes only, shall be considered as groundwater. Perfection of the right to use spring water up to twenty-five (25) gallons per minute for domestic or stock use shall be made in accordance with the laws pertaining to groundwater.
By-product water is water which has not been put to prior beneficial use, and which is a by-product of some nonwater-related economic activity and has been developed only as a result of such activity. By-product water includes, but is not limited to, water resulting from the operation of oil well separator systems or mining activities such as dewatering of mines.
41-3-904. By-product water; appropriation; conditions and limitation.
(a) Any person intending to appropriate by-product water for beneficial use shall file an application with the state engineer on the forms and in the manner prescribed for groundwater applications. By-product water shall be considered as being in the same class as groundwater for the purposes of administration and control. An application may be filed only if both the following conditions exist:
(i) The by-product water is intercepted while it is readily identifiable and before it has commingled with the waters of any live stream, lake, reservoir or other surface watercourse, or part of any groundwater aquifer; and
(ii) The developer of the water is the applicant, or an agreement is filed in the office of the state engineer wherein the developer of the water gives the applicant permission to use the water as proposed in the application. The agreement must be signed by the developer of the water, and may contain provisions for reservation of the water to the use of the developer-grantor, and if so stipulated, the reservation can be superior in right and title to any use by the applicant-grantee.
(b) In all other cases, an application to appropriate by-product water shall be governed by the laws pertaining to surface water, and by-product water shall be considered as part of the surface supply, subject to use by existing priority rights.
41-3-905. Application; generally; registration of vested
rights; permit to construct well; registration of formerly exempted wells. Nothing herein contained shall be construed so as to interfere with the right of any person to use water from any existing well where such water is economically and beneficially used for irrigation or for municipal, railway, industrial or other beneficial use, to the extent only that such continued right does not injuriously affect existing adjudicated surface rights not heretofore abandoned, and such use is hereby declared to constitute a vested right, provided, that the owner of any such right acquired before April 1, 1947, must have filed with the state engineer the statement required by W.S. 41-3-901 through 41-3-938, on or before December 31, 1957, and the owner of any right acquired on or after April 1, 1947, must have registered his well with the state engineer as required by W.S. 41-3-901 through 41-3-938, prior to the effective date of this act, and provided further, that the right to take underground water from any well exempted from the provisions of W.S. 41-3-901 through 41-3-938, that is not exempted from the provisions of this act, and that shall be registered with the state engineer prior to the effective date of this act, shall also constitute a vested right in the use of water with priority as of the time of completion of the well. No well shall be constructed after the effective date of this act unless a permit has been obtained from the state engineer. All existing stock and domestic wells formerly exempted may be registered with the state engineer prior to December 31, 1972. The state engineer shall make appropriate forms for such registration available with each county clerk and at such other places as he deems feasible.
41-3-906. Application; rights subject to preferences; rights of municipal corporations.
Rights to underground water shall be subject to the same preferences as provided by law for surface waters, and rights not preferred may be condemned and changed to a preferred use in the manner provided by law for surface waters. Nothing herein contained shall be construed to impair the rights of municipal corporations to acquire any underground water or underground water rights for a necessary public purpose by eminent domain or condemnation proceedings.
41-3-907. Application; preferred right of appropriations for stock or domestic use.
Appropriations of underground water for stock or domestic use, the latter being defined as household use and the watering of lawns and gardens for noncommercial family use where the area to be irrigated does not exceed one (1) acre, where the yield or flow does not exceed .056 cubic feet per second or twenty-five (25) gallons per minute, shall have a preferred right over rights for all other uses, regardless of their dates of priority, subject to the provisions of W.S. 41-3-911, as amended, if an appropriation is for two (2) or more uses, and includes one (1) of the above preferred uses, the preferred use shall be limited to .056 cubic feet per second or twenty-five (25) gallons per minute, and the application shall specify one (1) acre upon which such preferred uses shall be made. Such preferred use shall not include municipal use by any person of water appropriated by a municipality or company, or any instance where water is purchased or held out for sale.
(a) In each of the water divisions of the state, as defined in W.S. 41-3-501, there shall be established a division advisory committee on underground water. Each committee shall consist of three (3) persons, appointed by the governor, who shall in making such appointments, select persons who, in his opinion, will adequately represent the landowners and water users of the division, the geographical areas of the division and the public interest. The first committee in each division shall consist of one (1) member appointed for a term of two (2) years, one (1) member appointed for a term of four (4) years, and one (1) member appointed for a term of six (6) years. Their successors shall each be appointed for a term of six (6) years. The governor may remove any member of any advisory committee as provided in W.S. 9-1-202.
(b) The duties of the division advisory committee on underground water are:
(i) To call and supervise the election of the members of control area advisory boards;
(ii) To assist and advise the state engineer and the board regarding policies that affect the underground water of this state, such assistance and advice to consider both the interests of underground water users and the interests of the general public;
(iii) To provide advice and assistance to the state engineer and superintendents in arriving at solutions to underground water problems as they arise within the water division;
(iv) To provide advice and assistance to control area advisory boards, particularly in the development of control measures which are recommended to the state engineer for adoption;
(v) To provide underground water users within the division with information relative to the policies and procedures of the state engineer and board which affect the use of underground water.
(c) The members of each of the division advisory committees shall receive the same per diem, mileage and expense allowances while attending and traveling to and from control area board meetings and other official business of the committee in the same manner and amount as employees of the state.
(a) In the administration and enforcement of this act and in the effectuation of the policy of the state to conserve its underground water resources, the state engineer is authorized and empowered on advice and consent of the board of control:
(i) To prescribe such rules and regulations as may be necessary or desirable to enable him to efficiently administer this act;
(ii) To require such reports from well drillers as may be necessary or desirable;
(iii) To require such annual reports from underground water users as may be necessary or desirable;
(iv) To make such investigations as may be necessary or desirable, and to cooperate in such investigations with agencies of the United States, agencies of this state or any other state, political subdivision of this state, any public or private corporation, or any association or individual;
(v) To make regulations concerning the spacing, distribution and location of wells in critical areas;
(vi) To establish standards for the construction of wells, to work with the division advisory board, governmental subdivisions, and water user organizations to encourage the adoption of local standards of beneficial use and methods of conveyance and application of water designed to conserve and prevent waste of supplies;
(vii) To require, whenever practical, all flowing wells to be so capped or equipped that the flow of water can be stopped when the wells are not in use, and to require both flowing and nonflowing wells to be so constructed and maintained as to prevent the waste of underground water either above or below the land surface;
(viii) To require the abatement of any condition, or the sealing of any well, responsible for the admission of polluting materials into an underground water supply;
(ix) To delegate any of the duties and powers imposed or granted by this act, to the deputy state engineer or to an assistant state engineer, or other qualified member of his staff;
(x) To bring suit to enjoin the construction of illegal wells or the withdrawal or use of water therefrom, or to enforce any of the provisions of this act or of orders issued thereunder, and to intervene in any action or proceeding when it appears that the determination of such action or proceeding may result in the depletion of underground water resources of the state contrary to the policy expressed in this act.
41-3-910. State engineer; power to determine area and boundaries of districts.
The state engineer is authorized and directed to determine the area and boundaries of districts overlying the various aquifers yielding underground waters in this state and to assign to each district a distinctive name or number. He may establish subdistricts when parts of an aquifer require or may require separate regulations from the rest. He may alter the boundaries of such districts and subdistricts at any time. He may establish different districts for different aquifers that overlie each other in whole or in part.
41-3-911. Authority to order interfering appropriator to
cease withdrawals of water; hearing complaints by appropriators.
(a) Whenever a well withdrawing water for beneficial purposes shall interfere unreasonably with an adequate well developed solely for domestic or stock uses as defined in W.S. 41-3-907, whether in a control area or not, the state engineer may, on complaint of the operator of the stock or domestic well, order the interfering appropriator to cease or reduce withdrawals of underground water, unless such appropriator shall furnish at his own expense, sufficient water at the former place of use to meet the need for domestic or stock use. In case of interference between two (2) wells utilizing water for stock or domestic use as defined in W.S. 41-3-907, the appropriation with the earliest priority shall have the better right.
(b) Any appropriator of either surface or underground water may file a written complaint alleging interference with his water right by a junior right. Complaints are to be filed with the state engineer and are to be accompanied by a fee of one hundred dollars ($100.00) to help defray costs of investigation. This section is not applicable to interference between two (2) surface water rights. Upon receiving the complaint and fee, the state engineer shall undertake an investigation to determine if the alleged interference does exist. Following the investigation, the state engineer shall issue a report to all interested parties stating his findings. The report may suggest various means of stopping, rectifying or ameliorating the interference or damage caused thereby.
(c) Any interested appropriator who is dissatisfied with the results of the foregoing procedure may proceed under the applicable provisions of the Wyoming Administrative Procedure Act. If a hearing is to be held, it shall be held before the appropriate water division superintendent. The superintendent shall report to the board of control at its next meeting. The board shall issue its order to include findings of fact and conclusions of law.
designation; redesignation; duty of state engineer; hearings.
(a) "Control area" means any underground water district or subdistrict that has been so designated by the board of control. The board of control may designate a control area for the following reasons:
(i) The use of underground water is approaching a use equal to the current recharge rate;
(ii) Ground water levels are declining or have declined excessively;
(iii) Conflicts between users are occurring or are foreseeable;
(iv) The waste of water is occurring or may occur; or
(v) Other conditions exist or may arise that require regulation for the protection of the public interest.
(b) Whenever the engineer has information leading him to believe that any underground water district or subdistrict should become a control area, he shall immediately report in writing to the board of control all information known by him with reference to said area.
(c) The board of control shall fix a time and place to consider the information supplied by the state engineer and hear any other evidence presented at the time of the hearing. At the conclusion of the hearing, the board of control shall issue an order declaring that the area in question is or is not to be a control area. If the board determines that a control area needs to be created, it shall define the area geographically and stratigraphically. The board of control may designate five (5) board member districts for the purpose of the election of the control area advisory board.
(d) On the petition of five (5) persons owning or entitled by public land filing to the possession of land within the control area, or upon the recommendation of the state engineer, the board of control may consider the redesignation of the geographic or stratigraphic boundaries of a control area. If redesignation is considered, the board shall fix a time and place to hear the information supplied by the petitioners, the state engineer or other interested persons. Within ninety (90) days of the hearing, the board shall issue its order. If a control area is redesignated geographically, the board shall determine whether to divide the area into board member districts pursuant to subsection (c) of this section.
(e) On the petition of five (5) persons owning or entitled by public land filing to the possession of land within the control area, the control area advisory board shall consider the designation or redesignation of board member districts. If the control area advisory board determines that board member districts should be designated or redesignated, it shall submit its recommendation to the board of control for approval.
(f) The action of the board of control in denying at any time a petition or recommendation for redesignation is final and not subject to review.
(g) Whenever a control area has been designated or redesignated the state engineer may, without hearings or other proceedings, refuse to grant permits for the drilling of any wells within the control area.
41-3-913. Control areas; election of control area advisory board; mileage and expense allowances.
(a) When an underground water district or subdistrict is declared to be a control area, when the board of control geographically redesignates a control area or when the board of control approves the recommendation of a control area advisory board that board member districts be designated or redesignated, a control area advisory board shall be created in the manner provided herein. The control area advisory board shall consist of five (5) adults who own land or underground water rights, or who are the officers, officials or members of the board of a corporation which owns land or underground water rights within the control area. The board shall represent the entire control area.
(b) The state engineer shall notify the division advisory committee of the division in which the control area is located, of the designation or redesignation of the control area. Within twenty (20) days of notification, the division advisory committee shall select a nominating committee of not less than three (3) persons entitled to vote in the election of the control area advisory board. The nominating committee shall nominate not less than five (5) persons for election to the control area advisory board or, if board member districts have been established, it shall nominate at least one (1) person for election in each district. Within thirty (30) days of its selection, the nominating committee shall report its nominations to the division advisory committee. The division advisory committee shall call an election of members of the control area advisory board, to be held within forty (40) days from the date of the report. The call of the election shall state the time, the place within the control area, the purpose of the election, and the names of persons nominated for election. It shall be published for two (2) consecutive weeks at least twenty (20) days prior to the election in a newspaper of general circulation in each county in which a part of the control area or board member district lies.
(c) Every person or corporation owning or, by virtue of public land filing, entitled to possession of land which is a part of the control area is entitled to cast for each member to be elected one (1) vote for each acre of such land as assessed upon the last annual assessment roll of the county in which the land is located, or as shown by the public land filing. A person owning a tract of land of less than one (1) acre is entitled to cast one (1) vote for each member to be elected. The grantee or assignee of the water in or under any described land is entitled to vote, as prescribed herein, in the place of the person or corporation owning or entitled to the possession of the land. However, if board member districts are established, only the votes which derive from within each district shall be cast in the election of the district board member.
(d) At the hour and place of the election the division advisory committee shall call the roll of those entitled to vote, and the number of votes each is entitled to. They shall make a record of the qualified voters present, receive all proxies and prescribe the method of canvassing the votes. All proxies shall be in writing and signed by the person entitled to vote. The five (5) persons receiving the highest number of votes, or the person receiving the highest number of votes within each board member district, shall be declared to be elected, regardless of whether or not they have received a majority of votes cast. No election shall be invalid because a majority of the acreage of the control area or board member district was not represented at the election. Two (2) of the members so elected shall serve until one (1) year from the third Tuesday in July of the year following the election, and three (3) of the members so elected shall serve until two (2) years following such date. The division advisory committee shall decide by lot which members shall serve for these terms.
(e) During the first fifteen (15) days of July next preceding the expiration of the term of any member an election shall be held to elect members of the control area advisory board. The control area advisory board shall call and conduct the election in the same manner prescribed for the first election. Members elected at any election after the first election shall serve for a term of four (4) years. Whenever the office of any member becomes vacant for any cause, a person to fill the vacancy of the unexpired term shall be appointed by the remaining members. The costs of elections shall be paid by the state engineer's office.
(f) Each member of the control area advisory board shall receive the same per diem, mileage and expense allowances while attending and traveling to and from meetings of the board and other official business of the board in the same manner and amount as employees of the state. No person shall represent more than one (1) board member district during any term of office, and no person shall serve on a control area advisory board for more than two (2) consecutive terms.
41-3-914. Adjudication of waters within control area.
(a) After the boundaries of any control area have been determined by the board, the appropriate superintendent shall proceed with the adjudication of unadjudicated wells within the control area. After completing the adjudication, the superintendent shall hold evidence of the adjudication open for inspection by the public at a time and place to be fixed by the superintendent, and notice thereof shall be published in two (2) issues of a newspaper of general circulation in the county or counties where the control area is situated.
(b) If any well owner, lessee or user within a control area refuses to adjudicate a well, or supply the necessary information to permit adjudication of any well, the superintendent may tag and lock the pump or well to prevent use of water therefrom. The penalty for interfering with the tag or lock on a well is as provided in W.S. 41-3-616. The use of water from a well so tagged and locked is prima facie evidence that the well owner, lessee or user has violated the provisions of this section.
(c) The taking of proof, filing objections or contests, giving notices, conducting of hearings, making adjudications of water rights, determining of priorities as between appropriators, issuing of certificate of appropriation, and taking appeals shall, insofar as applicable, and not in conflict with the provisions of this act be governed by the provisions of W.S. 41-4-101 through 41-4-207 and 41-4-211 through 41-4-517.
(d) At the first regular meeting of the board after completion of such proof and advertisement, the board shall cause to be entered in the records of its office an order showing the priorities of right to the use of water in the control area, the amount of appropriation of the parties claiming water therefrom, the character and kind of use for which the appropriation is made, and the places or points of use. The secretary of the board shall issue to each person represented in the determination, a certificate of appropriation signed by the president of the board and attested under seal of the secretary of the board which shall state the name and post-office address of the appropriator, the priority date of the appropriation, the amount of water appropriated, the use to which the water has been applied and, if the appropriation is for irrigation, a description of the legal subdivision of land to which the water is applied, or the place of use if the appropriation is not being used for irrigation. The certificate shall be transmitted by certified mail to the county clerk of the county in which the appropriation has been made and the county clerk shall, upon receipt of the proper fee, record the same and thereupon immediately transmit the certificate to the appropriator. At the time of the submission of final proof of appropriation before the state engineer or superintendent of a water division, a fee not to exceed one hundred dollars ($100.00) shall be collected, which shall be used for advertising the proof of appropriation and recording the certificate. The priority of appropriation shall be the determining factor in adjudicating underground water; the person first making the appropriation being first entitled to the use of the underground water, except as modified by W.S. 41-3-933.
41-3-915. Control areas; hearing to determine adequacy of
water for all appropriators; corrective controls generally; agreements in lieu of controls.
(a) After designation of an area as a control area by the board, the state engineer may temporarily adopt any of the corrective controls provided for by this section, where it appears that immediate regulation is required. After the well adjudication procedure has been completed, the state engineer may, on his own motion, and shall on the petition of twenty (20) appropriators or of one-tenth of the appropriators of water from a control area, cause a hearing to be held before the state engineer and the control area advisory board to determine whether the underground water in the area is adequate for the needs of all appropriators of underground water in such area. Public notice of the time and place of the hearing shall be published once in a newspaper circulated in the area not more than thirty (30) days before the time set for the meeting. If the state engineer finds after the hearing, and after receiving the advice of the control area advisory board, that the underground water in the control area is insufficient for all of the appropriators, he may by order adopt one (1) or more of the following corrective controls:
(i) He may close the controlled area to any further appropriation of underground water, in which event he shall thereafter refuse to grant any applications for a permit to appropriate underground water in that area, provided, that such area may be reopened to appropriations at any time the state engineer shall find on the basis of additional evidence that there is unappropriated water in the area, in which event the state engineer shall reconsider all applications for permits refused on the grounds of the order closing the area;
(ii) He may determine the permissible total withdrawal of underground water in the control area for each day, month or year, and, insofar as may be reasonably done, he shall apportion such permissible total withdrawal among the appropriators holding valid rights to the underground water in the control area in accordance with the relative dates of priority of such rights;
(iii) If he finds that withdrawals by junior appropriators have a material and adverse effect upon the supply available for and needed by senior appropriators, he may order such junior appropriators to cease or reduce withdrawals forthwith;
(iv) If he finds that cessation or reduction of withdrawals by junior appropriators will not result in proportionate benefits to senior appropriators, he may require and specify a system of rotation of use of underground water in the controlled area;
(v) He may institute well spacing requirements if permits are granted to develop new wells.
(b) The state engineer shall cause a copy of any such order to be served upon each person affected thereby in the manner provided for service of process in civil actions.
(c) Appropriators of underground water from a control area may agree to any method or scheme of control of withdrawals, well spacing, apportionment, rotation or proration of the common supply of underground water. The state engineer shall encourage and promote such agreements and supply the parties with information and advice. When the state engineer, with the advice of the control area advisory board, shall find that any such agreement, executed in writing and filed in his office, is consistent with the intent, purposes and requirements of this act, and would not be detrimental to the public interest or to the rights of other persons not parties to the agreement, he shall approve the agreement, and thereafter such agreement shall control, until terminated as hereinafter provided, in lieu of any order issued pursuant to subsection (a) of this section.
(d) Any agreement approved by the state engineer may be terminated by the terms of the agreement, by the consent of the parties, or by order of the state engineer if he finds, after investigation and a public hearing before the control area advisory board, held at least two (2) weeks after one (1) published notice in a newspaper of general circulation in each county in which a part of the control area lies, that the agreement is not being substantially complied with by the parties, or that changed conditions have made the agreement inequitable, or that the continuance of the agreement is no longer consistent with the intent, purpose and requirements of this act, or is a detriment to the public interest or to the rights of other persons not parties to the agreement.
41-3-916. Priority of rights when 1 source of supply.
Where underground waters in different aquifers are so interconnected as to constitute in fact one source of supply, or where underground waters and the waters of surface streams are so interconnected as to constitute in fact one source of supply, priorities of rights to the use of all such interconnected waters shall be correlated and such single schedule of priorities shall relate to the whole common water supply. The state engineer may by order adopt any of the corrective controls specified in W.S. 41-3-915.
41-3-917. Change of location of well without loss of
priority; appeal from action of state board of control or state engineer.
(a) An appropriator of underground water may change the location of his well to a point within the same aquifer in the vicinity of the original location, without loss of priority, by securing approval of the state board of control if the groundwater right has been adjudicated or if the groundwater right has not been adjudicated but the water has been applied to beneficial use. In cases involving domestic or stock water wells which are not adjudicated but the water has been applied to beneficial use, the state engineer may approve a change of location. If the right is not adjudicated and the water has not been applied to beneficial use, approval for the change in location may be granted by the state engineer. No petition shall be granted if the rights of other appropriators shall be injuriously affected thereby. No petition granted shall increase the total amount of the appropriation of water set forth in the original permit. The state board of control and the state engineer may make such regulations as may be necessary to carry out the provisions of this section. The state engineer may approve a change of well location even if water has not been applied to a beneficial use.
(b) A decision by the state engineer granting or denying a petition to change the location of an unadjudicated right under this section may be appealed to the board of control. An appeal may be taken to the district court pursuant to W.S. 16-3-101 through 16-3-115 from an order of the board of control:
(i) Affirming or reversing a decision of the state engineer appealed to the board under this subsection; or
(ii) Granting or denying a petition to change the location of an adjudicated right under this section.
Any person aggrieved by an order of the board or of the state engineer concerning underground water, or by their or his failure to act, may appeal in the manner provided by W.S. 41-4-517, and the Wyoming Administrative Procedure Act.
Any person who withdraws underground water or who fails to stop or reduce the flow of underground water in violation of any order of the state engineer made pursuant to this act, or any person who does not have a permit, certificate or vested right to appropriate underground water who shall withdraw underground water from any well other than a well for stock or domestic purposes as defined in W.S. 41-3-907, is guilty of a misdemeanor and upon conviction shall be punished under W.S. 41-3-616.
41-3-930. Application; who required to file; filing;
contents; use of water from existing well; statement of claim.
(a) Any person who intends to acquire the right to beneficial use of any underground water in the state of Wyoming, shall, before commencing construction of any well or other means of obtaining underground water or performing any work in connection with construction or proposed appropriation of underground water or any manner utilizing the water for beneficial purposes, file with the state engineer an application for a permit to make the appropriation and shall not proceed with any construction or work until a permit is granted by the state engineer, provided, that whenever a bore hole constructed for mineral exploration, oil and gas exploration, stratigraphic information or any other purpose not related to groundwater development shall be found to be suitable for the withdrawal of underground water, application shall be filed with and approved by the state engineer before water from the bore hole is beneficially utilized. The state engineer may authorize the construction and use of multiple wells for industrial purposes for in situ mining, dewatering or use for pollution control or remediation with a single permit if the groundwater to be developed by the proposed appropriation is to be used for a specific purpose within the department of environmental quality permitted boundary and served from a single source of supply. The application shall contain the name and post-office address of applicant or applicants, a detailed description of the proposed use, the location by legal subdivision of the proposed well or other means of obtaining underground water, the estimated depth of the proposed well, the quantity of water proposed to be withdrawn and beneficially utilized in gallons per minute and acre-feet per calendar year, the location by legal subdivision of the area or point of use shall be provided, and such other information as the state engineer may require.
(b) In addition to providing the information required in subsection (a) of this section, applications for permits to appropriate groundwater, geothermal or otherwise, located within fifteen (15) miles of the boundary of Yellowstone National Park shall be accompanied by a written report prepared by a qualified professional and containing such geologic, hydrologic and other information necessary to show that the proposed development will not impair or produce an injurious effect on the hydrothermal system or hydrothermal features located within the boundaries of Yellowstone National Park. The state engineer shall consider all the information provided by the applicant and any other information available to him or necessary to make an informed decision before acting on the application. If upon review of the submitted information or other records available to him, the state engineer determines that the applicant has not shown that the proposed development will not impair or produce an injurious effect upon the hydrothermal features located within the boundaries of Yellowstone National Park, the state engineer shall deny the application for permit. Wells for domestic and stock purposes as defined in W.S. 41-3-907 will be exempt from the requirements of this section.
(c) Nothing in this section shall be construed so as to interfere with the right of any person to use water from any existing well constructed prior to May 24, 1969 where the water is economically and beneficially used for stock or domestic use as provided by W.S. 41-3-907, and the uses from the well are hereby declared to constitute a vested right, provided, that the owner of the water right must have registered the right prior to December 31, 1972. If the water right was not registered prior to December 31, 1972 an application shall be filed in accordance with the provisions of this section to obtain a water right and the applicant shall receive, as the water right priority date, the date the application is received by the state engineer.
41-3-931. Application; when granted generally; denial
subject to review; defects and corrections generally; cancellation. An application for a permit for a well in any areas not designated as a critical area shall be granted as a matter of course, if the proposed use is beneficial and, if the state engineer finds that the proposed means of diversion and construction are adequate. If the state engineer finds that to grant the application as a matter of course, would not be in public's water interest, then he may deny the application subject to review at the next meeting of the state board of control. If the state engineer shall find that the proposed means of diversion or construction are inadequate, or if the application is otherwise defective, he may return the application for correction. If such correction is not made within ninety (90) days, the state engineer may cancel the application.
41-3-932. Public notice of application or petition;
hearing before state engineer and control area advisory board; cost.
(a) Upon the filing of a petition to amend an existing water right or an application to appropriate underground water for any use other than domestic, stockwatering or miscellaneous purposes where the quantity of water to be appropriated is twenty-five (25) gallons of water per minute or less, from an area designated as a control area by the state board of control, the state engineer shall cause to be published, at applicant's expense, in a newspaper of general circulation in the county wherein the proposed well or requested change will be located, for at least once a week for three (3) consecutive weeks, a notice of the filing of the application or requested changes and that objections to the granting thereof may be filed within ten (10) days after the last publication of the notice, on the grounds that there is no unappropriated water in the proposed source of supply or that the granting of the application would be detrimental to the public interest. If objections are filed within the time specified in the notice, the state engineer shall set a date for a hearing on the application or requested changes and the objections thereto and shall notify the applicant or petitioner and the objectors thereof. If the applicant or petitioner questions the standing of the objector, the state engineer shall make written findings of fact on the issue and may overrule the objection on that basis. The hearing shall be before the control area advisory board and the state engineer, and shall be held in an appropriate place within the county in which the proposed well or requested change is to be located. The state engineer, for good cause, may impose costs of the hearing proportionally upon the applicant or petitioner and the objectors. The hearing under this subsection shall be a contested case hearing conducted in conformance with and subject to the provisions of the Wyoming Administrative Procedure Act. A decision by the state engineer granting or denying an application or petition under this subsection may be appealed to the board of control within thirty (30) days of the date of receipt of notice of the decision. Upon appeal and based on the contested case record and upon additional evidence, if any, taken at the direction of the board, the board may affirm, modify or reverse the findings of the state engineer. An appeal from an order of the board of control may be taken to the district court pursuant to the Wyoming Administrative Procedure Act.
(b) If no objections are filed against the application or petition under subsection (a) of this section but the state engineer is of the opinion that the application or petition may be detrimental to the public interest, or desires to obtain the recommendations of the control area advisory board, he shall set a date for a public hearing on the application or petition and shall notify the applicant or petitioner of the time and place thereof. Not less than fifteen (15) days prior to the hearing the state engineer shall cause notice of the hearing to be published, at the expense of the applicant or petitioner, in at least one (1) newspaper having general circulation in the county in which the proposed well or requested change is to be located. The state engineer shall notify the applicant or petitioner of the time and place of the hearing. The public hearing shall be held before the control area advisory board and the state engineer in an appropriate place in the county in which the proposed well or requested change is to be located. In making any determination required by this section, the state engineer may rely upon records and information on file in his office or in the office of the board of control. In the event a hearing is held he shall make known the records and information upon which he relies at least fifteen (15) days before the hearing. A decision by the state engineer under this subsection may be appealed by the applicant or petitioner to the board of control within thirty (30) days of the date of receipt of notice of the decision. Upon appeal the board of control shall conduct a contested case hearing in accordance with its rules and regulations and the Wyoming Administrative Procedure Act. An appeal from an order of the board of control may be taken to the district court pursuant to the Wyoming Administrative Procedure Act.
(c) The application or petition shall be granted and the permit issued only if the state engineer finds, after receiving the advice of the control area advisory board, that there are unappropriated waters in the proposed source, that the proposed means of diversion or construction is adequate, that the location of the proposed well or other work does not conflict with any well spacing or well distribution regulation and that the proposed use would not be detrimental to the public interest. In any contested case hearing conducted under this section, the applicant or petitioner shall bear the burden of proof. If the state engineer finds that the application or petition is incomplete or otherwise defective, he shall return the application or petition for correction. If the correction is not made within ninety (90) days, the application or petition shall be rejected.
(d) Repealed By Laws 2014, Ch. 90, § 2.
(e) A petition to amend an existing water right which originated with the board of control may be subject to additional action by the board of control. Any petition to amend an existing water right granted by the state engineer pursuant to this section, if that decision is not appealed, shall be returned to the board of control for any additional action that may be required by law.
41-3-933. Express conditions limiting rights of appropriator; additional conditions.
It is an express condition of each underground water permit that the right of the appropriator does not include the right to have the water level or artesian pressure at the appropriator's point of diversion maintained at any level or pressure higher than that required for maximum beneficial use of the water in the source of supply. The state engineer may issue any permits subject to such conditions as he may find to be in the public interest.
41-3-934. Time limits to complete construction; extensions; cancellation generally.
If the permit is granted, the applicant shall complete the construction and apply the water to beneficial use before the date specified in the conditions of approval, which shall not be more than three (3) years after the date of approval. The state engineer may extend the period or cancel the permit in accordance with the procedures set forth in W.S. 41-4-506.
(a) Any person constructing any well under a permit shall, within thirty (30) days after the completion or abandonment of such work, report to the state engineer the data required relating to such well, on forms furnished by the state engineer. A well shall be considered complete when it is possible to install a pump and pump water. In the case of an artesian well, completion is the time when the drill rig is moved off of the drilling site.
(b) Adjudication of all ground water rights except stock watering and domestic uses of ground water referenced in W.S. 41-3-907 shall proceed upon completion of the work according to the terms of the permit and the recording on forms furnished by the state engineer of such information as is deemed necessary concerning the works, and the filing of a map signed by a Wyoming licensed professional engineer or land surveyor, showing the location of the well and the point or points of use. The state engineer or his authorized representative shall inspect the works, the lands irrigated or other uses being made of the water upon receipt of the map. The adjudication of stock watering and domestic uses of ground water referenced in W.S. 41-3-907 may be initiated by the state engineer or the appropriator of record and will not require the filing of a map signed by a Wyoming licensed professional engineer or land surveyor, showing the location of the well and the points and areas of use or require the inspection by the state engineer or his authorized representative of the works, the lands irrigated or other uses being made of the water unless, in the discretion of the state engineer, such procedures are deemed necessary and appropriate. At this time the board may consider for adjudication the ground water rights upon proof of beneficial use being submitted by the appropriator.
(c) Adjudication shall proceed in the same manner prescribed for the adjudication of surface water appropriations once the state engineer or his authorized representative has reported his findings to the board. A ground water appropriation attaches to the land for irrigation, or for such other purposes or object for which it was acquired.
(d) In the interest of an orderly adjudication procedure for ground water, the state engineer, with the concurrence of the board, may order adjudication of any ground water appropriations in the state. Upon one (1) year notice, any appropriator whose appropriation is to be adjudicated shall furnish the state engineer all of the documents mentioned in subsection (b) of this section. If any appropriator refuses to supply any of this information, the superintendent may tag and lock the well. Any appropriator that interferes with the tag or lock is subject to the same penalty as provided in W.S. 41-3-938. Use of water well so tagged or locked is prima facie evidence of such interference.
The priority of appropriation of underground water obtained prior to April 1, 1947, shall date from time of completion of the well. The priority of appropriation of underground water obtained subsequent to April 1, 1947, and prior to March 1, 1958, shall date from the filing of registration in the state engineer's office. The priority of appropriation of underground water obtained on or subsequent to March 1, 1958, shall date from the filing of the application for permit in the state engineer's office. Priority of appropriation of underground water for stock or domestic purposes, as defined in W.S. 41-3-907, shall date from the time of completion of the well if properly registered with the state engineer prior to December 31, 1972. If registered with the state engineer subsequent to December 31, 1972, the priority shall date from the filing or registration in the state engineer's office.
41-3-937. Cancellation or suspension of permits or certificates.
Whenever, after notice to and opportunity to be heard, the state engineer finds that the holder of any permit is willfully violating or has willfully violated any provision of such permit or any provision of this act or of any order issued pursuant to this act, the state engineer may cancel or suspend such permit or impose conditions on the future use thereof to prevent such violation, pursuant to W.S. 41-3-616(c). Whenever, after notice to and opportunity to be heard, the board of control finds that the holder of any certificate of registration or certificate of appropriation is willfully violating or has willfully violated any provision of such certificate or any provision of this act or of any order issued pursuant to this act, the board of control may cancel or suspend such certificate or impose conditions on the future use thereof to prevent such violation, pursuant to W.S. 41-3-616(d).
Any person who drills, digs or constructs any works for the securing of underground water without having obtained a permit is guilty of a misdemeanor and upon conviction shall be punished under W.S. 41-3-616.
41-3-939. Groundwater study to assess corrective controls within groundwater control areas.
Subject to available funding, not less than once every ten (10) years the state engineer shall conduct a groundwater study in each county that has a control area designated by the board of control under W.S. 41-3-912 and where the state engineer has ordered one (1) or more corrective controls under W.S. 41-3-915. The study under this section shall assess the effect of the ordered corrective controls, assess recharge of the aquifer compared to water consumption from that aquifer and assess the impact of future development on the aquifer. The study under this section may include mapping, modeling and the drilling of monitoring wells. The state engineer may conduct a study under this section in counties without a control area if deemed necessary by the state engineer. The results of each study conducted under this section shall be made public by the state engineer and shall be reported to the joint agriculture, state and public lands and water resources interim committee not later than sixty (60) days after the study is completed.
41-3-1001. Waters stored for instream flows a beneficial
use of water; natural stream flows allowed for instream flows.
(a) The storage of water in any drainage in Wyoming for the purpose of providing a recreational pool or the release of water for instream flows to establish or maintain new or existing fisheries is a beneficial use of water subject to normal stream loss.
(b) Unappropriated water flowing in any stream or drainage in Wyoming may be appropriated for instream flows to maintain or improve existing fisheries and declared a beneficial use of water on a case by case basis by the state engineer if such use does not impair or diminish the rights of any other appropriator in Wyoming.
(c) Waters used for the purpose of providing instream flows under subsection (a) of this section shall be the minimum flow necessary to establish or maintain fisheries.
(d) Waters used for the purpose of providing instream flows under subsection (b) of this section shall be the minimum flow necessary to maintain or improve existing fisheries.
41-3-1002. Instream flows to be by stream segment; waters
for instream flows may be sold, transferred or otherwise conveyed under certain restrictions; ownership restricted.
(a) All waters used for the purpose of providing instream flows shall be applied only to that segment of the stream for which they are granted. The stream segment and the determination of a minimum amount of water required for instream flow purposes shall be defined specifically.
(b) After waters allowed for instream flows have passed through the specific stream segment, all rights to those instream flow waters are relinquished, and the water shall be available for reappropriation, diversion and beneficial use.
(c) Storage water appropriated for the purpose of providing instream flows in specified stream segments or existing water rights which are converted to instream flow under provisions of W.S. 41-3-1007 of this act may later be sold, transferred or otherwise conveyed to any other purpose pursuant to the requirements of W.S. 41-3-104, except that the board of control shall require that an advertised public hearing be held.
(d) Any person may divert and appropriate, as provided by law, instream flow waters for any beneficial use other than for instream flows at the following places:
(i) Within one (1) mile upstream from any point where the instream flows cross the Wyoming state line;
(ii) Within one (1) mile upstream from any point where the instream flows enter the main stem of the North Platte River;
(iii) Within one (1) mile upstream from any point where the instream flows enter the Big Horn Lake;
(iv) Within one (1) mile upstream from any point where the instream flows enter the Flaming Gorge Reservoir;
(v) Within one (1) mile upstream from any point where the instream flows enter the Palisades Reservoir.
(e) No person other than the state of Wyoming shall own any instream flow water right.
41-3-1003. Game and fish commission; construction of
measuring devices; recommendations; permits; fees and costs.
(a) The game and fish commission shall construct any measuring device the state engineer considers necessary for the administration of an instream flow right.
(b) The state game and fish commission may report to the water development commission annually those specific segments of stream which the game and fish commission considers to have the most critical need for instream flows. The game and fish commission shall identify the points on the stream at which the need for instream flows begins and ends, the time of year when the flows are most critical and a detailed description of the minimum amount of water necessary to provide adequate instream flows.
(c) The water development commission shall file applications in the name of the state of Wyoming for permits to appropriate water for instream flows in those segments of stream recommended by the game and fish commission. The state engineer shall not grant any permits to appropriate or store water for instream flows prior to the completion of the study provided by W.S. 41-3-1004 or prior to the hearing required by W.S. 41-3-1006. Fees and costs of the commission associated with permit applications and adjudication of water rights shall be borne by the game and fish commission.
41-3-1004. Water development commission to determine
storage feasibility; report to the game and fish commission and the legislature.
(a) Immediately after permits have been applied for under W.S. 41-3-1003(c), the water development commission shall determine the feasibility of providing instream flows for the recommended segments of streams from unappropriated direct flows or from existing storage facilities or from new facilities. The feasibility study shall include a determination of water necessary to maintain or improve existing fisheries for water rights under W.S. 41-3-1001(b) or of water necessary to provide fisheries for water rights under W.S. 41-3-1001(a). The feasibility study shall also include the availability of storage sites, the estimated cost of providing any required storage and such other findings and conclusions as the water development commission deems appropriate. The cost of any consultant and any associated costs that the water development commission determines are necessary to complete a feasibility study under this section shall be borne by the game and fish commission. The water development commission shall consult with the game and fish commission prior to entering into any contract related to a feasibility study under this section.
(b) The water development commission shall make a report to the game and fish commission and the legislature outlining their findings.
(c) Repealed by Laws 1987, ch. 50, § 2.
If the water development commission determines that storage of water to provide instream flows is feasible and in the interest of the state of Wyoming, it shall request authority from the legislature to proceed with the design and construction of storage facilities and the storage of sufficient water for such purposes. The costs of the project may be shared with other water users benefiting therefrom, or paid solely from funds appropriated from the water development account, or otherwise as the legislature directs.
41-3-1006. Appropriation of unappropriated waters for direct instream flows.
(a) Any application for a permit to appropriate direct flow waters for the purpose of providing instream flows shall be by stream segment, as defined in W.S. 41-3-1002.
(b) If the water development commission, under W.S. 41-3-1004, determines that storage of water for the purpose of providing instream flows is not feasible but that appropriation of direct flow water appears feasible, the state engineer shall act on applications for permits to appropriate water filed under W.S. 41-3-1003(c) in the name of the state of Wyoming.
(c) Subsequent to submission of an application for an instream flow appropriation, the game and fish commission shall conduct relevant studies on the proposal.
(d) The applicant for an instream flow water right shall publish a notice of the application and hearing in a newspaper of general circulation in the area near the proposed reservoir site or stream segment, once each week for at least two (2) consecutive weeks prior to the hearing provided by subsection
(e) of this section which notice shall briefly describe the application.
(e) Prior to granting or denying the application, the state engineer shall conduct any studies as are deemed necessary to evaluate the proposed instream flow and the necessary amount of water to maintain existing fisheries and shall hold a public hearing. At the public hearing, the game and fish commission shall present its studies and any other interested parties shall present views on the proposed instream flow appropriation. The state engineer may place a condition on the permit, if one is granted, requiring a review of the continuation of the permit as an instream flow appropriation.
(f) If an application for an instream flow appropriation is approved by the state engineer, it shall be deemed that work has been commenced and completed and beneficial use made thirty (30) days after the date of approval for purposes of W.S. 41-4-506 and proof of appropriation shall not be submitted until three (3) years thereafter.
(g) The state engineer shall not issue an instream flow permit where the instream flow right would be included as a portion of the consumptive share of water allocated to the state of Wyoming under any interstate compact or United States supreme court decree.
(h) The amount of water appropriated for instream flow in each river basin in Wyoming shall not result in more water leaving the state than the amount of water that is allocated by interstate compact or United States supreme court decree for downstream uses outside of Wyoming.